JOE DIMAGGIO SPORTS COMPLEX - NW SOCCER FIELD RENOVATIONS - ADMINISTRATIVE CHANGE ORDER #1Page 1 of 2 Administrative Change Order #1 BRIGI11 .i\77 BCALTIFUI. • BAY TO BIACI I Date: May 11, 2018 PROJECT PROJECT NUMBER: Joe DiMaggio Sports Complex (Northwest Soccer Field Renovation). PO REFERENCE NO.: CONTRACTOR: Keystone Excavators, Inc. 371 Scarlet Blvd Oldsmar, FL 34677 DATE OF CONTRACT: 0 ST114385 August 24, 2017 CODE: 0315-93655-563600-575-000-0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order increases and adds items according to field conditions -see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 1,585,500.00 DPO & Tax Savings ($421,300.00) Adiusted Contract Amount $ 1,164,200.00 Administrative Change #1 less contingency and project adjustments $ 104,090.25 NEW CONTRACT AMOUNT APPROVED AS TO FORM: Owen Kohler Attest: /MW £4-t( Rosemarie Call Date: Sof --10 4? CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ACCEPTED BY: Keystone Excavators, Inc ii4'0422/4/. 1,268,290,25 Date: .7 "%y - 457 Assistant City Attorney William B. Horne, II Jerk City Manager Recommended By: City of Clearwater ,k72 Project Engineer Project Manager evin Dunbar Dunbar Parks & Recreation Director BRIGHT AND BEALmrui. • BAY TO BEACH Page 2 of 2 Administrative Change Order 1 : Joe DiMaggio Sports Complex (Northwest Soccer Field Renovation). ITEM DESCRIPTION Increase Continzencv (5% of contract) Line #1 Change Order Adjustment Credits Line #2 Additional Scope of Work UNIT Qtk UNIT COST TOTAL COST 1 $ 75,500.00 $ (75,500.00) 1 $ 215,968.00 $ (215,968.00) 1 $ (395,558.25) $ 395,558.25 Total (Increases): $ 104,090.25 Decrease for ODP's: 1 MUSCO Lighting - Ligh Poles LS -1 $421,300.00 Total (Decreases): ($421,300.00) ($421,300.00) $ 804.18 Joe DiMaggio Sports Complex. Northwest Soccer Field Renovation Keystone Excavators 371 Scarlet Blvd, Oldsmar, FL 34677 Final Reconciliation of Added Work Items, Add'I work Quantities , and Credits! Deducts Date : May, 2018 40 Electrical Revision, Add Above -Ground Junction Boxes. Approved by City 1012512017 35 B CELEBRATION ROLL SOD, ADD New Price for shorter, * 1" * Root mass. 14A Additional IMPORT FILL , SPREAD, COMPACT FILL and ROUGH GRADE Soccer Fields. REVISE WALL SECTIONS PER November 20th REVISED PLANS L5 $ 7,210.00 SF 234620 $ 0.50 Cu.Yd. 2,352 $ 19.40 $ 7,210.00 $ 117,310.00 $ 45,628.80 $ 170,148.80 19B ADD Revised Wall at North end of Soccer Field Height increased from previous 4.5' to current 8' Tall Wall with Deeper 1 Larger Footing LF 380 $ 264.00 $ 100,320.00 16A Additional quantity due to Taller Wall/ Safe Slopes - Remove ,Stockpile Soil on site for later use. Excavate soil, remove slope from back of walls . Cu.Yd . 342 $ 12.00 $ 4,104.00 21A Additional quantity due to Taller Wall I Safe Slopes - Backfill wall and compact fill at 1' intervals to finish sub grade of proposed concrete slab Cu. Yd 795 $ 12.00 $ 9,540.00 ADD Drainage at Building , December 13, 2017 113,964.00 44 8" ADS Perforated Pipe, with 2'x2' Stone and Filter Fabric envelope LF 200 $ 36.00 $ 7,200.00 45 8" ADS 90 Degree BENDS EA 2 $ 76.00 $ 152.00 46 CLEAN-OUT ASSEMBLIES EA 2 $ 244.00 $ 488.00 Line Item OVER -RUNS charged to contingency 7,840.00 18A CMU SPLIT -FACE MASONRY BLOCK WALL, Retaining Wall at South end of Existing Field LF 5 $ 92.80 $ 464.00 19 A *CMU SPLIT -FACE MASONRY* RETAINING WALLS. LF 26 $ 120.00 $ 3,120.00 ALT Move Flagpole, Keystone Labor & Equip. LS 1 $ 346.00 346.00 47 Additional Elect. Work. December 2017 - Pour Concrete Slab at Transformer, Add 120 V LS 1 $ 4,051.45 $ 4,051.45 51 Outlet. EA 6 $ 159.00 954.00 Additional Work 7,635.45 48 Remove & Re -set SCOREBOARD . LS 1 $ 1,024.00 1,024.00 48a 1" PVC pipe to Scoreboard LF 115 $ 13.00 1,495.00 49 Move Flagpole, Keystone Labor & Equip. LS 1 $ 346.00 346.00 50 Contract Item 2 - Silt Fence, Contract Item. LF 600 $ 1.50 900.00 51 Re -move and Re -Plant Slash Pine Trees, per City. EA 6 $ 159.00 954.00 52 Work on Swale to Pond, Keystone Crew DAY 1 $ 2,730 .00 2,730.00 53 Remove Pine Trees EA 2 $ 205.00 410.00 54 Add'I Grading Area, Outside Fence SF 18,000 $ 0.24 4,320.00 55 Add'! Sod Area, Outside Fence SF 18,000 $ 0.60 $ 10,800.00 56 Contaminated Soil Testing EA 10 $ 150.00 $ 1,500.00 57 Gate Valve, Added to Reclaim to Isolate Line EA I $ 1,174.00 $ 1,174.00 58 6" Gate Valve, Added to Reclaim to Isolate Line EA I $ 1,642.00 $ 1,642.00 59 Extend Block Retaining Wall, near Drew Street. LF 35 $ 264.00 $ 9,240.00 60 Concrete Cap, Dbl Rebar at Masonry Walls LF 911 $ 35.00 $ 31,885.00 61 Deduct Stucco Cap at Masonry Walls LS I $ (5,520.00) $ (5,520.00) 62 Credit for Expansion Joints at Masonry Wall LS I $ (1,100.00) $ (1,100.00) Repairs from CITY's Storm Crew BREAK in lines 63 Repair Break in Reclaim at Dbl. Check Valve, Jan 3 64 Bends, Fittings for Repairs Revisions , related to Changes directed on the job, during .January LS $ 1,364.82 LS 65 Add Grading at Northwest comer of Main Field LS $ 2,407.00 61,800.00 $ 1,364.82 $ 804.18 2,169.00 2,407.00 66 Additional Import Fill at Northwest comer of Main Field ( using Contract price for Import Fill ) CY 72 $ 19.40 $ 1,396.80 67 Remove old Telephone Poles, laying down in Parking, which were being used as Wheel Stops. LS 1 $ 802.00 $ 802.00 Joe DiMaft;io Sports Complex, Northwest Soccer Field Renovation ' Keystone'Excavators 371 Scarlet Blvd, Oldsmar, FL 34677 Final Reconciliation of Added Work Items, Add'I work Quantities , and Credits I Deducts Date : May, 2018 Listing: of Items Charged to Contingency Item Contingency Breakdown and Project Adjustment Credits 39 Contingency, ORIGINAL Contract amount DL 1 $ 75,500.00 ($75,500.00) 68 Poured Additional Concrete Slab at Electric compound, using Contract Square Foot price SF 120 $ 6.00 $ 720.00 $ 69 Installed fifteen feet of 8" ADS Storm price and extended into existing swale on northwest side. LS I $ 1,203.00 $ 1,203.00 70 Graded area at Westside of Field to make area level and mow -able. LS 1 $ 3,209.00$ 3,209.00 71 Stripped Grass, Graded area at East side of Concession Stand , for new Sod. L5 I $ 1,344.00 ` $ 1,344.00 72 New areas of Celebration Sod , various locations at Contract Unit Price for Sod. SF 4,500 $ 0.50 $ 2,250.00 73 Remove Bollards from West side of Parking Lot LS I $ 802.00 $ 802.00 74 Remove and replace twenty feet of 12" ADS Storm Pipe at Access Road between Soccer Fields . L5 I $ 802.00 $ 802.00 75 Malin -Diaz Irrigation Work, see attached Invoice for cost breakdown . LS 1 $ 11,535.20 $ 11,535.20 76 Contaminated Soil Testing , for new source. EA I $ 150.00 $ 150.00 77 Additional Mobilization for SMR Sod EA 1 $ 2,205.00 $ 2,205.00 78 Additional Areas of Celebration Sod SF 3,600 $ 0.50 $ 1,800.00 79 Asphalt Patching, Small Areas Tons 5 $ 275.00 $ 1,375.00 $ 32,001.00 Date : Februa ry 26, 2018 'Subtotal of ADDITIONAL Costs $ 395,558.25 Listing: of Items Charged to Contingency Item Contingency Breakdown and Project Adjustment Credits 39 Contingency, ORIGINAL Contract amount DL 1 $ 75,500.00 ($75,500.00) Plus , Add in Items not constructed , Moved to Contingency 9 Demolish Pump House LF 1 $ 2,457.00 ($2,457.00) 19 ALT *CMU SPLIT -FACE MASONRY* RETAINING WALLS, at original wall height. LS 370 $ 120.00 ($44,400.00) 20 4" PVC Drain Pipe behind Retaining Walls, with Penetrations into retaining wall at 30 feet on center. LF 338 $ 19.00 ($6,422.00) 23 6" RUBBLE RIP -RAP at Control Structure, 24" thick layer, with Filter Fabric . TONS 22 $ 140.00 ($3,080.00) 35 CELEBRATION ROLL SOD, with * 2" * Thick Root mass. (replace with 1" root mass) SF 213,600 $ 0.60 ($128,160.00) 37 Surveyed As-Builts ( were NOT required) LS 1 $ 2,449.00 ($2,449.00) 38 Direct Purchase LIGHT POLES, Deduct Phase 2 mat'I cost DL 1 $ 29,000.00 ($29,000.00) Revised Contingency (Original amount plus unused items) ($291,468.00) Contract Additions (Charqed to contingency) $ Continqency & Credits from change orders. Additional funds to complete contract 395,558.25 ($291,468.00) 104,090.25