SUNTREE REPAIR RESTORE STORM - 18-0008-EN �r
CERTIFICATE F SUBSTANTIAL COMPLETION
Project: SuntEgt f a it est re Star° Contract Number: a
Location: Beach Walk Baffle Boxes
Contract ate;. 6/30/1 rattier:to Proceed Dater 6/30/17
1 .
Substantial Completion Date. 11/.1/i ._,,_,_ aurranty Expiration ata.: 11/1/19
The work performed under this Contract has been inspected by authorized representatives of the Owner
and Contractor, and the Project, as indicated above, is hereby declared to be substantially completed on
the above date,
DEFINITION BA TICAL COMPLETION
Substantial completion is the stage in construction when a project or designated portion thereof is
.sufficiently complete in accordance with contract documents so that the Owner can use the work or
portion thereof or its intended use. Items that affect operational integri�t andfunction of the work must
he capable of continuous use.
The Contractor accepts the above Certificate of Substantial Completion and agrees to complete and correct
the items on any tentative list within the time indicated, if a I is able.
Jeff Tru t n fay
art
Keystone Excavators,Contractorc izetl Representative Date
The Owner accepts the specified area of the Project as Substantially Complete and will assume full
possession of the specified area of the Project on Novigniber 1, 2018, The responsibility for utilities,
security, and ins turance,under the Contract Documents shall be:as set forth in the Contract Documents.
r
Brad Hamilton By,
City of Clearwater ,authorized Representative late
PROJECT ONE YEAR WARRANTY
Contract Section N,
13.5 WARRANTYMORRECTIONPERIOD
If within one year after the date of Substantival Completion or such longer period of time as may be prescribed
by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract
Documents or by any specific provision of the Contract Documents, any Work is found to be defective,
Contractor shall promptly, without cast to the Owner and in accordance with.the Owner's written.
instructions; (i) correct such defective Work, or, if it has been rejected by the Owner, remove it from the site
arta replace it with Work that is not defective and(ii)satisfactorily correct or remove and replace any damage
to other Work or the work of others resulting therefrom...
Where defective Work(and damage to other Work resulting therefrom)has been corrected, removed or
replaced under this paragraph the correction period hereunder with respect to such Work will be extendedfor
on addifienw!perit)d ofolle vem.41fiersnril coro,01401 M 1,0111wal alld hely hrrrt VoIlkl0cwriA,
completed.
Subshint!21 Completion Date: 11/1/18 Warranty Expiration Date-. II/V19
...........
A copy of this signed and executed document should be provided to the following parties-.
Project Owner
Project Contraclor
City Construction Office Specialist
Project File