CORONA AVENUE SANITARY SEWER IMPROVEMENTS - 15-0034-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: July 13, 2018
PROJECT
Corona Avenue Sanitary
Sewer Improvements
CONTRACTOR:
Steve's Excavating & Paving, Inc.
PO Box 303
Dunedin, F134697
PROJECT NUMBER:
CONTRACT REFERENCE
COUNCIL AWARD:
DATE OF CONTRACT:
CODE:
15 -0034 -UT
900295
September 7, 2017
October 5, 2017
3217321-563800-96212
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
decreasing, increasing, and adding items in accordance with field conditions - See details attached
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Admin Change Order 1&Final - City Manager
NEW CONTRACT AMOUNT
etzt
Rosemarie Call
Date: Ci -a; Jpl
5555,170.00
(563,528.50)
$491,641.50
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
I: ip:..,.
William B. Horne, II
APPROVED AS TO FORM:
0(0{ 4'064
City Manager
Owen Kohler,
Assistant City Attorney
ACCEPTED BY:
Steve' Excavating & Pavin
By.
Steve Sarnago,
Date: 7A (
Witnesses: (two)
.SFr•, ,
1 t• 0
ice Prgidet
Recommended By /City of Clearwater
Todd Kuhnel,
Project Manager
D. Scott Rice, PE, City Engineer
4
i
•
Page 2 of 2
Administrative Change Order 1 & Final - Corona Avenue Sanitary Sewer Improvements
ITEM DESCRIPTION UNIT (t UNIT COST TOTAL COST
Decreases:
9 Sod Restoration as Directed by the SY 5 $ 8.00 $ (40.00)
Owner or the Owner's Authorized
Project Representative
10 Concrete Driveway Restoration as SY 47 $ 58.00 $ (2,726.00)
Directed by the Owner or the Owner's
Authorized Project Representative
11 Concrete Sidewalk Restoration as SY 50 $ 53.00 $ (2,650.00)
Directed by the Owner or the Owner's
Authorized Project Representative
13 Underdrain Restoration as Directed by LF 50 $ 57.00 $ (2,850.00)
the Owner or the Owner's Authorized
Project Representative
14 Asphalt Paving Restoration as Directed SY 100 $ 13.00 $ (1,300.00)
by the Owner or the Owner's
Authorized Project Representative
15 Unsuitable Material Excavation Below CY 60 $ 18.00 $ (1,080.00)
Grade as Directed by the Owner or the
Owner's Authorized Project
Representative
16 Select Backfill Below Grade as CY 100 $ 18.50 $ (1,850.00)
Directed by the Owner or the Owner's
Authorized Project Representative
17 Asphalt Overlay as Directed by the SY 100 $ 13.00 $ (1,300.00)
Owner or the Owner's Authorized
Project Representative
18 Owner's Contingency (10%) LS 1 $ 50,470.00 $ (50,470.00)
Total (Decreases): $ (64,266.00)
Increases:
12 Concrete Curb Restoration as Directed by LF 10.00 $ 18.75 $ 187.50
the Owner or the Owner's Authorized
Project Representative
Total Increases: $ 187.50
Additions:
19 Raise Existing Sanitary Manhole LS 1 $ 550.00 $
550.00
Total Additions: $ 550.00
Total Net (Decreases)/Increases/Additions to the Contract: $
(63,528.50)