Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DRUID TRAIL WALKWAY - PHASE 4 - 04-0021-PR - ADMINISTRATIVE CHANGE ORDER #1
Admini bra ie Change Order 1 PROJECT: Druid Trail Phase 4 CONTRACTOR: Keystone Excavators, Inc 371 Scarlet Blvd Oldsmar, FI 34677 Date: PROJECT NUMBER: CONTRACT: COUNCIL AWARD: DATE OF CONTRACT: CODE: July 17, 2018 04 -0021 -PR 900307 December 7, 2017 December 13, 2017 ENRD 180001-CONS-CNSTRC SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - City Manager NEW CONTRACT AMOUNT $3,126,188.51 $ (0.00) Byi�, $3,126,188.51 Robert C Fornwalt, ACCEPTED BY: Keystone Excavatpr5,'i ' ' `. /';‘)\-\(:), '.. . ... ,14 It 40\ 1?Otssi4utcr, ..i Rosemarie Call, Date: CITY OF C:_.EARWATER, in PINELLAS COUNTY, FLORIDA Date: Witnesses: (two) hiLe-Zs-P.,.ce4 ecommended By: City of Clearwater William B. Horne, II APPROVED AS TO FORM: 0, „of:. Owen Kohler, +ssistant City Attorney City Manager Paul Bertels, c=i) Project Manager rz4 C(? D. Scott Rice, PE, City Engineer • IL Page 2 of 3 Administrative Change Order 1: Druid Trail Phase 4 ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Decreases: 9 160-4 Stabilization (Type B) (6" Trail) SY 8,159.7 $ 6.10 $ (49,774.17) 10 Crushed Concrete Base, 6" SY 6,528.00 $ 16.00 $ (104,448.00) 13 (1") TN 342.85 $ 133.00 $ (45,599.05) 15 425-1-331 Inlet, (Curb) (Type, P-3) (<10') EA 1.00 $ 4,225.00 $ (4,225.00) 31 Header Curb LF 13,215.5 $ 17.25 $ (227,967.38) 39 630-2-11 Conduit, Furnish & Install, Open LF 171.0 $ 6.50 $ (1,1 11.50) Trench 65 1644-112-08 Fire Hydrant, F&I, STD, 2 Hose, EA 2.0 $ 8,300.00 $ (16,600.00) Total (Decreases): $ (449,725.10) Increases: 25 425-11 Drainage Structure - Modify Existing EA 4.0 $ 3,255.00 $ 32 Straight Curb LF 300.0 $ 18.75 $ 33 522.1 Concrete Sidewalk (4") SY 5,709.2 $ 42.00 $ 34 522-2 Concrete Sidewalk and Driveways, 6" SY 2,300 $ 58.00 $ Thick 41 635-2-11 Pull and Splice Box, F&I, 13" x 24" EA 4 $ 795.00 $ Cover Size 63 1080 i4 Utility Fixtures, Relo.,ate, Water Meter EA 40 $ 275.00 $ 66 1644-400 Fire Hydrant, Relocate EA 7 $ 5,265.00 $ Total Increases: $ Additions: 96 630-2-12 Conduit, Furnish & Install, Directional LF Bore 97 1050-51-208 8" Ductile Iron Pipe, Sewer LF Replacement 171 $ 24.00 $ 27 $ 102.00 $ 13,020.00 5,625.00 239,787.09 133,400.00 3,180.00 11,000.00 36,855.00 442,867.09 4,104.00 2,754.00 Total Additions: $ 6,858.00 Total Net (Decreases)/Increases/Additions: $ (0.00)