Loading...
EAST GATEWAY STORMWATER AND SANITARY IMPROVEMENTS PROJECT - 13-0043-EN - CORRESPONDENCE GRANTING ADDITIONAL DAY From: Dimitrov, Ivan <ivan.dimitrov@MyClearwater.com> Sent:Wednesday, October 17, 2018 2:18 PM To: Brian Symanski <bsymanski@nelson-construction.com> Cc: Ross, Richard <Richard.Ross@myClearwater.com>; Kurtz,Timothy M. <Timothy.Kurtz@ myClearwater.com>; Davis, Laura <Laura.Davis@MyClearwater.com>;John Lewis <jlewis@nelson-construction.com>; Kivett,Tara <Tara.Kivett@MyClearwater.com> Subject: Re: East Gateway-Conflict between existing Verizon and proposed Water Main on Avanda Ct. Brian, I am only approving one day. Ivan Get Outlook for iOS From: Brian Symanski <bsymanski@nelson-construction.com> Sent: Friday, October 12, 2018 14:02 Subject: RE: East Gateway-Conflict between existing Verizon and proposed Water Main on Avanda Ct. To: Dimitrov, Ivan <ivan.dimitrov@myclearwater.com> Cc: Ross, Richard <richard.ross@myclearwater.com>, Kurtz,Timothy M. <timothy.kurtz@myclearwater.com>, Davis, Laura <laura.davis@myclearwater.com>,John Lewis <jlewis@nelson-construction.com> Ivan, To close out the correspondence below,we received the additional fittings requited to offset the water main out of conflict on September 13th and completed the installation of them that same day,thus ending the delay. Per the contract, please allow this email to serve as our notice of extent of the claim (originally detailed in the email below) and our request that the contract time be adjusted by three (3) additional days to account for both the delay and the additional work required to mitigate the delay.Thank you. Brian Symanski Estimator/Project Manager David Nelson Construction Co. 3483 Alt 19 Palm Harbor, FL 34683 727-784-7624 727-639-5367 Cell bsymanskiCa)nelson-construction.com From: Brian Symanski Sent:Wednesday, September 12, 2018 3:33 PM To: Dimitrov, Ivan <ivan.dimitrov@MyClearwater.com> Cc: Ross, Richard <Richard.Ross@r yClearwater.com>; Kurtz,Timothy M. <Timothy.Kurtz@r yClearwater.com>; Davis, Laura <Laura.Davis@MyClearwater.com>;John Lewis <jlewis@nelson-construction.com> Subject: RE: East Gateway-Conflict between existing Verizon and proposed Water Main on Avanda Ct. Ivan, Thanks for the direction. We have ordered the additional fittings and restraints so as soon as they are received we will pick up where we had to stop with the installation of the main. Brian Symanski Estimator/Project Manager David Nelson Construction Co. 3483 Alt 19 Palm Harbor, FL 34683 727-784-7624 727-639-5367 Cell bsymanskiCa)nelson-construction.com From: Dimitrov, Ivan <ivan.dimitrov@MyClearwater.com> Sent:Wednesday, September 12, 2018 12:52 PM To: Brian Symanski <bsvmanski@nelson-construction.com> Cc: Ross, Richard <Richard.Ross@r yClearwater.com>; Kurtz,Timothy M. <Timothy.Kurtz@ myClearwater.com>; Davis, Laura <Laura.Davis@M learwater.com>;John Lewis <jlewis@nelson-construction.com> Subject: Re: East Gateway-Conflict between existing Verizon and proposed Water Main on Avanda Ct. Brian, I discussed the conflict with the engineer, and you could use a 45 to offset the water main to the east. Since the sanitary is much deeper than the water, the minimum horizontal distance can be 3' between the outsides of the two pipes. Regards, Ivan Get Outlook for iOS From: Brian Symanski <bsvmanski@nelson-construction.com> Sent:Tuesday, September 11, 2018 4:54:44 PM To: Dimitrov, Ivan Cc: Ross, Richard; Kurtz,Timothy M.; Davis, Laura;John Lewis Subject: East Gateway-Conflict between existing Verizon and proposed Water Main on Avanda Ct. Ivan, While excavating to install the new 6"water main running to the south end of Avanda Ct.,we encountered a Verizon fiber optic line running parallel to the water main in direct conflict with it. The plans show the Verizon cable/conduit running parallel to the new water main but anywhere from 4'-8' to the west of it(see attached Plan Sheet 44), which would be plenty of room to install the main. However,just to the south of the new storm sewer main between 2093 & 2072 we encountered the Verizon line in conflict(line &grade)with the proposed water main. We brought this issue to the attention of the on-site Verizon rep, Chris Blauvelt,who told us that Verizon isn't required to move the line for the new water main at their cost. As of this point, until Verizon relocates their line or we are directed by the City to re-route the water main,we cannot proceed with the installation of the main. Per the contract documents, please allow this email to serve as our notification of an event with the potential to give rise to a claim for an adjustment to the Contract Time and/or the Contract Price. Until we have a solution to this conflict, we are unable to complete the water main, demo the old and complete the subsequent roadway reconstruction in this location. As of now,we do not know the extent of the impacts to the project, therefore,we are reserving our rights to recover all additional contract time and/or any potential costs related to this issue . As always,we will do anything we can to mitigate any delays or extra costs associated with this conflict. Brian Symanski Estimator/Project Manager David Nelson Construction Co. 3483 Alt 19 Palm Harbor, FL 34683 727-784-7624 727-639-5367 Cell bsymanskiCa)nelson-construction.com