ARLIE AVENUE STORMWATER IMPROVEMENTS - 17-0068-EN - PROPOSAL FOR CONSTRUCTION MANAGER AT RISK PROJECT sB Cu�IT AND REAMIFUL HAYTO HLACH CERTIFICATE SUBSTANTIAL COMPLETION Project: Arlie �������� t��� ���� ���� ���������� ����m���4Contract umber. 17-0068-EN Location- Arlie Avenue& Rose Road Contract Date- 01/03/2018 Notice to Proceed Date® 04/09/2018 Date of Substantial Completion: 06126118 The work performed under this Contract(specifically corrective storm drainage and paving work. by demolishing existing and constructing curbs and asphalt pavement at the intersection to the west end of Arlie Avenue, then constructing a concrete flume/outfall to drain this area; and finishing grading and sodding disturbed areas) has been inspected by authorized representatives of the fawner, Contractor, and Consultant,and the specified pert of the Project, as indicated above, is hereby declared to be substantially completed on the above date. DEFINITION F SUBSTANTIAL NTI PL TIO Substantial completion is the stage in construction when a project or designated portion thereof is sufficiently complete in accordance with contract documents so that the Owner can use the work or portion thereof for its intended use. Items that affect operational integrity and function of the work,must be capable of continuous use. A tentative list of items to be completed or corrected, in the substantially complete portion of the project described above, is appended hereto. This list may not be exhaustive, and the failure to include an item, on it does not alter the responsibility of the Contractors to complete all the work in accordance with the Contract Documents. The Contractor accepts the above Certificate of Substantial Completion of the outlined project area airl agrees to complete and correct the items on the tentative list within the time indicated. X y: 2- Keystone I' caviltorsi 1 . 1'r°iryl t" game'. (4.411111w-Led h(prest'nitaliry l)a The fawner accepts the Project as Substantially Complete and will assume full possession of the specified area of the Project on Junc 20, 2818, il' punch list w gt q...l� i� been cc}t picted, in theff entirety. The responsibi lity fbr utilities, security, and insurance under the Contract Documents shal l be as sot forte-alae Contract Dp urnents. � ffi,v � a� .� ,. 11 _. _ _. _ . X By: . ty of Cie at r Print Name a,f,4 uthorized Representalkre Date PROJECT PUNCH LIST A punch list of items to be completed or corrected by Jime 26, 2018, is appended hereto. This list may not be exhaustive, and Vie failure to include an item on it does not alter the responsibility eof the Contractors to complete all the work in accordance with the Contract Documents. PROJECT ONE YEAR WARRANTY Contract Section III, 13.5 WARRANTYICORRECTION PERIOD Jf within one year after the date of Substantial Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, Contractor shall promptly, without cost to the Owner and in accordance with the Owner's written instructions; (i) correct such defective Work, or, if it has been rejected by the Owner, remove it front the site and replace it with Work that is not defective and(ii)satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom.., Where dqfective Work(and damage to other Work resulting thereftoM) has been corrected, removed or replaced under this paragraph the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed, I Substantial Completion Date- 6126/18 Warranty Expiration Date: 6Z26/19 A copy of this signed and executed document should be provided to the following parties: Project Owner Project Contractor Project Consultant(if applicable) City Construction Office Specialist Project File Contractor: Keystone Excavators, Inc. RIGALT=AND,-�EALVIAFUL.BAY]0BEAXA Project: Arlie Avenue Stormwater Improvements(17-0068-EN) Walkthrough Date: 6/12/18 Engineering Department PUNCH LIST 100 S.Myrtle Avenue,#220 Punch List Completion Due Date: 6/26/18 Clearwater,FL 33756 Attendees: Phuong Vo(City PM),Tim Kurtz(City Construction Manager),Erik Soderlund(City Inspector) No. Description Date Inspected Photo(s) Signed Off By 1 Junction Box Cover 2 As-built corrections Page 1 of 1 KEYSTONE EXCAVATORS, INC. CUCO 56698 FPSCV 72520700011996 January 3, 2018 371 Scarlet Blvd. Oldsmar, FL 34677 Phone 813-854-2342 Fax 813-854-2993 Proposal for Construction -Manager -at -Risk Project TO: Vo Phuong, Engineering Specialist City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 220 Clearwater, FL 33756 RE: CITY OF CLEARWATER ENGINEERING DEPT ARLIE AVENUE STORMWATER IMPROVEMENTS Project #17 -0068 -EN GUARANTEED MAXIMUM PRICE ( GMP) As requested, enclosed is the proposal for construction of Arlie Avenue Stormwater Improvements submitted in accordance with the plans issued for this work, and as modified by clarifications as part of the overall project at Arlie Avenue, for a Guaranteed Maximum Price of $ 104.555.00 . All work is to adhere to the City's latest standard specifications and details including Maintenance of Traffic requirements. Scope of Work: 1. Areas of Work : Contractor will be working in the vicinity of the Arlie Avenue and Rose Road intersection, from Station 12+00 on Arlie Avenue to Station 10+80 at the West end of Arlie. Remove existing storm lift station and storm pipe, perform grading. Construction of concrete swale will be performed from the west end of Arlie Avenue down to the water's edge of Alligator Lake. Storm and curb/paving work will also take place on Arlie Avenue as described in above paragraph and at proposed storm structures S-4 and S-5 at the intersection of Arlie Avenue and Rose Road. 2. Scope of Work: Perform corrective storm drainage and paving work at Arlie Avenue/Rose Road as described further : Demolish existing and construct new storm drain pipe and storm inlets. Demolish and re -construct curbs and asphalt pavement at this intersection to the west end of Arlie Avenue and then construct a concrete flume/outfall to drain this area. Finish grade and sod disturbed areas. Cost Detail: Description Amount Cost of Work $ 82,652.17 General Conditions (or General Conditions/Supervision/Insurance/Bond) $ 8,265.22 Construction Management Fee $ 4,132.61 Contingency 10 % $ 9,505.00 Guaranteed Maximum Price $ 104,555.00 Project Duration shall be 60 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4.2016, based on RFO #24-16 . For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758-4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Typed name Camilo A. Soto Title Assistant City Attorney Countersigned: `O JOS George N. Cretekos Mayor �, ' r Date KEYSTONE EXCAVATORS, INC. By: ott'%Gk/ j� Robert C. Fornwalt President otcfr Date CITY OF CLEARWATER, FLORIDA Attest: By: Rosemarie Call City Clerk 6.) t. )4A,,,tcu. William B. Horne II City Manager __thy?) (4)/ -tel Dafe