COUNTRYSIDE SPORTS COMPLEXDeLotto
Established 1946
Countryside Sports Complex
Date: April 29, 2019
TO: Leroy Chin
City of Clearwater — Engineering Department
100 S. Myrtle Ave., Suite 200
Clearwater, FL 33756
RE: Countryside Sports Complex, 3060 McMullen Booth Road, Clearwater, FL 33761
As requested, enclosed is the proposal for Construction of the Countryside Sports
Complex submitted in accordance for a Guaranteed Maximum Price of $2,168,713
Scope of Work:
Construction of a 2 story building in accordance with the plans as prepared by
Wannamacher Jensen Architects Inc. dated 12/21/17 revised 4/25/18. Site work was completed
by owner direct and excluded for the proposal. All items are in accordance with the proposal
dated 4/29/19 incorporating the clarification and qualifications shown therein.
Cost Detail:
Description
Amount
Cost of Work
$1,757,859
Subtotal
$1,757,859
General Conditions (or General
Conditions/Supervision/Insurance/Bond)
$115,355
Construction Management Fee
$108,178
Contingency
$187,321
Guaranteed Maximum Price
$2,168,713
Project completion duration shall be 240 calendar days from notice to proceed.
Existing Contract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August
4, 2016, based on RFO #24-16.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once the City
receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the
DeLotto
Established 1946
attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not
required.)
For work performed, invoices shall be submitted to the City of Clearwater, Engineering
Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida,
33758-4748. Contingency services may be billed only after written authorization is provided by
the City to proceed with those services.
Viiikg Owen Kohler
Assistant City Attorney
Countersigned:
CtPA<<QAcrCtt-0S
George N. Cretekos
Mayor
ao, -O/9
Date
J.O. DeLotto : Sons, Inc.
By:
i6 J 's E.
Executive Vice President
4-29-19
Date
CITY OF CLEARWATER, FLORIDA
Attest:
By:
Dt Q 0 elle
Rosemarie Call
City Clerk
William B. Horne II
City Manager
_//1 , a /, x/ 9
Date
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
5
5417
ITEM
CODE
DESCRIPTION
SUB -DIVISION DIVISION
COST TOTALS SF COST
ESTIMATE SUMMARY
DIVISION I - GENERAL REQUIREMENTS
General Requirements
General Conditions
DIVISION 2 - EXISTING CONDITIONS
Sitework
DIVISION 3 - BUILDING CONCRETE
Concrete
DIVISION 4 - MASONRY
Masonry
DIVISION 5 - METALS
Structural Steel
DIVISION 6 - WOOD, PLASTICS & COMPOSITES
Rough Carpentry
$27,055
$115,355
$669
$234,374
$103,491
$205,200
$5,580
$142,410
$669
$234,374
$103,491
$205,200
$60,080
4.99
21.29
43.27
19.10
37.88
1.03
Cabinetry $54,500 10.06
DIVISION 7 - THERMAL & MOISTURE PROTECTION $176,625
Waterproofing $23,145 4.27
Thermal - Insulation Included 0.00
Roofing $151,980 28.06
Fire and Smoke Penetrations $1,500 0.28
DIVISION 8 - OPENINGS $83,962
Doors, Frames and Hardware $52,812 9.75
Specialty Doors $8,550 1.58
Entrances, Storefronts and Windows $22,600 4.17
DIVISION 9 - FINISHES $287,709
Plaster, Stucco and Drywall $44,161 8.15
Drywall and Framing $99,305 18.33
Ceilings $78,300 14.45
Flooring $36,243 6.69
Paints and Coatings $29,700 5.48
DIVISION 10 - SPECIALTIES
Miscellaneous Specialties $14,263 2.63
Toilet Partitions and Accessories $21,830 4.03
$36,093
DIVISION I I- EQUIPMENT
Equipment
DIVISION 12 - FURNISHING
Furnishing
DIVISION 14 - EQUIPMENT
Elevator
DIVISION 15 - MECHANICAL
Fire Protection
Plumbing
Heating, Ventilation and Air Conditioning
DIVISION 16 - ELECTRICAL
Electrical
Systems
$0
Owner
$66,300
$19,731
$140,250
$97,540
$157,830
$22,743
$0
Owner
$66,300
$257,521
$180,573
0.00
0.00
12.24
3.64
25.89
18.01
29.14
4.20
SUB -TOTAL COSTS $1,835,007
$1,835,007 338.75
924 E. Busch Blvd. Tampa, Florida 33612.813-935-2191 • Fax 813-935-2456 • www.delotto.com • CGCC58906
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
5
5417
ITEM
CODE
DESCRIPTION
SUB -DIVISION DIVISION
COST TOTALS SF COST
BONDS and INSURANCES
Builder's Risk Insurance
General Liability
Performance & Payment Bond
CONTINGENCY'S
Project Contingency
CONSTRUCTION MGT. FEE
CM Fee
0.75%
1.125%
Owner
$13,763
$24,444
10% $187,321
5.25%
$108,178
$38,207
$187,321
$108,178
0.00
2.54
4.51
34.58
19.97
TOTAL PROJECT CONSTRUCTION COSTS $2,168,713 $2,168,713 400.35
CLARIFICATIONS AND QUALIFICATIONS:
An Wooster stair nosing product 231 BF is included for Stair Nosings at Stair 119.
2 Stainless Equipment Panels/Backspashes are assumed to be the kitchen equipment supplier..
3 Interior Steelcraft Graintech Finish is not available on steel stiffened doors, they will need to be honeycomb or polystyrene.
4 Door and Hardware package are included per the hardware groups revision 003 dated 4/24/19.
5 Fiber optics is not included in this proposal as none are shown to be included.
6 Bleacher Strip Footings are included with this proposal, shell infill is by Others
7 Lockers are by Owner.
8 Storefront is qualified as YKK and windows as PGT.
9 Annodized Aluminum Guardrail is not included with this proposal. (Handrails are included with this proposal)
10 All Kitchen Equipment, Hoods, Fans, Fryers, Refridgerators, and related materials are provided and installed by Others.
1 I Colorgalv process is only included for steel located at the canopy. DEDUCT $13,922 to remove this from the project, which
includes the offset for providing an epoxy coating system at this location.
12 DEDUCT $42,000 to include an aluminum capped grid with a white vinyl ceiling tile in lieu of linear planks at the canopy. The vinyl
tile is white, but able to be painted.
13 ADD $10,542 to include standard hot dipped galvanizing for the steel at the canopy.
ALLOWANCES
I Survey, Layout, & As-Builts $7,500
2 1" Compaction and Fill at Building Slab $669
3 Access Panels $5,400
4 Sealed Concrete Floors $3, 150
5 Pedestrian Coating at Roof Walkway $1,700
924 E. Busch Blvd. Tampa, Florida 3612.813-935-2191 • Fax 813-935-2456 • www.delotto.com • CGCI38906
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
5
5417
LINE ITEM DESCRIPTION
DIVISION
QUANTITY UNIT UNIT PRICE TOTAL COSTS TOTALS NOTES
ESTIMATE SUMMARY
DIVISION 1 - GENERAL REQUIREMENTS
General Requirements
General Cleanup
Final Cleanup
Temporary Protection
Safety Equipment
First Aid
Dumpster and Trash Hauling
Miscellaneous Equipment Rental
Consumable Small Tools
Survey & Layout
Material Testing
Permitting
Subtotal of General Requirement
6 MO 500.00 3000
5417 GSF 0.24 1325 DNS
1 L5 1,250.00 $1.250
6 MO 50.00 $300
6 MO 75.00 $75
12 PULL 525.00 $6,300
1 LS 1,500.00 $1,500
6 LS 250.00 $1,500
1 LS 7,500.00 $7,500 ALLOWANCE
1 LS 4,305.00 $4,305 RE&A
1 LS Owner Owner
$27,055
TOTAL GENERAL REQUIREMENTS
$27,055
DIVISION 2 - EXISTING CONDITIONS
Earthwork
1" Compaction and Fill
Fencing & Gates
Subtotal of Earthwork
16.72 CY 40.00 5669
1 LS Owner Owner
$669
Allowance
TOTAL EXISTING CONDITIONS
$669
DIVISION 3 - CONCRETE
Structural Concrete
Sidewalks at Building (See Marked Up Drawings
Footing Concrete Material
Footing Reinforcing Material
Footing Reinforcing Placement
Strip Forms
Backfill Footings
Slab on Grade
Slab on Metal Deck
Reinforced Masonry Tie Beams
Topping Slab on Insulation & Deck
Termite Treatment
Stair Pan Fill
Concrete Cleanup
Place and Finish Slab on Grade
Place and Finish Slab on Metal Deck
Bleacher Footings (Marked Up Drawing C3)
4" Pad at Lockers
Cane Detection Rail
Dumpster Enclosure
Nose Treads at Stairs 119
Subtotal of Structural Concrete
I SUB 207,145.00 $207,145
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
5417 SF 0.25 1354.25
LS Included Included
LS Included Included
LS Included Included
LS Included Included
21 EA 17,751.00 $17,751
104 SF Included Included
20 LF 40.00 $800
I LS 6,004.00 $6,004
24 EA 55.00 $1,320
$234,374
TOTAL CONCRETE
$234,374
DIVISION 4 - MASONRY
Masonry
Masonry
Corefill 500
Dumpster Enclosure Walls
Subtotal of Masonry
E.L. Shearer
1 SUB 98456.00 $98,456 E.L. Shearer
1 SUB 1,477.00 $1,477 Tailored Foam
1 SUB 3,558.00 $3,558
$103,491
TOTAL MASONRY
$103,491
924 E. Busch Blvd. Tampa, Florida 33612. 813-935-2191 • Fax 813-935-2456 • www.delotto.com • CGC058906
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date: 4/29/2019
Estimate:
Estimate Rev.:
Project SF:
5
5417
LINE ITEM DESCRIPTION
DIVISION
QUANTITY UNIT UNIT PRICE TOTAL COSTS TOTALS NOTES
DIVISIONS - METALS
Structural Steel
Subcontract
Specialty Galvanize & Paint
Structural Steel Columns and Beams
Bar Joists
Joist Girders
Metal Deck - 2" Composite Floor Deck
Miscellaneous Metals - General
Steel Stairs w/ Metal pans
Ships Ladder
Joist Ledger Angle
Pre -cast and Other Bearing Embeds
Structural shear studs
Wall Bracing
Stair Handrails
Single line Wall rails
Elevator Threshold
Elevator Hoist Beam
Sink Supports
Sump Pit Grate
Light guage Truss
- Signage
Subtotal of Structural Steel
SUB 169,000.00 $169,000
LS 20,000.00 $20,000
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
EA 5,200.00 $5,200
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS 7,500.00 $7,500 United
LS Included Included
LS Included Included
LS Included Included
EA 350.00 $2,800 United
LS 500.00 $500 United
LS Included Included See Drywall
United
EA
100.00
$200
$205,200
TOTAL METALS
9205,200
DIVISION 6 - WOOD, PLASTICS & COMPOSITES
Rough Carpentry
Blocking at Roof, Windows, & Doors
Walkable Roof Decking
Subtotal of Rough Carpentry
Architectural Woodwork
Subcontract
Counter at Exterior
Subtotal of Architectural Woodwork
620 LF 9.00 $5,580 DeLotto
3061 SF Included Included See Drywall
$5,580
1 SUB 54,500.00 $54,500 Kinsey
31 SF Included Included
554,500
TOTAL WOOD, PLASTICS & COMPOSITES
$60,080
DIVISION 7- THERMAL & MOISTURE PROTECTION
Waterproofing
Subcontract
Elevator Pit
Sidewalk Caulking
HM Doors
Krysol Waterproofing @ stairs and walkway
Fluid Applied Air Barrier at Plywood
Caulking CMU Joints
Metal Panel Waterproofing
Subtotal of Waterproofing
SUB Below Below
LS 4,135.00 4,135.00 Midstate
LS 1,140.00 1.140.00 Midstate
LS 2,000.00 2,000.00 DeLotto
LS 4,000.00 4,000.00 DeLotto
LS Included Included Kat
LS 2,100.00 2,100.00 Midstate
SUB 9,770.00 $9,770 Midstate
523,145
Thermal - Insulation
Delotto 1 LS 1,200.00 $1,200
Subtotal of Insulation Included
Roofing
Subcontractor 1 SUB 151980 151980
Gutters and Downspouts 100 LF Included Included
Metal Wall Panels 1 LS Included Included
Metal Corner Covers 72 LF Included Included
Scuppers 5 EA Included Included
Roof Drains 7 EA Included Included
60 Mil TPO on R-30 Rigid Insulation 34.65 Sq Included Included
- R-30 Insulation (Tappered) 3465 SF Included Included
Walkable 60 Mil TPO 35 SQ Included Included
RTU 1 Curb, Flash, & Cricket 1 EA Included Included
KSF I Curb, Flash, & Cricket 1 EA Included Included
KEF I Curb, Flash, & Cricket 2 EA Included Included
Allied
924 E. Busch Blvd. Tampa, Rorida 33612. 813-935-2191 • Fax 813-935-2456 • www.delotto.com • CGC058906
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
5417
LINE ITEM DESCRIPTION
DIVISION
QUANTITY UNIT UNIT PRICE TOTAL COSTS TOTALS NOTES
Roof Hatch w/ Ladder
Roof Integral Gutter
Softile Roof Walking Pad
GRV I Curb, Flash, & Cricket
Metal Berridge HR- 16 Fascia
Metal Coping
Roof Walking Pads
Slab Over Rigid Insulation
Built Up Curb
CU Curb, Flash, & Cricket
Piping Curb
Subtotal of Roofing
Fire and Smoke Protection
Fire & Smoke
Subtotal of Fire and Smoke Protection
EA
Included
165 LF Included
220 SF Included
1 EA Included
630 SF Included
491 LF Included
350 SF Included
340 SF Included
40 LF Included
3 EA Included
2 EA Included
I LS
Included
Included
Included
Included
Included
Included
Included
Included
Included
Included
Included
$151,980
1500.00 $1,500 DeLotto
$1,500
TOTAL THERMAL AND MOISTURE PROTECTION $176,625
DIVISION 8 - OPENINGS
Doors, Frames and Hardware
Doors Frames & Hardware
Door 100, 102, 119, 121 w/ Von Duprin 98 Series
Doors 123, 124, 125 are Outswing
Aluminum Drip Caps
Subtotal of Doors, Frames and Hardware
Specialty Doors
Subcontract
Overhead Roll -up Doors
Overhead Door Electric Operators
Subtotal of Specialty Doors
Entrances, Storefront and Windows
Subcontract
Subtotal of Entrances, Storefronts and Windows
1 SUB 52,812.00 $52.812
1 LS Included Included
1 L5 Included Included
I LS Included Included
$52,812
I ALLOW 8,550.00 $8,550
3 EA Included Included
3 EA Included Included
$8,550
1 SUB 22,600.00 $22,600
$22.600
TOTAL OPENINGS
$83,962
DIVISION 9 - FINISHES
Plaster, Stucco and Drywall
Subcontract
STO Powerwall System
- Remove Lath
Subtotal of Plaster, Stucco and Drywall
1 SUB 44,161.00 $44,161
I LS Included Included
I SUB Included Included
$44,161
IDS
Miner
Countryside
KAT
Drywall and Framing
Subcontract 1 SUB 96,805.00 $96,805 MB
Wall Framing (2 Hour) SF 6.50 $0
Drywall and Framing Clean-up GSF 0.25 $0
Engineering I LS 2,500.00 $2,500 MB
Subtotal of Drywall and Framing $99,305
Ceilings
Acoustical Ceiling Tile (2 x 2) 1 SUB 72,900.00 $72,900 MB
Metal Linear Planks 1 LS Included Included
Access Panels I ALLOW 5,400.00 $5,400 ALLOWANCE
Subtotal of Ceilings $78,300
Flooring
Subcontract SUB 9,616.00 $9,616 Flooring Solutions
LVT LS Included Included
Rubber Base LS Included Included
Carpet (Glue Down) LS Included Included
Epoxy Floors SUB 21,777.00 $21,777 Scaife
Floor Preparation LS Included Included
Sealed Concrete Floors
Concrete Pedestrian Coating
I LS 3,150.00 $3,150 ALLOWANCE
340 SF 5.00 $1,700 ALLOWANCE
Subtotal of Flooring $36,243
924 E. Busch Blvd. Tampa, Florida 33612.813-935-2191 • Fax 813-935-2456 • www.delotto.com CGC0S8906
DeLotto
J. 0 DeLotto & Sons. Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
1
5
5417
LINE ITEM DESCRIPTION
DIVISION
QUANTITY UNIT UNIT PRICE TOTAL COSTS TOTALS NOTES
Paints and Coatings
Subcontract
Paint Drywall Walls
Paint Drywall Ceilings
Paint Door Frames
Paint Doors
Seal Floors
Touch up Painting
Exterior Painting
Specialty Painting of Exposed Galvanized Steel
Subtotal of Paints and Coatings
SUB 29,700.00 $29,700
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
LS Included Included
529,700
TOTAL FINISHES
$287,709
DIVISION 10 - SPECIALTIES
Miscellaneous Specialties
Fire Extinguisher (Wall Mount)
Fire Extinguisher (Recessed Cabinet)
Signage
Lockers
Knox Box
XX
Subtotal Miscellaneous Specialties
Toilet Accessories and Partitions
Subonctractors
Toilet Partitions - Floor Mount (Handicap)
Urinal Screens
Toilet Partition - Solid Plastic Premium
Toilet Accessories
Grab Bars
Soap Dispenser
Towel Dispenser
Trash Receptacle
Sanitary Napkin Dispenser/Receptacle
Robe Hooks
Diaper Changing Table
Shower Seat
Hand Dryers
Stainless Plates at Dryers
Subtotal of Toilet Accessories and Partitions
I ALLOW 3,531.00 53,531
7 EA Included Included
1 SUB 10,232.00 510,232
1 LS Owner Owner
1 LS 500.00 5500
1 LS 0.00 50
814,263
PPG
Sign -age
I SUB 9,400.00 59,400 Specialty Installation
I LS Included Included
I LS Included Included
I LS Included Included
I SUB 11,230.00 11,230.00 Specialty Installation
I LS Included Included
I LS Included Included
I LS Included Included
LS Included Included
I LS Included Included
I LS Included Included
I LS Included Included
I LS Included Included
I LS Included Included
6 EA 200.00 1,200.00 DeLotto
521,830
TOTAL SPECAILTIES
$36,093
DIVISION 11 -EQUIPMENT
Miscellaneous Equipment
Install of Owner Provided Equipment
Subtotal Miscellaneous Equipment
18 EA Owner Owner
80
TOTAL EQUIPMENT
50
DIVISION 14 - CONVEYING EQUIPMENT
Elevators
Subcontract
- Pit Ladder (Collapsible)
Subtotal Elevators
I SUB 64,500.00
1 LS
1,800.00
564,500
51,800
566.300
TOTAL CONVEYING SYSTEMS
566,300
DIVISION 15 - MECHANICAL
Fire Protection
Subcontract
Subtotal Fire Protection
Plumbing
Plumbing
Owner Provided Range Connections
Gas Lines
Aluminum Storm & Drains @ Canopy
Subtotal Plumbing
SUB 19,731.00 819,731
$19,731
1 SUB 140,250.00 5140,250
I LS Included Included
1 LS Owner Owner
1 LS Roofer Roofer
8140,250
DeLotto
Schindler
Miken
Clearwater Plumbing
924 E. Busch Blvd. Tampa, Florida 33612 • 813-935-2191 ' Fax 813-935-2456 ' www.delotto.com • CGC058906
DeLotto
J. O. DeLotto & Sons, Inc.
Countryside Sports Complex
City of Clearwater
Clearwater, FL
Date:
Estimate:
Estimate Rev.:
Project SF:
4/29/2019
5
5417
DIVISION
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL COSTS TOTALS NOTES
H.V.AC.
Subcontract
Duct Detectors
Subtotal H.V.AC.
I LS 96,640.00
2 EA
450.00
$96,640
900.00
$97,540
TOTAL MECHANICAL
0257,521
DIVISION 16 - ELECTRICAL
Electrical
Duke Energy Transformer Connection
Owner Provided Range Connections
Stainless Duplex/Low Voltage Covers
USB Ports at Rolling Lockers
Subtotal Electrical
Systems
Cabling
Data
Telephone
PA Sound System
Speaker Wire
- Speaker Install
CATV
Fiber Optic
Fire Alarm
Security System
Subtotal Systems
1 SUB 157,830.00 $157,830
1 LS Included Included
1 LS Included Included
1 LS Included Included
$157,830
1 SUB 7,757.00 $7,757
1 LS Included Included
1 LS Included Included
1 SUB 8,168.00 8,168.00
1 LS Included Included
5 EA 120.00 600.00
I LS 6,218.00 6,218.00
1 LS NIC NIC
1 LS OWNER OWNER
1 LS OWNER OWNER
022,743
TOTAL ELECTRICAL 5180,573
Total Air
DeLotto
J&K
A -Tech
DeLotto
924 E. Busch Blvd. Tampa, Florida 33612 ' 813-935-2191 • Fax 813-935-2456 • www.delotto.com • CGC058906