PROPOSAL - MCMULLEN TENNIS COMPLEX - ADD FOUR NEW TENNIS COURTSKEYSTONE EXCAVATORS, INC. Proposal CUCO 56698 FPSCV 72520700011996 Date December 20, 2018 TO: Leroy Chin, Park, Planning & Project Manager City of Clearwater - Parks & Recreation Dept. 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RE: McMullen Tennis Complex , Add 4 New Tennis Courts City of Clearwater, Parks & Recreation Department 371 Scarlet Blvd. Oldsmar, FL 34677 Phone 813-854-2342 Fax 813-854-2993 As requested, enclosed is the proposal to Clear and Grub, perform Earthwork and Construct 4 new Tennis Courts with Pole Sports Lighting submitted in accordance with technical specifications, plans , and clarifications, for a Guaranteed Maximum Price of $ 798,921 .00 Scope of Work: Construct 4 new Lighted Tennis Courts . Install Storm Drainage and construct Pond; Construct Concrete Curbs around Courts ; all conduit and piping to supply water ; all piping, wiring, boxes , poles and connections to install Musco Sports Lighting.; install finish surface and all stripes, nets ; furnish and install Cabanas on concrete pads. See attached mute for detailed listing of work items. Cost Detail: Description Amount Cost of Work $ 641,235.00 Subtotal $ 641,235.00 General Conditions (or General Conditions/Supervision/Insurance/Bond) $ 62,010.00 Construction Management Fee $ 31,965.00 Contingency $ 63,711.00 Guaranteed Maximum Price $ 798,921.00 Project Duration shall be 75 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFO #24-16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less throe $150,000 a bent is 1801 required) For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Approved as to form: fivC kkh Owen Kohler Assistant City Attorney Countersigned: C(2Ortt^CrCKth5 George N. Cretekos Mayor 4_414a-4'10 IQ 1D to KEYSTONE EXCAVATORS, INC. By: fj� Robert�alf � 1' President Date CITY OF CLEARWATER, FLORIDA Attest: By) z &- 2 Rosemarie Call City Clerk J.Lvis 8. 146.4-12.—it- William B. Horne II City Manager Date Bond No.: PUBLIC CONSTRUCTION BOND (1) This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR Keystone Excavators, Inc. 371 Scarlet Blvd. Oldsmar, FL 34677 (813) 854 — 2342 PROJECT NAME: PROJECT NO. : SURETY Developers Surety And Indemnity Company 1771 Cowan Ave., Suite 100 (727) 781-9797 McMullen Tennis Complex , Add 4 OWNER City of Clearwater Parks & Recreation Dept 100 S. Myrtle Avenue Clearwater, FL 33756 (727) 562-4750 New Tennis Courts PROJECT DESCRIPTION: construct a gravity sewer system including approximately 250 LF of gravity sewer piping, 3 precast manholes, and other appurtenances BY THIS BOND, We Keystone Excavators, Inc. , as Contractor, and Developers Surety and Indemnity Company, a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of $798,921.00, for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated December 19, 2018 , between Contractor and Owner for construction of McMullen Tennis Complex , Add 4 New Tennis Courts , the contract documents being made a part of this bond by reference (which include the Advertisement for Bids, Proposal, Contract, Surety Bond, Instructions to Bidders, General Conditions, Plans, Technical Specifications and Appendix, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and Bond No.: PUBLIC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of 20 (If sole Ownership or Partnership, two (2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). WITNESS: KEYSTONE EXCAVATORS , INC. By: Title: President Print Name: Robert Fornwalt WITNESS: Corporate Secretary or Witness Print Name: Print Name: (affix corporate seal) Developers Surety and Indemnity Company By: ATTORNEY-IN-FACT Print Name: (affix corporate seal) (Power of Attorney must be attached) McMullen Tennis Complex , Add 4 new Clay Courts Tennis Courts, Lighting, Utility work Included as listed below Date : Der.. 211$ ITEM NO. DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL MOBILIZATION , DEMOLITION , EARTHWORK items 1 . MOBILIZATION 1 LS $ 3,860.00 $3,860.00 2 . SURVEY and AS-BUILTS 1 LS $ 12,504.00 $12,504.00 3 . SILT FENCE 1,320 LF $ 1.50 $1,980.00 4 . TREE BARRICADES 840 LF $ 5.00 $4,200.00 5 . TREE REMOVE & HAUL ; 8" to 12" 22 EA $ 1,321.00 $29,062.00 6 . TREE REMOVE & HAUL ; 13" to 24" 18 EA $ 1,602.00 $28,836.00 7 . TREE REMOVE & HAUL ; 24" to 36" 1 EA $ 2,874.00 $2,874.00 8 . CLEAR BRUSH & HAUL 1.25 ACRES $ 2,960.00 $3,700.00 9 . EXCAVATE POND, HAUL TO FILL AREA, PLACE, COMPACT to Grade ( Balanced Site, No Excess Fill ) 1 LS $ 11,084.00 $11,084.00 10 . Sub -total of Initial World Clearing / Earthwork Items $ 98,100.00 11 . - - - STORM DRAINAGE - - - 12 . 15" CONTECH, A-2000 STORM PIPE 53 LF $ 36.00 $1,908.00 13 . 15" MITERED END SECTION 1 EA $ 544.00 $544.00 14 . CONTROL STRUCTURE & SKIMMER, and CONCRETE SUMP PAD 1 LS $ 5,493.00 $5,493.00 15 . - - - WATER MAIN Items - - - 16 . 3/4" PVC WATER PIPE to Water Cooler/Fountains 520 LF $ 12.00 $6,240.00 17 . 1" PVC DRAIN PIPES And 6" STONE BED DRAIN SUMPS 2 EACH $ 223.00 $446.00 18 . *INSTALL* WATER DRINKING FOUNTAINS 2 Ea $ 745.00 $1,490.00 19 . CITY FURNISHES DRINKING FOUNTAINS - By Others 20 . WATER METER 1 EA $ 2,831.00 $2,831.00 21 . CONNECT TO EXISTING WATER SOURCE / PIPE 1 EA $ 830.00 $830.00 22 . 3" PVC SUPPLY PIPE to Tennis Court Hydro -Grid System 560 LF $ 17.00 $9,520.00 23 . - - - IRRIGATION Items - - - IRRIGATION PIPE , VALVES, SPRINKLERS, etc - - 24 . BY CITY's IRRIGATION SUB B Others y 25 RAINBIRD ESP-LXME/F CONTROLLER , METAL ENCLOSURE & CONCRETE PAD BY KEYSTONE Per Note 8 , Sheet 2 of Nov. 21 Bid Scope of Work 1 EA $ 3,451.00 $3,451.00 26 . 4" PVC SLEEVES under sidewalk, for Irrigation 60 LF $ 8.25 $495.00 27 . 2" PVC SLEEVES under sidewalk, for Irrigation 40 LF $ 7.00 $280.00 28 . TENNIS COURT work Items 1 LS $ 271,051.00 $271,051.00 29 . 6" x 12" HEADER CURB included Above 30 . Under -Court PIPES and BASE included Above 31 . GATE VALVES , BALL VALVES, BOXES included Above 32 . FLOW METER - - By KEYSTONE ( See Watermain Items) included Above 33 . FINISH SURFACE & STRIPES included Above Page 1 of 2 McMullen Tennis Complex , Add 4 new Clay Courts Tennis Courts, Lighting, Utility work Included as listed below Date : ITEM NO. DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL 34 . NETS ACROSS the playing surface of Courts included Above 35 . CONCRETE PADS at Cabanas included Above 36 . FURNISH & INSTALL CABANAS included Above 37 . FURNISH P.E.-STAMPED SHOP DRAWINGS for Cabana's 1 EA $ 1,500.00 $1,500.00 37 . SITE FURNITURE/ BENCHES, etc - - BY OTHERS / CITY - By Others 38 . ELECTRICAL Work, TO INCLUDE BELOW ITEMS : 1 LS $ 216,366.00 $216,366.00 39 . Electrical CONDUIT, Including TO COURTS ( for Receptacles) included Above 40 . MUSCO LIGHT / POLE Package, INCLUDING TAX included Above 41 . Light POLE FOUNDATIONS ( 12' Deep) included Above 42 . RECEPTACLES in Court area included Above 43 . POLE LIGHTS included Above 44 . SERVICE, CONNECT to Duke Energy Source included Above 45 . - - - FINISH Work Items - - - 46 . FENCE - - BY OTHERS / CITY - By Others 47. 4" thick CONCRETE SIDEWALK 4,150 SF $ 6.00 $24,900.00 48 . *BAHIA* SOD at POND and BETWEEN Pond & Courts 25,100 SF $ 0.55 $13,805.00 49 . *FLORATAM* SOD around Courts 18,600 SF $ 0.75 $13,950.00 50 . OTHER GRASSING - - BY OTHERS - By Others 51 . IRRIGATION, LANDSCAPING - - - BY OTHERS / CITY - By Others GENERAL CONDITIONS / OFFICE OVERHEAD / FIELD SUPERVISION to 52 coordinate with Other SubContractors, Price out Changes, process Change Orders, Field -Adjust Work Areas, Supervise Crew's work to City's satisfaction. 1 LS $ 62,010.00 $62,010.00 53 . Sub -total of Work Items $735,210.00 54. Contingency $63,711.00 55 . Total of Work Items and 10% Contingency Amount COMPANY'S NAME : KEYSTONE EXCAVATORS, INC. ADDRESS: 371 Scarlet Blvd CITY: Oldsmar ZIP CODE : 34677 TELEPHONE : 813-854-2342 FAX : 813-854-2993 E MAIL : Dave(4KeystoneExcavators.com PRINTED NAME : David Atkins SIGNED : $798,921.00 TITLE : Estimator DATE : December 19, 2018 10% contingency shall be utilized only upon written request by the Contractor for additional scope of work not included in the bill of quantities to the Owner and written approval by the Owner for the additional scope of work in the utilization of the 10% contingency. Any funds not utilized shall be retumed to the owner upon close out of the purchase order short. THE BIDDER'S GRAND TOTAL ABOVE IS HIS TOTAL BID BASED ON HIS UNIT PRICES AND LUMP SUM PRICES AND THE ESTIMATED QUANTITIES REQUIRED. THIS FIGURE IS FOR INFORMATION ONLY AT THE TIME OF OPENING BIDS. THE CITY WILL MAKE THE TABULATION FROM THE UNIT PRICES AND LUMP SUM PRICES BID. IF THERE IS AN ERROR IN THE TOTAL BY THE BIDDER , IT SHALL BE CHANGED AS ONLY THE BID'S UNIT PRICES AND LUMP SUM PRICES SHALL GOVERN . THE CITY RESERVES THE RIGHT TO REJECT ALL BIDS. Page2of2