EMERGENCY OPERATIONS DATA CENTER AT FIRE STATION #48 GUARANTEED MAXIMUM PRICEBIIIMOBE CONSTRUCTION CO.. I N C Emergency Operations Data Center At Fire Station #48 Guaranteed Maximum Price Proposal October 30, 2018 BILTMORE CONSTRUCTION October 30, 2018 TO: Jenelle Ostrowski, P.E. City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: EMERGENCY OPERATIONS DATA CENTER (EOC) AT FIRE STATION #48 and CITY OF CLEARWATER ENGINEERING DEPARTMENT PROJECT NUMBER 17 -0013 -FI As requested, enclosed is the proposal for construction/demolition of the Emergency Operations Data Center (EOC) at Fire Station #48 submitted in accordance with technical specs/plans/clarifications of the scope of work for a Guaranteed Maximum Price of $1,903,854.00. Project Duration shall be 270 calendar days from the date of the Notice to Proceed. 1055 Ponce de Leon Boulevard • Belleair, Florida 33756 • Ph: 727.585.2084 • Fax: 727.585.2088 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Emergency Operations Data Center at Fire Station #48 Guaranteed Maximum Price (GMP) Proposal PROJECT SUMMARY Emergency Operations Data Center at Fire Station #48 1700 North Belcher Road Clearwater, Florida Construction of a stand-alone 3,339 gross square foot, one-story, cast -in-place concrete, masonry and structural stud truss building on the site of City of Clearwater Fire Station 48 located at 1700 North Belcher Road, Clearwater, Florida. The new building and connecting structure are to be constructed in accordance with the 2017, 6th Edition of the Florida Building Code, the Fire Prevention, 5th Edition Code and in accordance with Construction Documents enumerated herein as prepared by Alex Plisko Architecture, PA, AIA. Project includes minimal selective demolition in the existing Training Building to create a new corridor that will connect it to the new building. Site work is limited to removal of asphalt, preparation of the building pad and restoration of areas disturbed by construction activities. New facility to have metal stud/gypsum board walls, stucco exterior, standing seam roof, access flooring, acoustical ceilings, stand- alone HVAC system, clean agent fire suppression system, power, lighting and emergency generator. There are no toilet rooms. October 30, 2018 BCC Project #990 Page 3 Emergency Operations Data Center at Fire Station #48 Itemized Description of the Trade Work Base GMP Amount Division 2 -Site Construction $64,423.00 Division 3 -Concrete $74,436.00 Division 4 -Masonry $61,338.00 Division 5 -Metals $106,495.00 Division 6 -Wood and Plastics $5,000.00 Division 7 -Thermal and Moisture Protection $91,300.00 Division 8- Doors and Windows $26,800.00 Division 9- Finishes $191,405.00 Division 10- Specialties $3,000.00 Division 11 -Equipment $0.00 Division 12 -Furnishings $0.00 Division 13- Special Construction $0.00 Division 14- Conveying Systems $0.00 Division 15- Mechanical $289,426.00 Division 16 -Electrical $330,000.00 Subtotal Subcontractor Direct Costs $1,243,623.00 Liability Insurance $20,588.00 Performance and Payment Bond $18,716.00 Builder's Risk Insurance By Owner Subtotal Bond & Insurance $39,304.00 Survey Allowance $4,000.00 Temporary Utility Consumption Costs Allowance $5,000.00 Material Testing Allowance $7,240.00 Dewatering Allowance $5,000.00 General Requirements/Conditions/Staffing $336,706.00 Project Contingency (10% of SDC) $125,000.00 Preconstruction Services $16,000.00 Overhead & Profit (6% of $1,770,873.00) $105,952.00 Alternate # 1 -Lightning Protection $12,782.00 Alternate # 2 -Wall Insulation $3,247.00 Subtotal $620,927.00 TOTAL GUARANTEED MAXIMUM PRICE $1,903,854.00 Alternate # 3 -Electrical Floor Boxes -$2,228.00 Alternate # 4 -Aluminum Acoustical Ceiling Grid $2,000.00 B BJLTMORE CONSTRUCTION Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFQ #24-16 and the Emergency Operations Data Center at Fire Station #48 GMP dated October 30, 2018 Pages 1-14 including the Enumeration of Documents (3 pages) and the Preliminary Construction Schedule (6 pages). If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. City Code: 3157519-563600-94888 Biltmore Construction Co., Inc. By: Jeff Parker Vice President Date CITY OF CLEARWATER, FLORIDA Approvetas to for : Attest: � C� Owen Kohler Assistant City Attorney Countersigned: cfeoi.PAcfck.os By: 11/7,0 Rosemarie Call City Clerk *4,, i/4 George N. Cretekos William B. Horne II Mayor City Manager 14 1111, 1055 Ponce de Leon Boulevard • Belleair, Florida 33756 • Ph: 727.585.2084 • Fax: 727.585.2088