EAST GATEWAY STORMWATER AND SANITARY IMPROVEMENTS PROJECT - 13-0043-EN - ADMINISTRATIVE CHANGE ORDER #3Administrative Change Order 3 PROJECT: East Gateway Stormwater & Sanitary Sewer Improvements CONTRACTOR: David Nelson Construction Co 3483 Alt 19 Palm Harbor, F134683 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: February 25, 2019 13 -0043 -EN 18001128 January 19, 2017 February 9, 2017 ENST 180009-CONS-CNSTRC A 3217321-563800-96742 B 3217321-563800-96212 C 3217321-563800-96739 D ENRD 180004-CONS-CNSTRC E SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract Due to differences in existing pipes and unknown quantity of sewer laterals, line items are adjusted according -decreasing, increasing and adding items in accordance with field conditions - see attached. / / q STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Ratify&Confirm Change Order 1 -City Council 5/17/2018 Admin Change Order 2 -City Manager -10/19/2018 Admin Change Order 3 -City Manager NEW CONTRACT AMOUNT APPROVE Owen Koh ATTEST: x' C.:i-im' L.� �-��- Rosemarie Call, Date: a Z I 4 3C/'7 $ 11,409,143.90 $ 421,554.60 $ 11,830,698.50 Assistant City Attorney City Clerk CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ,Q,u L '4e -Ir William B. Horne, II City Manager A CEP ED BY: Da Nelson Co4tation C SS Lt.a o' (SEAT. David L. Vekast Date: ` 2.v - l 9 Vekc1Presldeht Witnesses: (\.cijr)ct Recommended By: City of Clearwater Ivan Dimitrov, EI, Project Manager . Scott Rice, PE, City Engineer Page 2 of 2 Administrative Change Order 3: East Gateway Stormwater & Sanitary Sewer Improvements ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Code B Decreases: 323 REMOVE & REPLACE POTABLE WATER EA 83.389091 $ 550.00 $ (4.5,864.00) SERVICE CONNECTION (ALLOWANCE) Code B Additions: 301 F&I 6" DIP WM, RJ; INCLUDING POLY LF 626 $ 45.00 $ 28,170.00 WRAP, FITTINGS, & BENDS 308 F&I 6" GV W/ BOX (CITY 402) EA 3 $ 1,500.00 $ 4,500.00 (ALLOWANCE) (AS DIRECTED BY CITY) 316 F&I 2" AIR VALVE (VAL-MATIC VMC- EA 1 $ 5,750.00 $ 5,750.00 38VC), INCLUDING APPURTENANCES, FITTINGS, BENDS, & CONC. PAD. 319 F&I TEMP B.O. / S. TAP (CITY 408); EA 2 $ 1,250.00 $ 2,500.00 INCLUDING APPURTENANCES, FITTINGS, BENDS, & REMOVAL 320 F&I TEMP CL2 TAP (CITY 408); INCLUDING EA 2 $ 450.00 $ 900.00 APPURTENANCES, FITTINGS, BENDS, & REMOVAL 321 DEMO & DISPOSE EXISTING WM; OTHER LF 337 $ 12.00 $ 4,044.00 THAN A -C WM Total Increases: $ 45,864.00 Total Net (Decreases)/Additions Code B: $ Code C Decreases: 411 CONFLICT STRUCTURE (ALLOWANCE) EA 5 $ 5,000.00 $ 405 DEMO & DISPOSE EXISTING SANITARY PIPI LF 362.22 $ 26.00 $ Total (Decreases) $ (25,000.00) (9,417.72) (34,417.72) Code C Increases: 409 REMOVE & REPLACE SANITARY EA 23 $ 1,100.00 $ 25,300.00 LATERALS (CITY 305) Code C Addition: 415 IDENTIFY, LOCATE, EXTEND & TIE-IN LS 1 $ 9,117.72 $ 9,117.72 EXISTING SANITARY SERVICE LATERAL ON FRANKLIN ST Total Net (Decreases)/Increases/Additions Code C: $ Code D Decreases: 502 F&I 16" RCWM OFFSET/DEFLECTION EA 0.5960 $ 20,000.00 $ (11,920.79) (INCLUDES EXCAVATION, BACKFILL, PIPE, POLY WRAP, RESTRAINTS, INSTALLATION, FITTINGS, RESTRAINT OF EXISTING PIPE) Code D Additions: 511 ADJUST/LOWER RCWM SERVICE LINES EA 13 $ 425.00 $ 5,525.00 512 OFFSET 12" RCWM IN CONFLICT W/NEW LS 1 $ 6,395.79 $ 6,395.79 20" WM Total Additions: $ 11,920.79 Total Net (Decreases)/Additions Code D: $ Total Net (Decreases)/Increases/Additions: $