LIFT STATION 28 & 39 REHABILITATION - 15-0033-UT - SUBSTANTIAL COMPLETION LETTER Af
CI<sR IVIl'`r1`I E OF S11 RSTANTIAL C'ONtP!_.ETICl N
Pro'ect Rehabilitation of Lift Mations 28 and 39 Contract Nuniber 15-0033-UT
Location; LS-28 499 Island Way,I-S-39 713 Island Way
Contract Date: 08/21117 'entice to Proceed' hate: 091211117
Substantial Completion Date 02105118 Warranty Expiration Dater 02/0,/19
Consultant: Metzger + Willard
]"he cccark perfOMIe(l uncle- this Contract has been inspected b eaulhorized repre°sentatises erfIhC C)XVracr,
Contractor,and Consultant. and the Project (car specified part of'the Pro ieict,as indicated above) is herehv
declared to be substantially completed on the at-Kwe date.
DEFINITION OF SUBSTANTIAL C'ClPt PIXTION
Subtcrrrt01 c`ompleijon i,� the s,1q e arr construction when o Pro) r ®r-akvi,�ncrte clpor°tzon (hereof is
serf fie'ieFrttla c'rrmplele in c.cc`orcfanc a ee rth c o nwac't clo ume nts,err flint the t.�ae rac°r e:ctrr use the ►a rrrk or
porihm thereof:Jtrr rt+• wfenekcl use Items that affect orlreratrexrrul rnte gritt cruel f inc'hon o hey WOrk rrtttst
be capable of-continuous U.Ve
I
Jam 11 �rtclli, PI M E l Z G E R & \k 11,LA 1 BN,
C"a�nsttltani Authorized Representative Date
The.Contractor accepts the. above Certificate of Substantial Completion sand agrees to complete:and correct
the items cats the tenttati c list within the uric indicated.
y
Wade WoodritRTD C ON' TRUC'TION
Contractor AaA6rtied Repre nt at4 ` Bate
The: Owner accepts the specified area of the Pr(1ect as Substantially ('Ornplete and %,ill assuraac full
possession of the spec ilie d area o]'the I'rQtect can ,1016. Ile responsibility fear utilities,
security. and insurance under the Contract Documents shall be as set orth in t1w Contract DOccM-ie'nts,
Tadd Kuh 1, l:ng nccrin 4 Dc .. rtme nt 13
City of C'learNvater Awho rized Re1°rresentatit e Bate
Certificate of Substantial Completion, Page 2 of 2
PROJECT PUNCH LIST
A punch list of itenis to) he completed or corrected hN Xjarch I -20 1'8 is appended hereto, I-his list 1113N
not he exhaustive, and tile taflurc to include an Mem on i dxws no( alter tile responsibility of the ('ontraclors
to complete all the Nvork in accordance with the('ontract Wcumenti.
PROJECT ONE 'VE AR XNARRANTN"
Contract Section/it,
13.5 WARRA)MICORRECTION PERIOD
It-within one'vear after the tiatt,ol'Substannal Completion oar such iong-ev period of bine'as waw be prescribed
by Laiv.c or Regulafioms ew by rhe terms orl spry:opplicable sIN't-wigilarantee requirea'11v the Cw1tract
1Nwi(wn1,,v or v anip specific prowsion of the Contract Doctanews, ans Work is finind is') be dcleclivt%
('ontractur shall prompth, ti ithow Cf is/ to (he Owner anei in accordan(v with the owner's writ en
in.s1rut'lumv: fo iwrrect vrte..-h ckfecfive [Vork, w% il'o has been rejected M Me (hvner, remove it frena thc mie
and replace it wiih ff'ork that is not de feei i ve twul in)satislactortiv correct or remove and reph we ani,dainage
to rather ff'Ork or the work(if'whers revrlhin'g lherejrtnll
Where 4defi'cnve fV'(jrk, (and datnage to other Ifork resulmig there jfromr has been correceett retnoved or
replaced uncier this parqi�raph the correctrun peri(ki hereunder with re.sjwct to such ff'ork will he extended jor
tin adtinional Ivrioel ql onevear(.after such correcfion or removal anti replacenient ha.s beensatisfiiciord-v
completed
Substantial Completion Date: February 5, 2018
Warranty Expiration. Date: February 5,2019
A copy of This signed and executed docurnctit diould be pro-,[ded to the following parties.,
Project Owner
Project Contractor
Protect ('onsultani (ifapphcabfe�
(.'It\ ('onstruction Office Specialist
Project File