Loading...
MEMORIAL CAUSEWAY SUBAQUEOUS PIPELINE PROJECT - 14-0041-UT - ADMINISTRATIVE CHANGE ORDER #1ADMINISTRATIVE CHANGE ORDER 1 PROJECT: Clearwater Memorial Causeway Subaqueous Pipelines CONTRACTOR: Andrew Sitework LLC 2511 Palm Ave Fort Myers, FL 33916 DATE: PROJECT NUMBER: 14 -0041 -UT CONTRACT REFEREI 900217 COUNCIL AWARD: October 5, 2017 DATE OF CONTRACT November 3, 2017 CODE: March 6, 2019 3277327-563800-96665 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT increasing and adding line items for a forcemain bypass due to unknown location of an existing gas'main and encountering an 18" forcemain versus the 16" forcemain; and add 59 days to the contract -see STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 3,048,602.70 Admin Change Order 1 -City Manager- $ 289,870.96 $ 3,338,473.66 D T ORM: Owen Ko er, ATTEST: Assistant City Attorney ACCEPTED BY: Andr= By: //Age► Ralp d ,fr Date: Z ---1 Witnesses: Operations 0 Yt_ lb& 01,1 -e ---- Rosemarie Call, Date:--)210c-ii,% _2-1olq CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Kayl ce, Project Manager City Manager D. Scott Rice, PE City Engineer r 4 r Page 2 of 2 Administrative Change Order 1 - Clearwater Memorial Causeway ITEM DESCRIPTION Decreases 10A 16" Tapping Sleeve & Valve 11A 20" Tapping Sleeve & Valve 13A Flowable Fill 16A Temporary Asphalt Pedestrian Trail, Access Drives and Restoration Additions: 19A Sound Attenuation Wall 20A Force Main By -Pass System 21A 18" Pipe and Fittings 22A 18" Tapping Sleeve & Valve 23A 16" Tapping Valve Restock Fee 18A Contingency UNIT OTY UNIT COST TOTAL COST LS 1 $ 23,416.00 $ LS 1 $ 31,375.00 $ CY 220 $ 242.00 $ LS 1 $ 27,407.77 $ LS LS LS LS LS LS (23,416.00) (31,375.00) (53,240.00) (27,407.77) Total (Decreases): $ (135,438.77) 1 $ 146,480.95 1 $ 176,549.38 1 $ 44,931.29 1 $ 29,683.71 1 $ 1,312.50 0.139 $ 189,298.30 Total Increases: $ 146,480.95 $ 176,549.38 $ 44,931.29 $ 29,683.71 $ 1,312.50 $ 26,351.90 $ 425,309.73 Total Net (Decreases)/Additions to PO: $ 289,870.96