1919 HARDING STREET DRAINAGE IMPROVEMENTS - 19-0006-EN - NOTICE TO PROCEED t
y
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project: 1919. _rdin- St Drainage Improvements Contract Number: 19-0006-EN
Contract Date: 02Jt17119 Notice to Proceed Date:. 0.1106I1 9
Substantial Completion Date: 03/15/19 Warranty Expiration Date:. 03115/20
The work performed under this Contract has been inspected by authorized representatives of the Owner
and Contractor,and the Project is hereby declared to be substantially completed on the above date.
DEFINITION OF SUBSTANTIAL COMPLETION
Substantial completion is the stage in construction when a project or designated portion thereof
is sufficiently complete in accordance with contract document,;so that the Owner can use the
work, or portion thereof,for its intended use. Items that affect operational integrity and function
f the work mast be capable of continuous use.
The Contractor accepts the above Certificate of Substantial Completion of the outlined project area and
agree t complete and correct the items on the tentative list within the time indicated.
w�
Key t a Excavators, Inc. Print Name of Authorized Representative Date
They,Ownei- accepts this Project as Substantially Complete and assumes full possession of the project on
Mauch 15 2019. The responsibility for utilities, security, and insurance under the Contract Documents
shall be a set for
thin the Contract Documents
M
X 13y.
",-City of Cl arwater o Print Name o Authorized Representative Date
PROJECT ONE YEAR WARRANTY
Contract Section/it,
13.5 WARRANTYICORRECTI PERIOD
If within one year after the date of Substantial Completion or such longer period of time as may be prescribed
y Laws or Regulations or by the terms of any applicable special guarantee required by the Contract
Documents or by any specific provision of the Contract Documents, any Work is found to be defective,
Contractor shall promptly, without cost to the Owner and in accordance with the Owner's wr'i'tten
instructions;(i)correct.such defective 'Werk, or, if it has been rejected by the Owner, remove it from the site
and replace it with Fork that is not defective and(ii)satisfactorily correct or remove and replace any damage
to outer Work or the work of others resulting therefrom...
Where defective Work(and damage to other Work resulting therefrom)has been corrected, removed or
replaced under this paragraph the correction period hereunder with respect to such Work will be extended for
an additional period of one year after such correction or removal and replacement has been satisfactorily
completer.
Substantial Completion Date: 03/15/19 Warranty Expiration Date: 03/15/20
A copy of this signed and executed document should be provided to the following parties:
City Owner Representative,Contractor,City Engineering Construction Office Specialist, Project File
NOTICE-TO-PROCEED
771V Ulkdl
CO TRACT#, 19.0006-Eta
CONTRACT DAME: 1919 HARDING
STREET DRAINAGE IMPROVEMENTS
[SATE, MARCH 4, 2019
TO:
Robert Fornwall
Keystone Excavators, Inc.
371 Scarlett Blvd,
Oldsmar, Ft_ 33677
(313) 267-1543
You are hereby notified to commence WORK in accordance with Contract dated
February 7, 2019, on Wednesday, March 6, 2019, and you shall have the 1919 Harding
Street Drainage Improvements (19-0006-EN) completed within the number of calendar days
after the date when the Contract Time commences to run.
All the work shall be totally completed and ready for the final payment in accordance with the
General Conditions, Article 14.6, within 60 calendar days on Monday,--May 6, 2019.
Owner: City of Clearwater, Florida
By:
PM U RTZ
ENG CONSTRUCTION I!9'GR I PROJECT MGR
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO
PROCEED is hereby acknowledged by:
Keystone Excavators, Inc.
this the day of r , 2019
By: .,Jeff Truxton, Project Manager