EAST GATEWAY STORMWATER AND SANITARY IMPROVEMENTS PROJECT - 13-0043-EN - RATIFY & CONFIRM CHANGE ORDER #1I dr
Ratify & ConfirmChange Order 1
PROJECT:
East Gateway Stormwater & Sanitary
Sewer Improvements
CONTRACTOR:
David Nelson Construction Co
3483 Alt 19
Palm Harbor, Fl 34683
DATE:
PROJECT NUMBER:
PO REFERENCE:
COUNCIL AWARD:
DATE OF CONTRACT:
CODE:
April 17, 2018
13 -0043 -EN
ST113679
January 19, 2017
February 6, 2017
ENST180009-CONS-CNSTRC a
3217321-563800-96636 B
3217321-563800-96739 C
3827382-563800-96742 D
ENRD 180004-CONS-CNSTRC E
SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract
to add items for roadway improvements and add 279 days for a new completion date of 11/30/2018 -see attached.
T 104
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Ratify&Confirm Change Order 1 -City Council -
NEW CONTRACT AMOUNT
APPROVED AS TO FORM:
wK
it
Owen Kohler,
$ 11,409,143.90
$ 421,554.60
$ 11,830,698.50
(14:"
fol Rosemarie Call,
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
AC*EPT a BY:
l�
By:Y
David L. Vekas i
D. `rNagai Coiistriittion Co.
ice.
P> 1/ c r '(SEAL)
/, Vice President
Date: 5 9 - 1 Qj
Recommended By:
City of Clearwater
Jenn fe non, PE
Project Manager
WL f • hL—-z74i
William B. Horne, II City Manager ►' D. Scott Rice, PE, City Engineer
Ratify & Confirm Change Order 1 East Gateway Stormwater & Sanitary Sewer Improvements
ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST
Code A Decreases:
113a 14" ROADWAY BASE SY 5106.839563 $ 36.00 $ (183.846.22)
602a Milling Exist Aph Pavt, 2" Avg Depth LS 0.7 $ 68.267.89 ` (47.787.52)
Total (Decreases) Code A: 5 (231,633.74)
Code B Decreases:
113c 14" ROADWAY BASE SY 4815.620697 $ 36.00 $ (173,362.35)
602c Milling Exist Aph Pavt, 2" Avg Depth LS 0.7 $ 64,374.89 $ (45,062.42)
Total (Decreases) Code B: $ (218,424.77)
Code C: Decreases:
113d 14" ROADWAY BASE SY 448.5517441 $ 36.00 $ (16,147.86)
602d Milling Exist Aph Pavt, 2" Avg Depth LS 0.7 $ 5,996.21 $ (4,197.35)
Total (Decreases) Code C: $ (20,345.21)
Code D: Decreases:
113b 14" ROADWAY BASE SY 2345.988056 $ 36.00 $ (84,455.57)
602b Milling Exist Aph Pavt, 2" Avg Depth LS 0.7 $ 31,361.01 $ (21,952.71)
Total (Decreases) Code D: $ (106,408.28)
Total (Decreases): (576,812.00)
Code E Additions:
701 Maintenance of Traffic LS 1 $ 183,450.00 $ 183,450.00
702 9" Roadway Base SY 22642 5 28.00 $ 633,976.00
703 9" Roadway Base on Franklin & De Leon East of SY 2216 $ 25.00 $ 55,400.00
Hillcrest (No Asphalt Demo or Curb Pads)
704 2" Asphalt Concrete Structural Course Type SP TON 206 $ 118.00 $ 24,308.00
9.5
705 Milling Existing Asphalt Pavement 2" Avg SY 1870 $ 5.60 $ 10,472.00
Depth
706 10% Contingency LS 1 $ 90,760.60 $ 90,760.60
Total Increases Code E: $ 998,366.60
Total Net (Decreases)/Increases: $ 421,554.60