DRUID TRAIL WALKWAY - PHASE 4 - 04-0021-PR - ADMINISTRATIVE CHANGE ORDER #2
111 Administrative Change Order 2 PROJECT: Druid Trail Phase 4 CONTRACTOR: Keystone Excavators, Inc 371 Scarlet Blvd Date: July 17, 2018 PROJECT NUMBER: CONTRACT: COUNCIL AWARD: DATE OF CONTRACT: 04 -0021 -PR 900307 December 7, 2017 December 13, 2017 Oldsmar, FI 34677 CODE: ENRD180001-CONS-CNSTRC SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager - 7/30/2018 Admin Change Order 2 - City Manager NEW CONTRACT AMOUNT caz,nyL aaw 04-1<- osemarie Call, Date: : J aa/!- , — l - N CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA $ 3,126,188.51 $ 0.00 $ 0.00 3,126,188.51 a;i4AA, Wi liam B. Horne, II City Manager Owen Kohler, Assistant City Attorney ACCEPTED BY: Keystone Excavators;:Inc. By: Robert C Fornwalt, Date: 13\ 20,7 Witnesses: (two) Recommended By: City of Clearwater Paul Bertels, D. Scott Rice, PE, Project Manager hr City Engineer Page 2 of 2 Administrative Change Order 2: Druid Trail Phase 4 ITEM DESCRIPTION UNPI Qty UNIT COST TOTAL COST Decreases: 3 104-10-3 Sediment Barrier LF 2,662.5 $ 2.00 $ (5,325.00) 4 Inlet Protection System EA 33 $ 24.00 $ (792.00) 9 160-4 Stabilization (Type B) (6" Trail) SY 3,076.27 $ 6.10 $ (18,765.25) 10 Crushed Concrete Base, 6" SY 4,012.01 $ 16.00 $ (64,192.18) 13 (1") TN 126.85 $ 133.00 $ (16,871.05) 23 Valve Boxes, Adjust EA 10 $ 245.00 $ (2,450.00) 24 425-7 Replace Manhole Cover EA 1 $ 868.00 $ (868.00) 28 430-175-124 Pipe Culvert Optional Material LF 16 $ 78.00 $ (1,248.00) (Storm & Cross Drain) (Round) (24") 30 Median Curb LF 200 $ 30.50 $ (6,100.00) 31 Header Curb LF 6,887.5 $ 17.25 $ (118,809.38) 32 Straight Curb LF 131 $ 18.75 $ (2,456.25) 63 1080-14 Utility Fixtures, Relocate, Water Meter EA 9 $ 275.00 $ (2,475.00) Total (Decreases): $ (240,352.11) Increases: 11 Optional Base, Group 10 SY 48.0 $ 9.00 $ 432.00 22 425-5 Manhole, Adjust EA 1.0 $ 725.00 $ 725.00 25 425-11 Drainage Structure - Modify Existing EA 1.0 $ 3,255.00 $ 3,255.00 33 522.1 Concrete Sidewalk (4") SY 1,638.1788 $ 42.00 $ 68,803.51 34 522-2 Concrete Sidewalk and Driveways, 6" SY 2,157 $ 58.00 $ 125,106.00 Thick 37 550-10-212 Fencing, Type B, 5.0' w/ Vinyl LF 2 $ 61.25 $ 122.50 Coating 39 630-2-11 Conduit, Furnish & Install, Open LF 203 $ 6.50 $ 1,319.50 Trench 40 632-7-1 Signal Cable - New or Reconstructed PI 1 $ 4,890.00 $ 4,890.00 Intersection (F&I) 41 635-2-11 Pull and Splice Box, F&I, 13" x 24" EA 8 $ 795.00 $ 6,360.00 Cover Size 43 646-1-11 Aluminum Signal Pole, Pedestal EA 4 $ 860.00 $ 3,440.00 48 665-1-12 Pedestrian Detector, F&I, Accessible EA 8 $ 435.00 $ 3,480.00 51 700-1-50 Single Post Sign, Relocate EA 3 $ 100.00 $ 300.00 53 706-3 Retro -Reflective Pavement Markers EA 12 $ 9.80 $ 117.60 66 1644-400 Fire Hydrant, Relocate EA 1 $ 5,265.00 $ 5,265.00 96 630-2-12 Conduit, Furnish & Install, Directional LF 464 $ 24.00 $ 11,136.00 Bore Additions: 98 653-1-12 Pedestrian Signal, Furnish & Install, AS LED Countdown, 2 Way Total Increases: $ 234,752.11 4 $ 1,400.00 $ 5,600.00 Total Net (Decreases)/Increases/Additions: $ 0.00