CLEARWATER GAS SYSTEM FACILITY REDEVELOPMENT - 15-0043-GA - ADMINISTRATIVE CHANGE ORDER #1ADMINISTRATIVE CHANGE ORDER 1 DATE: November 26, 2018 PROJECT: PROJECT NUMBER: Clearwater Gas System Facility Redevelopment CONTRACT REFERENCE: CONTRACTOR: COUNCIL AWARD: Walbridge Aldinger LLC 100 S. Ashley Drive, Suite 350 DATE OF CONTRACT: Tampa, FL 33602 CODE: 15 -0043 -GA 900293 December 7, 2017 December 12, 2017 3237323-563600-96384 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing the contract by Owner Direct Purchases (ODP) and funding scope modifications resulting from design revisions to the 100% construction documents. GMP was based on 90% documents, see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 23,359,100.00 Admin Change Order 1 -City Manager- $ (2,512,849.46) $ 20,846,250.54 APP VED A TO FORM: Owen Kolher, ATTEST: utuyuka- Assistant City Attorney Rosemarie Call, Date: %& n/4 iq1 6A' CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager ACCEPTED BY: Walbridge Aldinger LLC By: Caleb Westfall, Date: j7f i1 II Project Manager Witnesses: y: ity of Clearwater Tar14*I4i41). vet Assstant Eng Director 74FJhuM D. ScoRice, PE, City Engineer Page 2 of 2 Administrative Change Order 1 - Clearwater Gas System Facility Redevelopment ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Decreases: 31 Sitework & Utilities LS 0.0123 $ 3,314,380.00 $ (40,835.00) 38 Final detailing/permit requirement LS 1 $ 181,200.00 $ (181,200.00) allowance (1% of SDC) Total (Decreases) $ (222,035.00) Increases: 3 Concrete LS 0.0251614 $ 2,121,742.00 $ 53,386.00 4 Masonry LS 0.01137965 $ 1,649,875.00 $ 18,775.00 5 Metals LS 0.0747179 $ 1,357,747.00 $ 101,448.00 6 Wood, Plastics, Composites LS 0.06566482 $ 61,220.00 $ 4,020.00 7 Thermal Moisture Protection LS 0.09082882 $ 1,036,444.14 '$ 94,139.00 8 Openings LS 0.04094954 $ 794,026.00 $ 32,515.00 9 Finishes LS 0.03888741 $ 1,630,939.00 $ 63,423.00 10 Specialties LS 0.07150962 $ 209,762.00 $ 15,000.00 23 HVAC LS 0.06480021 $ 2,559,251.00 $ 165,840.00 26 Electrical LS 0.05431504 $ 3,379,782.00 $ 183,573.00 90 CM Fee LS 0.07228872 $ 873,857.00 $ 63,170.00 Total Increases: $ 795,289.00 Total Net (Decreases)/Increases to PO: $ 573,254.00 Decreases for ODP: 5 Metals LS 0.24095896 $ 1,357,747.00 $ (327,161.30) 7 Thernal & Mositure Protection LS 0.13534759 $ 1,198,683.00 $ (162,238.86) 8 Openings LS 0.39270691 $ 794,026.00 $ (311,819.50) 9 Finishes LS 0.19500412 $ 1,630,939.00 $ (318,039.82) 23 HVAC LS 0.30056874 $ 2,559,251.00 $ (769,230.85) 26 Electrical LS 0.27845493 $ 3,379,782.00 $ (941,116.97) 31 Sitework & Utilities LS 0.077389 $ 3,314,380.00 $ (256,496.16) Total (Decreases) for ODP: $ (3,086,103.46) Total Net (Decreases) to Contract: $ (2,512,849.46)