Loading...
SUNTREE REPAIR RESTORE STORM - 18-0008-EN �r CERTIFICATE F SUBSTANTIAL COMPLETION Project: SuntEgt f a it est re Star° Contract Number: a Location: Beach Walk Baffle Boxes Contract ate;. 6/30/1 rattier:to Proceed Dater 6/30/17 1 . Substantial Completion Date. 11/.1/i ._,,_,_ aurranty Expiration ata.: 11/1/19 The work performed under this Contract has been inspected by authorized representatives of the Owner and Contractor, and the Project, as indicated above, is hereby declared to be substantially completed on the above date, DEFINITION BA TICAL COMPLETION Substantial completion is the stage in construction when a project or designated portion thereof is .sufficiently complete in accordance with contract documents so that the Owner can use the work or portion thereof or its intended use. Items that affect operational integri�t andfunction of the work must he capable of continuous use. The Contractor accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on any tentative list within the time indicated, if a I is able. Jeff Tru t n fay art Keystone Excavators,Contractorc izetl Representative Date The Owner accepts the specified area of the Project as Substantially Complete and will assume full possession of the specified area of the Project on Novigniber 1, 2018, The responsibility for utilities, security, and ins turance,under the Contract Documents shall be:as set forth in the Contract Documents. r Brad Hamilton By, City of Clearwater ,authorized Representative late PROJECT ONE YEAR WARRANTY Contract Section N, 13.5 WARRANTYMORRECTIONPERIOD If within one year after the date of Substantival Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, Contractor shall promptly, without cast to the Owner and in accordance with.the Owner's written. instructions; (i) correct such defective Work, or, if it has been rejected by the Owner, remove it from the site arta replace it with Work that is not defective and(ii)satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom... Where defective Work(and damage to other Work resulting therefrom)has been corrected, removed or replaced under this paragraph the correction period hereunder with respect to such Work will be extendedfor on addifienw!perit)d ofolle vem.41fiersnril coro,01401 M 1,0111wal alld hely hrrrt VoIlkl0cwriA, completed. Subshint!21 Completion Date: 11/1/18 Warranty Expiration Date-. II/V19 ........... A copy of this signed and executed document should be provided to the following parties-. Project Owner Project Contraclor City Construction Office Specialist Project File