2013-14 SANITARY SEWER AND MANHOLE REHABILITATION - 14-0025-UT - ADMINISTRATIVE CHANGE ORDER #3ADMINISTRATIVE CHANGE ORDER 3 PROJECT: 2013-14 Sanitary Sewer and Manhole Rehabilitation -Sanitary Sewer Emergency Repair CONTRACTOR: Rowland Incorporated 6855- 102nd Avenue North Pinellas Park, Fl 33782 DATE: PROJECT NUMBER: CONTRACT: COUNCIL AWARD: DATE OF CONTRACT: CODE: May 22, 2018 14 -0025 -UT 900250 February 5, 2015 February 27, 2015 3277327-563800-96665 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT to increase and add items for point repairs at various locations within the City - see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 1,000,000.00 Change Order 1- City Council -11/3/2016 $ 750,000.00 R&C Change Order 2 - City Council - 1/19/2017 $ 339,757.89 Admin Change Order 3 - City Mgr $ 175,000.00 NEW CONTRACT AMOUNT $ 2,264,757.89 APPROVED AS TO FORM: teAL Owen Kohler, - cteoftfuvr(\tIcoc George N Cretekos, Assistant City Attorney ACCEPTED BY: Rowland Incorporated h EATS) t ;' Ken Rowland, Date: 6/ i9 Witnesses: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA Jt .44: iv.G,,46 aha 4d y' 'C. r' fiaiam B. Horne, II City Manager Recommended By: City of Clearwater Lan-Anh Nguyen, PE, Project Manager 64t Cod D. Scott Rice, PE, City Engineer Page 2 of 3 Adminiistative Change Order 3 - 2013-14 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM Increases: C. SEWER PIPE, FORCE MAIN, AND MANHOLE EMERGENCY REPAIR 1 Mobilization LS 1 $ 225.00 $ 225.00 2 Traffic Control Per Day 5 $ 45.00 $ 225.00 3 Labor Hour Foreman - regular time PH 50 $ 66.00 $ 3,300.00 Foreman - overtime PH 40 $ 76.00 $ 3,040.00 Operator - regular time PH 50 $ 53.00 $ 2,650.00 Operator - overtime PH 40 $ 63.00 $ 2,520.00 Truck Driver - regular time PH 80 $ 43.00 $ 3,440.00 Truck Driver - overtime PH 30 $ 53.00 $ 1,590.00 Pipe Layer - reguar time PH 100 $ 46.00 $ 4,600.00 Pipe Layer - overtime PH 60 $ 56.00 $ 3,360.00 Laborer - regular time PH 150 $ 41.00 $ 6,150.00 Laborer - overtime P11 80 $ 51.00 $ 4,080.00 4 Equipment Foreman P/U with hand tools PH 250 $ 28.00 $ 7,000.00 Job truck with tools PH 150 $ 36.00 $ 5,400.00 Tractor & Trailer (Transport) PH 10 $ 25.00 $ 250.00 Track Hoe (to 100 HP) PH 70 $ 95.00 $ 6,650.00 Track Hoe (101 HP to 170 HP) PH 25 $ 130.00 $ 3,250.00 Track Hoe (170 HP and up) PH 50 $ 64.00 $ 3,200.00 Rubber Tire Backhoe PH 50 $ 55.00 $ 2,750.00 Wheel Loader (to 150 HP) PH 50 $ 65.00 $ 3,250.00 Wheel Loader (150 HP and up) PH 50 $ 70.00 $ 3,500.00 Track Type Tractors (to 100 HP) PH 40 $ 22.00 $ 880.00 Track Type Tractors (100 HP and up) PH 40 $ 27.00 $ 1,080.00 Dump Truck (Tandem Axle) PH 30 $ 72.00 $ 2,160.00 Plate Tamp PH 20 $ 6.00 $ 120.00 3" Trash Pump PH 30 $ 6.00 $ 180.00 4" Double Diaphragm Pump PH 40 $ 9.00 $ 360.00 Air Compressor (125CFM) PH 40 $ 12.00 $ 480.00 Well Point Pump Per Day 4 $ 100.00 $ 400.00 Well Point LF 80 $ 26.00 $ 2,080.00 4" jet pump Per Day 10 $ 100.00 $ 1,000.00 Emergency Hauling up to 2500 gallons PH 10 $ 180.00 $ 1,800.00 Emergency Hauling more than 2500 gall( PH 10 $ 180.00 $ 1,800.00 5 Materials Asphalt - 2" Overlay SY 100 $ 15.00 $ 1,500.00 3000 psi Concrete CY 39 $ 115.00 $ 4,485.00 Off Site Selected Fill CY 118 $ 4.00 $ 472.00 Limerock Base Material TN 50 $ 25.00 $ 1,250.00 #57 Washed Stone TN 50 $ 40.00 $ 2,000.00 Bahia Sod SF 3000 $ 0.60 $ 1,800.00 City's standard manhole ring EA 20 $ 150.00 $ 3,000.00 City's standard manhole cover EA 20 $ 80.00 $ 1,600.00 Two-way Cleanouts EA 50 $ 55.00 $ 2,750.00 5a Sewer Pipe Replacement per if PVC 8" Diameter LF 50 $ 2.75 $ 137.50 10" Diameter LF 50 $ 4.50 $ 225.00 12" Diameter LF 50 $ 6.35 $ 317.50 15" Diameter LF 50 $ 9.60 $ 480.00 DI 8" Diameter LF 50 $ 28.90 $ 1,445.00 10" Diameter LF 50 $ 37.90 $ 1,895.00 12" Diameter LF 50 $ 44.60 $ 2,230.00 DESCRIPTION UNIT QTY UNIT COST TOTAL COST Page 3 of 3 Adminiistative Change Order 3 - 2013-14 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST 15" Diameter LF 50 $ 0.01 $ 0.50 18" Diameter LF 50 $ 62.40 $ 3,120.00 20" Diameter LF 50 $ 69.25 $ 3,462.50 21" Diameter LF 50 $ 0.01 $ 0.50 24" Diameter LF 50 $ 90.65 $ 4,532.50 30" Diameter LF 50 $ 101.00 $ 5,050.00 36" Diameter LF 50 $ 125.00 $ 6,250.00 5B Force Main Replacement per linear foot PVC 8" Diameter LF 50 $ 6.10 $ 305.00 10" Diameter LF 50 $ 9.15 $ 457.50 12" Diameter LF 50 $ 15.70 $ 785.00 15" Diameter LF 50 $ 0.01 $ 0.50 18" Diameter LF 49 $ 31.00 $ 1,519.00 20" Diameter LF 50 $ 33.20 $ 1,660.00 21" Diameter LF 50 $ 0.01 $ 0.50 24" Diameter LF 50 $ 55.00 $ 2,750.00 30" Diameter LF 50 $ 86.50 $ 4,325.00 36" Diameter LF 50 $ 99.90 $ 4,995.00 DI 8" Diameter LF 45 $ 28.90 $ 1,300.50 10" Diameter LF 45 $ 37.90 $ 1,705.50 12" Diameter LF 45 $ 44.60 $ 2,007.00 15" Diameter LF 50 $ 0.01 $ 0.50 18" Diameter LF 50 $ 62.40 $ 3,120.00 20" Diameter LF 50 $ 69.25 $ 3,462.50 21" Diameter LF 100 $ 0.01 $ 1.00 24" Diameter LF 50 $ 90.65 $ 4,532.50 30" Diameter LF 50 $ 101.00 $ 5,050.00 36" Diameter LF 50 $ 125.00 $ 6,250.00 Total Increases: $ 175,000.00