Loading...
PROPOSAL - EDDIE C MOORE FIELDS 1 & 4 SITEWORK AND CONCRETE WALKSKEYSTONE EXCAVATORS, INC. CUCO 56698 FPSCV 72520700011996 Date : April 16, 2019 Proposal TO: Leroy Chin City of Clearwater — Parks and Recreation Department 100 S. Myrtle Avenue Clearwater, FL 33756 371 Scarlet Blvd. Oldsmar, FL 34677 Phone 813-854-2342 Fax 813-854-2993 RE: Eddie C. Moore, Fields 1 & 4 Sitework and Concrete Walks City of Clearwater Parks & Recreation Dept , Project Number As requested, enclosed is the proposal for Demolition, Re -Grading and re -construction of Concrete Walkways, submitted in accordance with Plan sheets C-1, C-2, and C-3 received 4/16/2019 , and with emailed clarifications for a Guaranteed Maximum Price of 61.14900 . Scope of Work: Set-up Erosion Controls around work area. Demolish existing Concrete walkways , Re - Grade to proposed elevations , install storm Underdrain pipe and boxes. Pour Concrete Walkways at new grades for improved drainage. See attached quote with complete list of work items that are included. Cost Detail: Description Amount Cost of Work $ 48,339.00 Subtotal $ 48,339.00 General Conditions (or General Conditions/Supervision/InsuranceBond) $ 4,834.00 Construction Management Fee $ 2,417 .00 Contingency 10 % $ 5,559.00 Guaranteed Maximum Price $ 61,149.00 Project Duration shall be 30 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFQ #24-16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. KEYSTONE EXCAVATORS, INC. By: xton esident Date CITY OF CLEARWATER, FLORIDA By: Akt44A-<,---z William B. Horne II City Manager .2)0/ <% Date o form: Attest: Kohler Assistant City Attorney Rosemarie Call City Clerk Eddie C. Moore, FIELDS 1 and 4 work for Parks Dept. , City of Clearwater Quoted Directly to City of Clearwater Sitework / Grading / Concrete work as listed below Date : April 17, 2019 ITEM NO. DESCRIPTION QUANTITY UNITS1 UNIT PRICE TOTAL MOBILIZATION , DEMOLITION , EARTHWORK items 1 Mobilization / Overhead / Supervision - - - KEYSTONE Crew 1 LS ( $ 3,840.00 $3,840.00 , Furnish & Install Silt Fence 554 LF $ 2.00 $1,108.00 2 . . 3 . Machine Sweep Paving Areas/ Sidewalks Daily 1 LS $ 2,878.00 $2,878.00 4 Install TEMPORARY Fence . Fence Material furnished by City. 662 LF ' $ 2.50 $1,655.00 . 5 Furnish & Install Tree Barricades . , None per Meeting of 11 / 5 /20180 LF i $0.00 6 Temporarily Move Bleachers - - By CITY Forces 0 LS $0.00 . Existing Paving, for Selective Demolition of Concrete paving 174 LF $ 2.00 , $348.00 7 Sawcut -f--- -8 CONCRETE PAVING 1,544 SF . $ 8.00 4._ $12,352.00 8. Remove 6" 9 . Remove Wall Curb 43 LF 1 $ 6.00I $258.00 10 . Check Grades / Reconfigure/ Re -Grade Area to correct Drainage problem 1 LS I $ 2,853.00 $2,853.00 1 11 . Storm Underdrain system 12 . 8" A-2000 PVC Underdrain Pipe, with #57 Stone and Fabric envelope 235 LF t $ 41.00 $9,635.00 Install . Spread . Grade Shell on top of Underdrain . 235 LF 1 $ 8.00 $1,880.00 13 Shell material furnished by C 14 . 8" underdrain CLEANOUT BOXES, Including PVC 90 Bends/Fittings 6 EA 1 $ 446.00 $2,676.00 15 . 8" Outfall Pipes with Concrete Miter faces 1 EA $ 203.00 $203.00 Concrete work 16 . Construct WALL CURB at 2 Radiuses 43 LF f $ 30.00 $1,290.00 17 . Construct 6" CONCRETE PAVING, to match New Drainage flow 1,544 SF $ 8.00 $12,352.00 Rent Hydraulic Concrete Pump & Hose Service ( pump Ready -Mix Concrete 1 LS $ 1,750.00 $1,750.00 18 the 440 feet from Parking Lot to work area). Material at Existing/New Concrete area interface 256 LF $ 2.00 $512.00 19 . ADD EXPANSION JOINT Restoration work 20 . -- ---- ---- --- --} ---- � 21 _ Replace Bleachers - By CITY Forces 0 LS $0.00 --� 22 Furnish & Install Bahia Sod - - - - NONE Figured , per Meeting of 11/5/2018 0 SF $0.00 . 23 Irrigation Sprinkler Repairs, Replacement - - - By Others / City 0 j $0.00 24 . Sub -total of Work Items $55,590.00 _._...----------------------_.�— _ $5,559.00 25 10% Contingency $61.149.00 26 . Total of Work Items and Contingency Amoun COMPANY'S NAME : KEYSTONE EXCAVATORS, INC. ADDRESS: 371 Scarlet Blvd CITY: Oldsmar ZIP CODE : 34677 TELEPHONE : 813-854-2342 FAX : 813-854-2993 E MAIL : Dave(a,KevstoneExcavators.com PRINTED NAME : David Atkins SIGNED : TITLE : Estimator DATE April 17, 2019 10% contingency shall be utilized only upon written request by the Contractor for additional scope of work not included in the bill of quantities to the Owner and written approval by the Owner for the additional scope of work in the utilization of the 10% contingency. Any funds not utilized shall be returned to the owner upon close out of the purchase order short.