MOCCASIN LAKE NATURE PARK INTERPRETIVE CENTERKEYSTONE EXCAVATORS, INC.
CUCO 56698
FPSCV 72520700011996
February 2, 2018
TO: Leroy Chin, Park Planning and Project Manager
City of Clearwater — Parks and Recreation Department
100 S. Myrtle Avenue , Suite 120
Clearwater, FL 33756
371 Scarlet Blvd.
Oldsmar, FL 34677
Phone 813-854-2342 Fax 813-854-2993
RE: Moccasin Lake NATURE PARK, INTERPRETIVE CENTER
City of Clearwater, Parks And Recreation Dept Project # TBD
As requested, enclosed is the proposal for construction of Moccasin Lake NATURE PARK,
INTERPRETIVE CENTER submitted in accordance with technical specification and project
Plans for a Guaranteed Maximum Price of $181,588.00
Scope of Work:
Perform clearing and selective demolition . Construct watermain and sewer piping,
conduits and sanitary lift station. Construct concrete curbs and sidewalks, and asphalt
Finish grade and sod disturbed areas. See attached Proposal for the detailed Scope of
Work
Cost Detail:
Project Duration shall be 150 calendar days from the date of the Notice to Proceed.
Description
Amount
Cost of Work
$ 165,080.00
Subtotal
$ 165,080.00
Contingency
10
%
$ 16,508.00
Guaranteed Maximum Price
$ 181,588.00
Project Duration shall be 150 calendar days from the date of the Notice to Proceed.
Existing Contract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August
4, 2016, based on RFO #24-16.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once the City
receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the
attached bond form as well as the Power of Attorney. (If GMP is less than $ 150,000 a bond
is not requirecb )
For work performed, invoices shall be submitted to the City of Clearwater, Engineering
Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida,
33758-4748. Contingency services may be billed only after written authorization is provided by
the City to proceed with those services.
Appro ed as to form:
Ma
Ass stant Ci Attorney
ew M.
ith
Countersigned:
cteo(tt Act Atkos.
George N. Cretekos
Mayor
Date
1/4
KEYSTONE EXCAVATORS , INC.
Bv:
Robert Fornwalt
President
Fep,Rakka.ti 2 , 2.0,8
Date
CITY OF CLEARWATER, FLORIDA
Attest:
By,,, .C -r.- _t 4h k..
Rosemarie Call
City Clerk
Wati-A,A, /11.6
William B. Horne II
City Manager
Date
PUBLIC WORK PERFORMANCE AND PAYMENT BOND FRONT PAGE
"This bond is given to comply with Section 255.05 Florida Statutes, and any action
instituted by a claimant under this bond for payment must be in accordance with the
notice and time limitation provisions in Section 255.05(2), Florida Statutes."
BOND NO.: 483039P
QQNTRACTQR NAME:Yatgne Excavators, Inc..
CONTRACTOR ADDRESS: 371 Scarlet Blvd., Oldsmar, FL 34677
CONTRACTOR PHONE NO.: (813) 854-2342
SURETY COMPANY: Developers Surety and Indemnity Company
SURETY COMPANY ADDRESS: 17771 Cowan Ave., Suite 100, Irvine, CA 92614
SURETY COMPANY PHONE NO.: (727) 822-5610
SURETY AGENT: The Shrum Agency
SURETY AGENT ADDRESS: 2227 Pinnacle Circle N., Palm Harbor, FL 34684
SURETY AGENT PHONE NO.: (727) 781-9797
OWNER NAME: City of Clearwater, Parks and Recreation Dept.
OWNER ADDRESS: 100 S. Myrtle Avenue, Clearwater, FL 33756
OWNER PHONE NO: (727) 562-4800
BOND AMOUNT: $ 181,588.00
CONTRACT NO.: (If applicable)
DESCRIPTION OF WORK: Moccasin Lake Nature Park, Interpretive Center
PROJECT ADDRESS: City of Clearwater, Florida
LEGAL DESCRIPTION: (If available)
All other Bond page(s) are deemed subsequent to this page regardless of any page
number(s) that may be pre-printed thereon.
Bond No.: 483039P
PUBLIC CONSTRUCTION BOND
(1)
This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for
payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10).
Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a
default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond.
Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the
public entity may not make a payment to the contractor until the contractor has complied with this paragraph."
CONTRACTOR
Keystone Excavators , Inc.
371 Scarlet Blvd
Oldsmar, FL 34677
(813) 854- 2342
SURETY
Developer's Surety
and Indemnity Company
17771 Cowan Ave, Suite 100
Irvine CA 92614
(727) 781-9797
OWNER
City of Clearwater
Parks and Recreation Department
100 S. Myrtle Avenue
Clearwater, FL 33756
(727) 562-4800
PROJECT NAME: Moccasin Lake NATURE PARK, INTERPRETIVE CENTER
PROJECT NO.: TBD
PROJECT DESCRIPTION: Perform clearing and selective demolition . Construct watermain and sewer
piping, conduits and sanitary lift station. Construct concrete curbs and sidewalks, and asphalt. Finish
grade and sod disturbed areas. See attached Proposal for the detailed Scope of Work
BY THIS BOND, We , Keystone Excavators , as Contractor, and Developer's Surety and Indemnity Company , a
corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of $ 181,588'00
for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally.
THE CONDITION OF THIS BOND is that if Contractor:
1. Performs the proposal dated [ January 25, 2018 ], between Contractor and Owner for construction of :
Moccasin Lake NATURE PARK, INTERPRETIVE CENTER , the contract documents being made a part of this
bond by reference (which include the Advertisement for Bids, Proposal, Contract, Surety Bond, Instructions to Bidders,
General Conditions, Plans, Technical Specifications and Appendix, and such alterations as may be made in said Plans and
Specifications as therein provided for), at the times and in the manner prescribed in the contract; and
2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor
with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in
the contract; and
3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner
sustains because of a default by Contractor under the contract; and
Bond No.: 483039P
PUBLIC CONSTRUCTION BOND
(2)
4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and
employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the
extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or
utilized by Contractor in the performance of the construction contract; and
5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the
contract, then this bond is void; otherwise it remains in full force.
6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time
limitation provisions in Section 255.05(2), Florida Statutes.
7. Any changes in or under the contract documents and compliance or noncompliance with any formalities
connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby
waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to
the specifications.
IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this 6th day of February, 20 18.
(lf , - .. .
(If Corporation, Secretary only will attest and affix seal).
WITNESS:
rporate Secretary or Witness
Print Name: '- Mt v ti r
(affix corporatg seal)
(Power ofAttorney must be attached)
Keystone Excavators, Inc.
Contractor)
By: i; ar-lii...4r A
Title: President
Print Name: Robert C. Fornwalt
WITNESS:
Print Name:
Develo . ers Sure and Indemn' " ; om an
[Corporate Surety
�
By ��4/® %.
ATTORN Y- -FACT
Print Name: Warren M. S
(affix corporate seal)
POWER OF ATTORNEY FOR
DEVELOPERS SURETY AND INDEMNITY COMPANY
PO Box 19725, IRVINE, CA 92623 (949) 263-3300
KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY, does hereby make, constitute and appoint:
***Warren M. Shrum Jr.*
as its true and lawful Attomey(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporation, as surety, bonds, undertakings and contrails of suretyship
giving and granting unto said Attomey(s)-in-Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said
corporation could do, but reserving to each of said corporation full power of substitution and revocation, and all of the ads of said Attomey(s)- n -Fact, pursuant to these presents, are
hereby ratified and confirmed.
This Power ofAttorney is granted and is signed by facsimile under and by authority of the following resolution adopted by the Board of Directors of DEVELOPERS SURETY AND
INDEMNITY COMPANY, effective as of January 1st, 2008.
RES43.VER, that a combination of any WM of the Chairman of the 9aard, the Preeittete, any Eiiscutiye Vice=Presieent, r VIr President or VicM)Tfitiltifil of the
corporation be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorney(s) named in the Power of Attorney to execute, on behalf of the
corporation, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of the corporation be, and each of them hereby is, authorized to attest the
execution of any such Power of Attorney;
RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attomey or to any certificate relating thereto by facsimile, and any such
Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond, undertaking
or contract of suretyship to which itis attached.
IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY has caused these presents to be signed by its officers and attested by its Secretary or Assistant
Sewatarythis 6i day of Feburary, 2017.
[tlahiel You t Senior Vie P silent
Mark lasdon, Vice -President
State of California
County of Orange
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
OA February 6, 2017
personally appeared
Dere
before me,
Lucile Raymond, Wary Public
Here Insert Name and Nee avle Weer
Daniel Young and Mark Lansdon
LUCILLE RAYMOND
Commission 0 2081015
Notary Public - California
Orange County
Comm. ExWres Oct 13.2018
Place Notary Seal Above
Names) of Seper(s)
who proved tome on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed
to the within instrument and admowtedged to me that he/she/ hey executed the same in his/herltheir authorized
capacity(ies), and that by hisfher/their signature(s) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument
I certify under PENALTY OF PERJURY under the laws of the State of Calitomia that the foregoing paragraph is
true and correct.
WITNESS my hand and official seal.644/7114
Signature
Lucille ond, Notary Public
CERTIFICATE
The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby
Gertdythat t;'me foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of
d cdrporations;set kith in the Power of Attorney are in force as of the date of this Certificate.
this Certificate is ekecute�d in the City of (vine, California, this
73Ufs t
Cassie Jrrisford, Assistant
'‘,6Ys-ipoe (02117)
lith daY of February , 2018 •
Moccasin Lake NATURE PARK, INTERPRETIVE CENTER Project
Sitework , Utilities , Paving work
BIDDERS PROPOSAL & BILL OF QUANTITIES
ITEM
NO.
DESCRIPTION
QUANTITY UNITS]
UNIT
PRICE
TOTAL
Contractor shall provide insurance, labor, equipment & materials necessary to construct the below portions of the
Moccasin Lake Nature Park Interpretive Center Project, according to plans developed by the City of Clearwater.
MOBILIZATION. CLEARING and DEMOLITION
2 . EQUIPMENT & CREW MOBILIZATIONS, per EACH TRIP 1 EA $ 3,209.00 i $3,209.00
3 . SURVEY LAYOUT & AS-BUILTS BY CITY
4 . MAINTENANCE of TRAFFIC
5 . SILT FENCE
6 . TREE BARRICADES - - None shown
7 . REMOVE CHAIN LINK FENCE ,
8 . DEMOLISH BUILDINGS ,
BY OTHERS
BY OTHERS
9. TREE REMOVAL, BY OTHERS
10 . REMOVE BENCHES, ITEMS at Amphitheater BY OTHERS
11 . SAWCUT, DEMOLISH EDGES OF ASPHALT PAVEMENT
12 . DEMOLISH CONCRETE SIDEWALKS
1 LS $ 1,688.24 $1,688.24
1,940 LF $ 1.50 $2,910.00
280 SY
SF
13 . DEMOLISH GRAVEL AREAS, as Listed on Plans - - REMOVED from Scope
14 . REMOVE SHELL AREAS, STOCKPILE BY OTHERS - SF
15 EXCAVATE UNSUITABLE SOILS -NO SOIL BORINGS
16 . EARTHWORK - see Below items
17 EXCAVATE area, GRADE for PLAYGROUND ,
to allow for Playground Mulch material,
18 . MULCH / MATERIAL at Playground
BY OTHERS
BY CITY
$ 9.00 I $2,520.00
BY CITY
BY CITY
EXCLUDED
$ 0.00 BY CITY
BY CITY
IMPORT FILL at AMPHITHEATER and GRASS PARKING SPACES
19 IMPORT FILL MATERIAL per Plan Elevations ,
PLUS Add 2" Over Gravel at Parking Lot
20 . Import Fill , LABOR & EQUIPMENT to SPREAD and COMPACT 740 CY
740 CY
$ 15.00 4 $11,100.00
$ 6.00 $4,440.00
21 . FINAL GRADING
SANITARY SEWER and FORCE MAIN. LIFT STATION
22 .
24 2" PVC FORCE MAIN. Excavate 2 Pits, DRILL PIPE under Paving,
BACKFILL PITS.
8" PVC SANITARY SEWER
SANITARY CLEANOUTS
3,684 SY
145 LF
25 . FORCEMAIN PRESSURE TEST
26 . LIFT STATION
27 . LIFT STATION MATERIALS & Sales Tax, Including Extra Pump
_
EXCAVATE for Lift Station, SET WETWELL and VALVE BOX, POUR
28 . CONCRETE at botttom/Footing. ASSEMBLE PIPING, CONNECT
PUMPS. BACKFILL and COMPACT .
29 . ELECTRIC SUPPLY TO Lift Station and Electric HOOK-UP to Pumps
30 . CORE MANHOLE , CONNECT FORCEMAIN to EXISTING MANHOLE
REPAIR PAVING at OPEN CUT for Manhole Connection
31 . 12" BASE , 2" S-1 ASPHALT
32 STORM DRAIN shown on Plans , DELETED January 24th
1 EA
1 LS
$ 2.00 $7,368.00
$ 33.00 $4,785.00
$ 290.00 $870.00
$ 18.00 $5,760.00
$ 1,240.00 $1,240.00
$ 17,301.29 $17,301.29
$ 15,920.27 $15,920.27
$3,500.00
$1,483.00
$ 2,840.00 $2,840.00
$ 3,500.00
$ 1,483.00
33 . CONDUIT for ELECTRICAL and COMMUNICATIONS BY BUILDING CONTRACTOR's Electrician
Those Lines connect to Buildings, with Requirements that Keystone is not familiar with working on a regular basis.
34 . WATER MAIN work
35 . 1 1/2 PVC WATER MAIN
36 . CORP. VALVE in "J" BOX
242 LF
Page 1 of 2
1 EA
$ 7.00
$ 648.00
$1,694.00
$648.00
NOM
DESCRIPTION QUANTITY UNITS
UNIT
PRI EC i TOTAL
37 . WET TAP AT WATERMAIN, By CITY
By CITY
38 . IRRIGATION and WATER METERS , By CITY
By CITY
39 . KEYSTONE EXCAVATE / BACKFILL PIT for City Crews 1 LS
$ 1,540.00
$1,540.00
40 . TEST & CHLORINATE WATER 1 LS
$ 820.00
$820.00
41 .
BASE • PAVING & FINISH ITEMS
42 .
TYPE "D" CURB at ISLANDS. per Plans
375 LF
$ 26.00
$9,750.00
43 .
TYPE "D" CURB at EAST side of PARKING , Value Engineering ,
264 LF
$ 26.00
$6,864.00
instead of 12" Concrete Curb & Wheel Stop
44
12" Wide CONCRETE STRIP on Plans - -DELETED from Scope
0 LF
( Support for Wheel Stops )
45 . PARKING LOT WHEEL STOPS
0 EA
6" wide x 18" deep HEADER CURB
46 . at Amphitheater area and
surrounding the new Playground Area
253 LF
$ 26.00
$6,578.00
47 STABILIZED SUBGRADE , 3' wide under Curbs as Shown on Plans
- SY
$0.00
DELETED from SCOPE Jan. 22, 2018
48 . VALLEY CURB ( in Parking, for Drainage)
120 LF
$ 34.00
$4,080.00
49 . 1 1/2" ASPHALT OVERLAY
1,190 SY
$ 12.50
$14,875.00
50 .
CONCRETE Flat work
51 .
6" Thick CONCRETE SIDEWALKS
2,540 SF
$ 6.50
$16,510.00
52 . 4" thick CONCRETE SIDEWALKS
1,830 SF
$ 5.50
$10,065.00
ADA HANDICAP RAMPS ( Note : 1 shown on Plans , NONE in Quote )
53.
0 EA
( Sidewalks are Flush with Paving )
54 .
SIGNS and STRIPES
55 .
PARKING STALL STRIPES
3 EA
$ 50.00
$150.00
56 . HANDICAPPED SIGN AND STRIPES
2 EA
$ 440.00
$880.00
57 . PARKING LOT WHEEL STOPS - see in Curb Section Above
58 . PARKING LOT STOP SIGNS , None shown
- EA
59.
RESTORATION Work
60 .
CHAIN LINK FENCE - By OTHERS
By OTHERS
61 . BAHIA SOD at GRASS PARKING area
9,228 SF
$ 0.40
I $3,691.20
62 . IRRIGATION , LANDSCAPING/RESTORATION - BY OTHERS
By OTHERS
63 . SITE AMENITIES - - WASTE CANS, BIKE RACKS, BENCHES, etc - - By OTHERS
By OTHERS
64 . IRRIGATION , LANDSCAPING - - By OTHERS
By OTHERS
65 . Sub-total of Items 1 - 64 $165,080.00
66 . 10 % Contingency of line 65 $16,508.00
67 . Total of Items 1 - 64 and 10% Contingency Item No. 66
COMPANY'S NAME : KEYSTONE EXCAVATORS. INC.
ADDRESS: 371 Scarlet Blvd CITY: Oldsmar ZIP CODE : 34677
TELEPHONE : 813-854-2342 FAX : 813-854-2993 E MAIL : Dave(a�KevstoneEacavators.com
PRINTED NAME : David Atkins
SIGNED : TITLE : Estimator DATE : January 25 . 2017
$181,588.00
10% contingency shall be utilized only upon written request by the Contractor for additional scope of work not included in the bill of quantities to the
Owner and written approval by the Owner for the additional scope of work in the utilization of the 10% contingency. Any funds not utilized shall be
returned to the owner upon close out of the purchase order short.
THE BIDDER'S GRAND TOTAL ABOVE IS HIS TOTAL BID BASED ON HIS UNIT PRICES AND LUMP SUM PRICES AND THE
ESTIMATED QUANTITIES REQUIRED. THIS FIGURE IS FOR INFORMATION ONLY AT THE TIME OF OPENING BIDS. THE CITY
WILL MAKE THE TABULATION FROM THE UNIT PRICES AND LUMP SUM PRICES BID. IF THERE IS AN ERROR IN THE TOTAL BY
THE BIDDER , IT SHALL BE CHANGED AS ONLY THE BID'S UNIT PRICES AND LUMP SUM PRICES SHALL GOVERN. THE CITY
RESERVES THE RIGHT TO SELECT ANY ITEMS AND OR REJECT ALL BIDS. THE TOTAL PRICE SHALL BE BASED ON ITEMS
SELECTED BY THE OWNER OF THIS PROJECT.
Page 2 of 2