GREENLEA-OTTEN NEIGHBORHOOD TRAFFIC CALMING & OTTEN ST ROADWAY & STORMWATER IMPROVEMENT PROJECT - 10-0003-EN - ADMINISTRATIVE CHANGE ORDER #4 & FINAL
Administrative Change Order 4&Final Date: June 1, 2018 PROJECT: Greenlea-Otten Neighborhood Traffic Calming & Otten Roadway & Stormwater Improvements CONTRACTOR: David Nelson Construction Co. 3483 Alt 19 Palm Harbor, FI 34683 PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: 10 -0003 -EN ST112763 April 7, 2016 April 20, 2016 ENRD 180003-CONS-CNSTRC SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council - 10/5/2016 Admin Change Order 2 - City Manager - 3/21/2017 Admin Change Order 3 - City Manager - 8/30/2017 Administrative Change Order 4 - City Manager NEW CONTRACT AMOUNT it. 1Ia11 ACCEPTED BY: 'a.. David Ne ftt onsiyctio Geo. a ft. $ 3,071,486.83 $685,440.00 By: `►` $22,602.40 David Vekasi $ (71,035.30) $ (61,846.38) Date: 1 — $ 3,646,647.55 Witnesses: (two) Rosemarie Call, Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Wiliam B. Horne, II APPROVED AS TO FORM: City Manager Owen Kohler, Assistant City Attorney Reconunended By: City of Clearwater itkAa4 Tara Kivett, Pro, eet-Man ag yes City Engineer D. Scott Rice, PE. Page 2 of 3 Administrative Change Order 4&Final:Greenlea Otten Neighborhood Traffic Calming&Otten Roadway&Stormwater Imp M DESCRIPTION UNIT Qty UNIT COST TOTAL COST Decreases: 4 Tree Barricade EA 4 $ 190.00 $ (760.00) 5 Root Pruning LF 259 $ 9.00 $ (2,331.00) 28 Asphalt Texture Print SF 5,918 $ 7.50 $ (44,385.00) 63 Thermoplastic overlay pattern" YBR" SF 2,067 $ 22.00 $ (45,474.00) 89 Contingency LS 1 $ 226,627.98 $ (226,627.98) Total (Decreases): $ (319,577.98) Increases: 7 Concrete driveway removal SF 1,836 $ 1.10 $ 2,019.60 9 Concrete gutter removal LF 20 $ 3.85 $ 77.00 10 Concrete sidewalk removal SF 1,416 $ 0.90 $ 1,274.40 11 Pavement removal SY 55 $ 3.50 $ 192.50 12 Relocate cleanout EA 2 $ 950.00 $ 1,900.00 16 Mill asphalt pavement, 1 -inch SY 288 $ 20.00 $ 5,760.00 24 8" crushed concrete base SY 562 $ 22.50 $ 12,645.00 26 1.5"-2" asphalt pavement (Type SP) TON 87.9 $ 129.00 $ 11,339.10 27 Asphalt Speed Table EA 4 $ 4,000.00 $ 16,000.00 30 Concrete driveway SF 3,016 $ 8.00 $ 24,128.00 31 Concrete sidewalk, 4" SF 1,177 $ 4.00 $ 4,708.00 33 Detectable Warning Domes EA 14 $ 350.00 $ 4,900.00 35 Straight curb LF 565 $ 16.00 $ 9,040.00 36 Concrete valley gutter LF 9 $ 33.00 $ 297.00 38 FDOT valley gutter LF 59 $ 33.00 $ 1,947.00 55 Pavement markings, 6" LF 160 $ 1.20 $ 192.00 57 Pavement markings, 12" LF 77 $ 2.50 $ 192.50 60 Pavement marking, 24" LF 54 $ 5.50 $ 297.00 71 Loop Assembly Type F AS 1 $ 3,000.00 $ 3,000.00 72 Sod SF 23,641 $ 0.75 $ 17,730.75 Total Increases: $ 117,639.85 Additions: 140 Concrete sidewalk, 4" SF 398 $ 5.00 $ 1,990.00 141 Remove & Replace Modified Curb for Milling LF 1,766 $ 30.00 $ 52,980.00 & Resurfacig 142 Replace 4 " Watermain Thames St (W) LS 1 $ 14,910.00 $ 14,910.00 143 Offset 6" Watermain at Linwood-Sharondale LS 1 $ 6,536.50 $ 6,536.50 144 Lower 6" Watermain at Ridgeway S Median LS 1 $ 12,854.69 $ 12,854.69 145 Replace Sanitary Sewer Laterals LS 1 $ 5,671.63 $ 5,671.63 147 Lower 6" Watermain at Greenlea W Median LS 1 $ 9,269.03 $ 9,269.03 Page 3 of 3 Administrative Change Order 4&Final: Greenlea Otten Neighborhood Traffic Calming&Otten Roadway&Stormwater Imi 11 DESCRIPTION UNIT(�yt UNIT COST TOTAL COST M 157 Premium Cost Pygmy Date Palm in lieu of LS 1 $ 209.89 $ 209.89 Cabbage Palm 158 Cost for change to irrigation Equiment Specs LS 1 $ 4,521.56 $ 4,521.56 159 Thermoplastic Speed Hump & Table Markings EA 32 $ 365.40 $ 11,692.80 160 Asphalt Stamp, Mill & Resurface Crosswalks LS 1 $ 11,455.65 $ 11,455.65 where no Thermo Material Applied 161 Lost OH&P Removing Crosswalk Thermoplastic LS 1 $ 8,000.00 $ 8,000.00 Overlay from project scope. Total Additions: $ 140,091.75 Total Net (Decreases)/Increases/Additions: $ (61,846.38)