HARBORVIEW CENTER DEMOLITION - 09-0049-EN - GUARANTEED MAXIMUM PRICE PROPOSALli BILTVIORE CONSTRUCTION November 16, 2018 TO: Jenelle Ostrowski, P.E. City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: HARBORVIEW CENTER DEMOLITION and CITY OF CLEARWATER ENGINEERING DEPARTMENT PROJECT NUMBER 09 -0049 -EN As requested, enclosed is the proposal for demolition of the Harborview Center submitted in accordance with technical specs/plans/clarifications of the scope of work for a Guaranteed Maximum Price of $1,878,897.00. Project Duration shall be 210 calendar days from the date of the Notice to Proceed. 1055 Ponce de Leon Boulevard • Belleair, Florida 33756 • Ph: 727.585.2084 • Fax: 727.585.2088 B11 �rjlYl�lti CONSTRUCTION CO.,INC. Harborview Center Demolition Guaranteed Maximum Price Proposal November 16, 2018 BII 1_ O E CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal TABLE OF CONTENTS ❖ Article 1—Guaranteed Maximum Price (GMP) Proposal ❖ Project Summary ❖ Exhibit A - Enumeration of Contract Documents ❖ Exhibit B - Allowances ❖ Exhibit C - Assumptions and Clarifications ❖ Exhibit D -Guaranteed Maximum Price Breakdown ❖ Exhibit E - Construction Schedule Page 1 BILT:VIORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal ARTICLE 1- Guaranteed Maximum Price (GMP) Proposal Biltmore Construction Co., Inc. proposes to complete the work, as described herein, for the Guaranteed Maximum Price (GMP) of One Million, Eight Hundred Seventy Eight Thousand, Eight Hundred Ninety Seven Dollars ($1,878,897.00) This Price is for the performance of the Work as described herein and in accordance with the Contract Documents and Exhibits A through Exhibit F. This Guaranteed Maximum Price (GMP) proposal must be accepted in writing by the Owner on or before December 31, 2018. After said date, this Guaranteed Maximum Price (GMP) proposal shall be null and void, absent the express written acceptance by Biltmore Construction Co., Inc. By acceptance of the GMP and issuance of a Contract Amendment, the City of Clearwater hereby incorporates the GMP into the Agreement between Owner and Construction Manager. Page 2 B BILT_VIORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal PROJECT SUMMARY Harborview Center Demolition 300/320 Cleveland Street Clearwater, Florida Complete demolition of the existing Harborview Center Building located at 300/320 Cleveland Street, Clearwater, Florida. Project includes asbestos abatement, installation of helical tie -backs, based on option # 1, to preserve the existing basement walls along Osceola Ave and Cleveland Street and back- filling followed by sodding with Bahia sod. Page 3 B BILTMORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal EXHIBIT A — Enumeration of Contract Documents Contract Documents include the Drawings, Specifications, Addenda (Construction Documents), the Construction Manager at Risk Services for Continuing Contracts Agreement, General Conditions, Supplementary Conditions as expressly noted herein, and this Exhibit A, as well as the Guaranteed Maximum Price (GMP) Proposal in its' entirety. This GMP Proposal is expressly recognized as a Contract Document inasmuch as it forms the basis upon which the Guaranteed Maximum Price is based. As such, in the event there is any disagreement, conflict, or ambiguity between the GMP Proposal and any other Contract Document, the GMP Proposal shall govern. The Owner's issuance of any Notice to Proceed, Purchase Order, or any other written directive or instructions to proceed with the Work, after this signed GMP Proposal has been delivered by Biltmore to the Owner, shall constitute an express acceptance of the foregoing Enumeration of Contract Documents and the enforceability thereof. See Attached Page 4 11/13/18 Discipline Structural Structural Structural Structural Structural Structural Structural Division Description Earthwork Existing Conditions Haborview Demolition Center Enumeration of Documents Drawing No Drawing Title S1.0 Cover Sheet S1.1 General Structural Notes Existing Basement Lower Level S2.0 Foundation Plan Existing Grade Main Level Foundation S2.1 Plan S3.0 Sections S3.1 Sections S3.2 Interior Wall Elevations Spec No. 00001 00002 00005 00010 000110 31 66 15 02 41 16 Spec Description DESI Test Boring Results DESI Geotechnical Investigation Demolition Asbestos Survey Report of Condition Survey and Document Revi, Biller Reinhart Engineering Technical Specifications Cover Helical Tie -Back Anchors Structure Demolition Revision No. 0 0 As prepared by Biller Reinhart Engineering Group, Inc. Drawing Date 10/12/2018 10/12/2018 Received Date 11/6/2018 11/6/2018 Drawing Set For Review For Review 0 10/12/2018 11/6/2018 For Review 0 10/12/2018 0 10/12/2018 0 10/12/2018 0 10/12/2018 Revision No 0 0 0 0 0 0 0 Issued Date 3/31/2010 4/28/2010 9/7/2018 4/6/2010 10/12/2018 10/12/2018 10/12/2018 11/6/2018 11/6/2018 11/6/2018 11/6/2018 Received Date 11/6/2018 11/13/2018 11/6/2018 11/13/2018 11/6/2018 11/6/2018 11/6/2018 For Review For Review For Review For Review Specification Set Surveys and Tests Surveys and Tests Surveys and Tests Surveys and Tests Technical Specifications Technical Specifications Technical Specifications BIL[oRE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal EXHIBIT B —Allowances The Allowances noted below represent reasonably anticipated values included in this GMP Proposal to cover the cost of certain items absent or not specified in sufficient detail in the Construction Documents as listed in the ENUMERATION OF CONTRACT DOCUMENTS Section of this GMP Proposal or for which uncertainty remains. The amount of the Allowance stipulated herein is inclusive of all labor, materials, equipment, taxes, delivery, insurances, bond and fees necessary to perform the anticipated work, unless otherwise noted. Allowances- Unless otherwise specifically noted, the term "Allowance" refers to the amount of money allocated to cover the cost of both materials and labor to furnish and install the specified material(s) or perform the specified work and any applicable sales tax only. Overhead and profit are not included in the line item, however it is calculated within the stipulated fee. Owner understands and agrees that should the actual costs exceed the amount specified in the GMP for the Allowance, that amount will be adjusted by a timely change order. In the event the costs are lower than the allowance, an adjustment by change order will be made at the final billing for the project The ASSUMPTIONS AND CLARIFICATIONS section of this GMP Proposal may provide a more detailed description of these Allowances. DESCRIPTION OF ALLOWANCE ALLOWANCE AMOUNT Materials Testing Allowance $10,000.00 Maintenance of Traffic Allowance $15,000.00 Surveying Allowance $10,000.00 Dewatering Allowance $15„000.00 Landscaping Allowance $45,000.00 Asphalt and Concrete Repair Allowance $12,500.00 Disposal of Unforeseen Hazardous Materials Allowance $5,000.00 Page 5 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal EXHIBIT C — Assumptions and Clarifications The Contract Documents are amended by Biltmore Construction Co., Inc. as follows: 1. The following are not included in the GMP Proposal: A. Hazardous Materials Survey is excluded. B. Removal of Unsuitable Soils is excluded. Test Borings and Report of Geotechnical Investigation provided by Driggers Engineering Services, Inc. C. Impact Fees/Inspection Fees, Plan Review Fees and Permit Fees are excluded. Waived by City of Clearwater D. Threshold Inspections are excluded. E. Proposal Bond is excluded. F. Builder's Risk Insurance is excluded. To be provided by City of Clearwater. G. Permanent Power and Water Consumption Costs are excluded. H. Repairs to existing underground sanitary sewer piping, gas piping, fiber optic lines, storm piping, reclaimed water piping, wells, tanks and domestic potable water piping are excluded unless caused by included work. I. Removal of asphalt paving and curbing of the north side and west side parking lots is excluded. J. Shut-off of utilities is to be arranged with the various service providers by the City of Clearwater. K. Inventory of existing items to be removed and salvaged is excluded. Biller Reinhart Specification Section 024116, Paragraph 1.5, "Informational Submittals", Item D, "Inventory" is excluded. L. No Salvaged Items have been identified. Salvaging of existing materials and/or equipment is excluded. Biller Reinhart Specification Section 024116, Paragraph 3.3 "Preparation", Item E, "Salvaged Items" and Paragraph 3.6, "Demolition by Mechanical Means", Item C "Salvage" are excluded. M. Maintenance of Traffic (M.O.T.) plan is to be provided by the City of Clearwater. An Allowance of $15,000.00 is included Implementation of the plan to be performed by the Construction Manager. N. City of Clearwater to provide locations of underground utilities. 2. Warranties and Guarantees: A. Biltmore Construction Co., Inc. Warranties and Guarantees Biltmore Construction Co., Inc. warrants to the Owner that the materials and workmanship furnished under this Contract will be of good quality and new unless otherwise required or permitted by the Construction/Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform with the requirements of the Construction/Contract Documents. Work not conforming to these requirements may be considered defective. Biltmore Construction Co., Inc.'s warranty excludes remedy for damage or defect caused by insufficient maintenance, improper operation, or normal wear and tear under normal usage. The term and duration of this express warranty is Page 6 BILT ORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal one (1) year from the Date of Substantial Completion. The provisions herein shall not prevent the Owner from proceeding directly against the manufacturer and/or installer for such longer period of time as allowed by State Statute. B. Installer / Subcontractor Warranties and Guarantees The Subcontractor shall warrant to the Owner and to Biltmore Construction Co., Inc. that all workmanship and materials are free from defects in installation. The period customarily being one (1) year from the Date of Substantial Completion established in the Construction/Contract Documents. Notwithstanding anything to the contrary, neither Biltmore Construction Co., Inc., nor its Surety, nor the Subcontractor shall have any joint/several liability relating to, nor shall they be obligated to underwrite, or in any way become guarantor(s) of any manufacturer's warranty/guaranty or product to the Owner. The Owner shall be provided with the "standard" manufacturer's warranty, and it shall satisfy the requirements under the Construction/Contract Documents relating thereto. C. Manufacturer's Express Warranties / Guarantees Biltmore Construction Co., Inc. shall collect and transmit to the Owner any and all standard manufacturer's warranties and standard manufacturer's guarantees specified in the Construction/Contract Documents. The obligation and liability of Biltmore Construction Co., Inc. and/or its Surety is limited to the collection and proper transmittal of these warranties and guarantees to the Owner. Biltmore Construction Co., Inc. shall defer to and provide the manufacturer's requirements for standard and extended warranties, in all cases of conflict between manufacturer's warranties and those specified in the Construction/Contract Documents. 3. Special conditions relating to Owner purchased / Contractor installed items and associated tax exemptions: Notwithstanding any provision to the contrary, should the Owner elect to purchase items directly and avoid any sales taxes or other taxes, the Owner will defend, indemnify, and hold harmless Biltmore Construction Co., Inc. absolutely from and against any claim, audit, investigation, cost, or assertion of any kind made by, or on behalf of, the Florida Department of Revenue or other such agency that may arise during and / or subsequent to the completion of the project. Under no circumstances shall Biltmore Construction Co., Inc. or its subcontractors be liable for the sales taxes associated with the Owner purchased items. The Owner will provide Biltmore and the vendor with an executed Certificate of Entitlement (COE). By rule, the COE must be attached to each Owner Direct Purchase Order (ODPO) and should also be attached to any / each change order issued to the ODPO (if applicable). The public Owner must issue a separate COE for EACH such purchase order/change order. 4. Builder's Risk Insurance: Page 7 BIL 1 _I'1V11E CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal City of Clearwater shall purchase and maintain, until the date of Substantial Completion of this project, a standard Special Form (all "Risks of Physical Loss") Completed Value Builder's Risk insurance policy in the amount of the initial contract sum (GMP), including any subsequent modifications thereto, insuring the interests of the Owner, Biltmore Construction Co., Inc., and Subcontractors in the Work under this contract. All premiums and deductible costs related to this property insurance shall be paid by the City of Clearwater. The following items are the responsibility of the City of Clearwater and are not included in this GMP: a. Property insurance premiums and/or deductible costs. b. Property insurance coverage on existing buildings and/or contents. c. Property insurance coverage on the Work under this Contract after the date of Substantial Completion. d. Flood insurance coverage and/or risk of loss due to flood e. Wind Storm insurance and/or risk of loss due to named Wind Storm including all deductibles. 5. Basis of this GMP Proposal is the Documents and Specifications as issued by Biller Reinhart Structural Group, Inc. identified in Exhibit A, "Enumeration of Documents". 6. Time and Price — Impacted Labor, Materials & Equipment (Escalation/Availability of Labor/Materials): As of the date of this Contract Agreement and/or during the performance of the Work, certain markets providing labor, materials and equipment necessary to complete the Project may experience significant industry -wide fluctuation in cost, delivery, and availability. As a result, should there be any fluctuations that materially affect the cost, schedule, delivery, and/or availability of such items, regardless if same should occur before the acceptance of the GMP Proposal, or subsequent to the acceptance, the Owner agrees to make an equitable adjustment in the Contract Time and/or, if necessary, allow the CM to access contingency funds to cover the additional cost at The City's discretion. Notwithstanding any other provision to the contrary, the Contractor shall not be liable to the Owner for any expenses, losses or damages arising from a delay in delivery of a potentially time and price impacted material/equipment item not the fault of the Construction Manager. 7. Subcontractor Payments: Notwithstanding anything to the contrary, the City of Clearwater specifically acknowledges and agrees that the Construction Manager (Contractor) operates on a pay -when -paid basis with its subcontractors, and nothing contained herein or elsewhere shall be interpreted to require the Construction Manager and/or its Surety to remit any payment (including final payment) to subcontractors prior to the receipt of payment (including final) from the Owner. Page 8 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal 8. GMP Schedule of Values: It is acknowledged and agreed that, notwithstanding anything else to the contrary, the breakdown associated with the Guaranteed Maximum Price and/or the resulting Schedule of Values shall in no way as a line item guaranteed maximum price. 9. A Project Contingency of $120,000.00 is included. Acceptable uses of this Contingency include, but are not limited to: A. Buy -Out of the work not previously awarded in bid packages. B. Repair of damages caused by an unknown source or contractor (excluding Builder's Risk claims.) C. To improve and/or accelerate the progress of the work. D. To improve the conditions of the work. E. For modifications of the work resulting from an unknown ambiguity (Not an error or omission) in the contract documents. F. To increase and/or supplement staff as necessary to effectively manage the project. G. To adjust the reimbursable General Conditions/Requirements in excess of the line item value 10. No retainage will be held on Bonds, insurances, General Conditions, General Requirements, Staffing, and Construction Manager Fee 11. Electronic BIM or CAD "As-Builts" are not included. Final As -Built Survey of existing pilings will be provided. 12. We have included costs in the General Conditions Line Item for Document Management and Project Management Control Services. These services will be provided via cloud -based platform that will allow direct access by all construction personnel, including Owners, Architects and Subcontractors. Services will include the ability to access/manage the information via mobile device via the internet. Services included will be Plans and Specifications maintenance and distribution, RFI Control, Submittal Control, Punch List Management, Daily Reports along with other related functions inherent in the platform. The charge for this service shall be $1,696.00 and will be billed as a lump sum amount upon approval of GMP and issuance of Notice to Proceed. 13. We have included costs in the General Conditions Line Item for MIS Services related to the project. This includes software updates associated with Biltmore Construction's standard software provided for cost management, computer operating systems, PDF software, word processing applications and spreadsheet applications. This also includes troubleshooting, virus management/remediation, malware/adware management/remediation, updates and maintenance of these systems. The charge for this service shall be $1,350.00 and shall be billed as a lump sum amount upon approval of the GMP and issuance of the Notice to Proceed. 14. No Owner Direct Purchases are anticipated. However, should the City of Clearwater elect to utilize the Direct Purchase process to save sales tax, the tax for the actual purchases will be credited to the City. At the end of the Project, any refund for material not purchased or surplus materials returned to the suppliers plus the applicable sales tax amount shall be credited with Page 9 BILTVIORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal an additive Change Order to the Agreement with the Construction Manager and Subcontractor's Agreement. Surplus materials shall be the property of the Subcontractor and no refund or materials shall be due to the City. 15. Technical Clarifications: A. General Requirements 1. An Allowance of $10,000.00 is included for Survey Work required and deemed necessary by the Construction Manager to document existing conditions upon completion of the building demolition. 2. An Allowance of $10,000.00 is included for Materials Testing to include, but is not necessarily limited to, soil densities and grout/concrete compressive strength testing. 3. An Allowance of $15,000.00 is included for implementation of Maintenance of Traffic (M.O.T.) 4. Asbestos Abatement is included in accordance with Demolition Asbestos Survey dated September 7, 2018 as prepared by IBC Engineering -Environmental & Construction, LLC. 5. An Allowance of $15,000.00 is included for Dewatering. 6. An Allowance of $45,000.00 is included for Landscaping. 7. An Allowance of $12,500.00 is included for Asphalt and Concrete Repair. 8. An Allowance of $5,000.00 is included for disposal of Unforeseen Hazardous Materials left in the building. 9. The issuance of the Construction Manager's Performance and Payment Bonds will be provided after the approval of the GMP and issuance of the Notice to Proceed by The City of Clearwater. 10. Section I, "Advertisement of Bids & Notice to Contractors" of the City of Clearwater Contract Documents & Specifications is included. Biltmore Construction Co., Inc. complied with advertising requirement. 11. Section II, "Instruction to Bidders" and "Supplemental Instructions to Bidders" of the City of Clearwater Contract Documents & Specification are excluded. Subcontractor bid requirements are outlined in Exhibit B of the Construction Manager @ Risk Services for Continuing Contracts. 12. Section III, "General Conditions" and Section Ilia "Supplemental General Conditions" of the City of Clearwater Contract Documents are included as they pertain to and are consistent with the Construction Manager @ Risk Services for Continuing Contracts. 13. Section IV, "Technical Specifications" and Section IVa, "Supplemental Technical Specifications" of the City of Clearwater Contract Documents & Specifications are included only as they pertain to the Harborview Center Demolition Documents (Drawings and Technical Specifications) as listed in the Enumeration of Documents. If conflicting, the Construction Documents (Drawings and Technical Specifications) will be followed. 14. Appendix, "ODP Documents and Other Project Documentation" of the City of Clearwater Contract Documents & Specifications was not issued and thus is excluded. 15. Section V, "Contract Documents" of the City of Clearwater Contract Documents & Specifications is excluded. The Construction Manager @ Risk Services for Continuing Contracts will be followed. 16. No stored material is anticipated. However, the City will pay for on-site and off-site stored materials with proper documentation by CM. Page 10 BIL _ O lE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal 17. No vendor prepayment is anticipated. However, in the case where a vendor requires advance payment for materials/equipment, The City will allow the CM to bill in advance and make advance payment to the CM for those materials/equipment. 18. No Performance Specifications are included. 19. Delegated Design submittals are excluded. 20. No salvaged items to be turned over to the City are identified. Any salvaged materials/equipment will be the property of the Construction Manager. 21. Existing asphalt and concrete damaged as a result of new construction will be repaired. An Allowance of $12,500.00 is included. 22. Existing irrigation to remain if damaged as a result of new construction will be repaired. A Landscaping Allowance of $45,000.00 is included for any such repairs and for installation of a temporary irrigation system of the new sod. 23. Pressure washing of existing sidewalk is excluded. 24. Typical Project Sign based on the City of Clearwater Contract Documents and Specifications Article 23.8 is included. City to provide text as required. 25. Temporary chain Zink perimeter fence is included. 26. No final back -filling or grading plan has been provided. Per direction of the City, we have included an estimated quantity of non-structural fill, compacted in 1 foot lifts. 27. General Structural Notes for Structural Steel are not applicable. Page 11 BILI OI E CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal GUARANTEED MAXIMUM PRICE BREAKDOWN Itemized Description of the Trade Work Base GMP Amount Asbestos Abatement $ 84,500.00 Site Work/Earthwork/Tie-Backs & Building Demolition $ 1,099,000.00 $ 0.00 $ 0.00 $ 0.00 Plumbing and Fire Protection for Demolition $ 10,000.00 Electrical for Demolition $ 10,000.00 Subcontractor Direct Cost (SDC) SUBTOTAL $ 1,203,500.00 Liability Insurance (1.10%) $ $19,000.00 Performance and Payment Bond (1%) $ $20,900.00 Builder's Risk Insurance By Owner Material Testing Allowance $ 10,000.00 Surveying Allowance $ 10,000.00 Dewatering Allowance $ 15,000.00 Landscaping Allowance $ 45,000.00 Maintenance of Traffic (M.O.T.) Allowance $ 15,000.00 Asphalt and Concrete Repair Allowance $ 12,500.00 Disposal of Unforeseen Hazardous Materials Allowance $ 5,000.00 Staffing $ 219,824.00 General Conditions $ 61,726.00 Project Contingency $ 120,000.00 SUBTOTAL $ 678,397.00 Preconstruction Phase Fee $ 16,000.00 CM Fee (6% of $1,757,450.00) $ 105,447.00 Total Guaranteed Maximum Price (GMP) $ 1,878,897.00'`" Page 12 BILTMORE CONSTRUCTION CO., INC. City of Clearwater Harborview Center Demolition Guaranteed Maximum Price (GMP) Proposal EXHIBIT E — Construction Schedule Subject to the ASSUMPTIONS AND CLARIFICATIONS contained herein, the anticipated construction period shall be Two Hundred Ten (210) calendar days to achieve Substantial Completion, after receipt, by Biltmore Construction Co., Inc., of all of the following requirements: • Execution of the Guaranteed Maximum Price Amendment of the Agreement Between Owner and Biltmore Construction Co., Inc. • Receipt of the Written Notice to Proceed. • Receipt of all required Permits. • Recorded Notice of Commencement (as applicable). • Construction site available to commence construction activity. Final Completion shall be within Thirty (30) calendar days following the Date of Substantial Completion of the Work. A preliminary Design Phase and Construction Phase Schedule is included herein. Once the subcontractors are selected we will prepare a more detailed CPM Schedule that will include all design, permitting, procurement and construction activities. Mobilization and commencement of on-site construction activities shall be contingent upon anticipated durations of long -lead items that could impact the construction schedule. These items include, but are not necessarily limited to pre-engineered structural stud trusses, preformed metal standing seam roof, HVAC equipment, light fixtures and generator. Once the availability and lead times of the aforementioned items are confirmed, a more detailed CPM Project Schedule will be provided in accordance with the requirements of the Construction Manager at Risk Services for Continuing Contracts. Page 13 v BILTMORE CONSTRUCTION Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFQ #24-16 the Harborview Center Demolition GMP dated November 16, 2018 Pages 1-14 including the Enumeration of Documents (1 pages) and the Preliminary Construction Schedule (1 pages). If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. City Code: Biltmore Construct By: Vito DiRuggeri Vice President CITY OF CLEARWATER, FLORIDA Apprd as to for, Owen Kohler Assistant City Attorney Countersigned: nn G( Ltr,Crc111�.�0) George N. Cretekos Mayor Date 410, Date Attest: By: Q1L Rosemarie Call City Clerk ga; illiam B. Horne II City Manager i.2-/ !'1« Date 1055 Ponce de Leon Boulevard • Belleair, Florida 33756 • Ph: 727.585.2084 • Fax: 727.585.2088 BILTMORE CONSTRUCTION Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFQ #24-16 the Harborview Center Demolition GMP dated November 16, 2018 Pages 1-14 including the Enumeration of Documents (1 pages) and the Preliminary Construction Schedule (1 pages). If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. City Code: Biltmore Construct(on Co., Inc. By: Vito D uggerio Vice President Date CITY OF CLEARWATER, FLORIDA Approves to fort: Attest: 6✓i Owen Kohler Assistant City Attorney Countersigned: \1on,,W George N. Cretekos By;/` Ad.F' Rosemarie Call City Clerk iaZZGI o44v fol'. lliam B. Horne II Mayor City Manager /-)/it It 8 ) Date Date 1055 Ponce de Leon Boulevard • Belleair, Florida 33756 • Ph: 727.585.2084 • Fax: 727.585.2088