HILLCREST AVENUE BYPASS CULVERT - 13-0042-EN - ADMINISTRATIVE CHANGE ORDER #1Administrative Change Order 1
PROJECT:
Hillcrest Avenue Bypass Culvert
CONTRACTOR:
Keystone Excavators, Inc.
371 Scarlet Blvd.
Oldsmar, F134677
DATE:
PROJECT NUMBER:
PO REFERENCE:
COUNCIL AWARD:
DATE OF CONTRACT:
CODE:
May 10, 2019
13 -0042 -EN
18001050
August 14, 2018
September 12, 2018
ENST 180008-CONS-CNSTRC A
3277327-563800-96722 B
3277327-563800-96634 C
SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract
to decrease, increase and add items to accommodate for redesign of the water sewer system - see attached. , ,.
,%axatt3'rI It 4: , %
...—...1.041,1")
J \
'<Fresi% 4t 31
a- tern Q. s
•'-a ii
0.
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Admin Change Order 1 - City Manager
NEW CONTRACT AMOUNT
ACCEPTED BY:
Keysto
ATTEST:
$ 3,982,830.50
$ 33,208.00
$ 4,016,038.50
Assistant City Attorney
Rosemarie Call,
Date:
CITY OF CLEARWATER, in
PINELLAS BOUNTY, FLORIDA
William B. Horne, II
City Manager
By:
Robert C Fornwali
Date:
Recommended By:
City of Clearwater
D. Scott Rice, PE,
roject Manager
City Engineer
Page 2 of 2: Administrative Change Order 1 Hillcrest Avenue Bypass Culvert
ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST
Code B Decreases:
301 F&I 6" DIP WM INCLUDING POLY LF 98 $ 80.00 $ (7,840.00)
WRAP, FITTINGS, & BENDS
303 F&I 6" RESTRAINTS EXISTING EA 4 $ 580.00
PIPE ONLY $ (2,320.00)
307 F&I 6" LINE STOP EA 11 $ 4,888.00 $ (53,768.00)
308 F&I 12" STEEL CASING LF 30 $ 72.00 $ (2,160.00)
309 DEMO & DISPOSE EXISTING WM; LS 1 $ 2,503.00 $ (2,503.00)
DIA. < 6"
Total (Decreases) Code B: $ (68,591.00)
Code B Increases:
304 F&I 6" GV w/BOX EA 4 $ 1,652.00 $ 6,608.00
306 F&I 4" LINE STOP EA 3 $ 4,236.00 $ 12,708.00
Total Increase Code B: $ 19,316.00
Code B Additions:
313 6" C-900 PVC Watermain EA 1094 $ 41.00 $ 44,854.00
314 F&I 4" GV wBox EA 3 $ 1,478.00 $ 4,434.00
315 INSTALL FIRE HYDRANTS, F&I 6" EA 2 $ 2,251.00 $ 4,502.00
GATE VALVE
316 DEMO WATERMAIN, 6" DIAMETER LF 1328 $ 12.00 $ 15,936.00
Total Additions Code B: $ 69,726.00
Total Net (Decreases)/Increases/Additions Code B: $ 20,451.00
Code C Increases:
401 F&I 12" DIP FM, RJ LF
Code C Additions:
414 Forcemain ,12" GATE VALVE EA
415 ForceMain, 12" SLEEVE EA
CONNECTION, Connections at Ends
of ForceMain
9 $ 225.00 $ 2,025.00
2 $
4,518.00 $
3,107.00 $
4,518.00
6,214.00
Total Additions Code C: $ 10,732.00
Total Net (Decreases)/Additions Code C: $ 12,757.00
Total Net(Decreases)/Increases/Additions: $ 33,208.00