Loading...
EXTENSION - EAST GATEWAY STORMWATER AND SANITARY IMPROVEMENTS PROJECT - 13-0043-EN (2) Email Received 5/3/18 East Gateway—additional time granted Shannon,Jennifer Reply Snan'Syn,a,qsh cnsym3nskinelsoi7-cYistrju-ion.com,,>:Kurt,,Tir�v dTy M.,saw,Lau,a -vl2019 addtltimegr- 12<R 6:'d ' ' D-,vnk,ad Ss%lc to Oner)rive-Gry of Cearvvter Hi Brian, Attached to this email is a table shoot ngtfie additional time ghat twill be granted to the East Gateway-Stormwater and Sanitary Sewer project..The newtotal time granted tathe project is 279 days with completion date of NovernberM,2018. Please ensure that new project schedules reflect this information. Thank.you. Jennifer Jennifer W.Shannon,PE,CFM Senior Professional Engineer City of Clearwater 727-562-4773 East Gateway - Additional Days Underground Conflicts Days Approved Sanitary conflict at Pierce St and Stevenson Creek 10 days (previously approved) 12" Reclaimed Water Main Conflict with 7 days (previously approved) stormwater on Pierce St Existing water main in conflict with proposed 3 days (previously approved) storm sewer on Pierce St Changes to tie-in of proposed 20" water main at 18 days (previously approved) Hillcrest and Court St Endwall shift 18 days (previously approved) Unknown pipe found on south side of Franklin St 6 days (previously approved) east of Stevenson Creek Existing reclaimed water main in conflict with 3 days (previously approved) proposed 20"water main on S Hillcrest Ave Hurricane Irma 8 days (previously approved) Additional work:Added 6"water main on Hillcrest 28 days (previously approved) Subtotal 101 days Project delays due to utility conflicts Days Approved Added sanitary sewer work for reclaimed water 4 days (previously approved) main conflicts on Hillcrest Conflict with fiber optic cable/conduit and sanitary 1 day(previously approved) MH-315 Conflict with unmarked water main and storm 1 day(previously approved) inlet 5121 Fiber optic pull box& cable/conduit and power 21 days pole guy wire conflict with new storm sewer outfall at Pierce and Lady Mary Fiber optic cable/conduit conflict with new 21 days sanitary sewer main from MH-307 to 310 at Pierce and Fredrica Power pole conflict with new storm sewer at 68 days Franklin and Waverly Subtotal 116 days Additional Required Roadwork Days Approved Concrete pavement removal on Park St and Betty 4 days (previously approved) Lane Mill and resurface San Juan from Hillcrest to San 1 day Remo Rebuild roadway on Franklin and De Leon east of 12 days Hillcrest Rebuild roadways west of creek in lieu of mill and 45 days resurface Subtotal 62 days Grand Total 271days