Loading...
ISLAND ESTATES BRIDGE REPLACEMENTS - 13-0004-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINAL (2),Administrative Change Order 1&Final Date: October 25, 2017 PROJECT: Island Estates Bridge Replacements CONTRACTOR: All American Concrete, Inc. 8770 Somerset Drive Largo, FL 33773 PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE A: CODE B: CODE C: CODE D: 13 -0004 -EN ST111537 March 19, 2015 April 3, 2015 0315-92274-563800-541-000-0000 A 0327-96722-563800-533-000-0000 B 0327-96634-563800-535-000-0000 C 0327-96784-563800-533-000-0000 D SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Administrative Change Order 1 &Final - City Manager NEW CONTRACT AMOUNT Rosemarie Call, Date: &kk. Q (LJC4 i I,1 f CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ACCEPTED BY: All American Concrete, Inc. $ 3,673,266.71 $ (400,956.62) By: $ 3,272,310.09 Jeffrey Date: / Z/ < F>/ I 7 William B. Horne, APPROVED A City Manager Camilo Soto, Assistant City Attorney Witnesses: (two) (Seal) President Recommended By: Ci of Clearwater son, PE ct Manager Michael D. Quillen, PE, City Engineer Page 2 of 4 Administrative Change Order 1&Final: Island Estates Bridge Replacements ITEM DESCRIPTION Code A: Decreases: 100-015 DRILLED SHAFT, 36" DIA 100-016 CROSSHOLE SONIC LOGGING 101-015 DRILLED SHAFT, 36" DIA 101-016 CROSSHOLE SONIC LOGGING 102-014 DRILLED SHAFT, 36" DIA 200-004 BARRIER WALL, TEMPORARY, F&I, TYPE K 200-007 TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION 200-014 TYPE B STABILZATION 200-015 OPTIONAL BASE, BASE GROUP 06 200-016 TURNOUT CONSTRUCTION 200-021 SHOULDER CONCRETE BARRIER WALL, RIGID - CURB & GUTTER 200-022 CONCRETE SIDEWALK AND DRIVEWAYS 4" THICK 200-023 CONCRETE SIDEWALK AND DRIVEWAYS 6" THICK 200-024 PERFORMANCE TURF, SOD 200-025 PAINTED PAVEMPAINTED PAVEMENT MARKINGS, STANDARD, 200-026 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID 6" 200-027 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, DASHED 6" 200-029 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, DOTTED/ GUIDELINE 6-10 GAP EXTENSION 6" 200-030 BRIDGE 10% CONTINGENCY Increases: 100-004 CONCRETE CLASS IV SUBSTRUCTURE 100-010 REINFORCING STEEL- SUBSTRUCTURE 101-004 CONCRETE CLASS IV SUBSTRUCTURE 101-010 REINFORCING STEEL- SUBSTRUCTURE 102-004 CONCRETE CLASS IV, SUBSTRUCTURE 103-004 CONCRETE CLASS IV, SUBSTRUCTURE 103-014 DRILLED SHAFT, 36" DIA 200-003 WORK ZONE SIGN 200-005 TEMPORARY BARRICADE- TYPES I,II,DI,VP, DRUM, OR LCD 200-006 BARRICADE, TEMPORARY, TYPE III, 6' Additions: 100-020 100-021 101-020 101-021 102-019 102-020 103-019 103-020 SEAWALL SHEET PILING SHEET PILE INSTALLATION SEAWALL SHEET PILING SHEET PILE INSTALLATION SEAWALL SHEET PILING SHEET PILE INSTALLATION SEAWALL SHEET PILING SHEET PILE INSTALLATION UNIT QTY LF 78.44 EA 8 LF 99.21 EA 8 LF 1.03 LF 1,413 LO 15 SY 128.8 SY 102.32 SY 69 LF 15 SY 2.23 SY 7 SY 298.78 NM 0.128 NM 0.003 NM 0.126 LF 121 LS CY 10.74 LB 749 CY 10.74 LB 749 CY 8.40 CY 8.40 LF 30.36 ED 4,448 ED 5,356 ED 2,945 EA 97 LF 97 EA 97 LF 97 EA 103 LF 103 EA 103 LF 103 UNIT COST TOTAL COST $725.00 $375.00 $725.00 $375.00 $725.00 $34.00 $1,070.00 $40.00 $ $49.00 $ $89.00 $ $152.00 $ $69.00 $ $190.00 $ $7.00 $ $560.00 $ $1,500.00 $ $565.00 $ 0.45 $ (56,869.00) (3,000.00) (71,927.25) (3,000.00) (746.75) (48,042.00) (16,050.00) (5,152.00) (5,013.68) (6,141.00) (2,280.00) (153.87) (1,330.00) (2,091.46) (71.68) (4.50) (71.19) (54.45) 1 306118.34 $ (306,1 18.34) Total (Decreases) for Code A: $ (528,11 7.17) $905.00 $1.10 $905.00 $1.10 $905.00 $905.00 $725.00 $0.40 $0.25 $ 9,719.70 $ 823.90 $ 9,719.70 $ 823.90 $ 7,602.00 $ 7,602.00 $ 22,011.00 $ 1,779.20 $ 1,339.00 $0.35 $ 1,030.75 Total Increases for Code A: $ 62,451.15 $337.08 $61.02 $337.08 $61.02 $337.08 $61.02 $337.08 $61.02 $ 32,696.76 $ 5,918.94 $ 32,696.76 $ 5,918.94 $ 34,719.24 $ 6,285.06 $ 34,719.24 $ 6,285.06 .Page 3 of 4 Administrative Change Order 1&Final: Island Estates Bridge Replacements ITEM DESCRIPTION UNIT Q.. COST TOTAL COST 200-030 MILL & RESURFACE HARBOR PASSAGE SY 1,349 $12.60 $ 16,997.40 200-031 PERMANENT CASING LEFT IN PLACE LS 1 $5,213.00 $ 5,213.00 Total Additions for Code A: $ 181,450.40 Total Net (Decreases)/Increases/Additions to Code A: $ (284,215.62) Code B: Decreases: 300-002 UTILITY PIPE, F&I, DI, WATER, 12" LF 70 $226.00 $ (15,820.00) 300-005 UTILITY FIXTURES, F&I, 12" TAPPING SADDLE LF 2 $7,685.00 $ (15,370.00) 300-006 UTILITY FIXTURES, F&I, 8" TAPPING SADDLE LF 4 $4,625.00 $ (18,500.00) 300-007 UTILITY FITTINGS, F&I, DI, 12" LF 6 $733.00 $ (4,398.00) 300-008 UTILITY FITTINGS, F&I, DI, 8" LF 9 $435.00 $ (3,915.00) 300-009 UTILITY FITTINGS, F&I, DI, 12" BELL LF 2 $693.00 $ (1,386.00) 300-010 UTILITY FITTINGS, F&I, DI, 8" BELL LF 8 $455.00 $ (3,640.00) RESTRAINTS 300-011 WATERMAIN 10% CONTINGENCY LS 1 15,781.00 $ (15,781.00) Increases: 300-001 UTILITY PIPE, F&I, DI, WATER, 8" Total (Decreases) for Code B: $ (78,810.00) LF 34 $180.00 $ 6,120.00 Additions: 300-029 2" BYPASS FOR 8" WM LS 300-030 6" TEMPORARY BYPASS FOR 12" WATERMAIN LS Total Increases for Code B: $ 6,120.00 1 $2,350.00 $ $10,662.00 $ Total Additions for Code B: $ 2,350.00 10,662.00 13,012.00 Total Net (Decreases)/Increases/Additions to Code B: $ (59,678.00) Code C: Decreases: 300-015 UTILITY FITTINGS, F&I, POLY LINED DI, 8" LF 6 $750.00 $ (4,500.00) 300-017 UTILITY FITTINGS, F&I, DI, 8" BELL LF 10 $435.00 $ (4,350.00) RESTRAINTS 300-018 SEWER FORCEMAIN 10% CONTINGENCY LS 1 5,545.00 $ (5,545.00) Total (Decreases) for Code C: $ (14,395.00) Additions: 300-030 8" FORCEMAIN Bypass LS 1 $5,545.00 $ 5,545.00 Total Additions for Code C: $ 5,545.00 Total Net (Decreases)/Additions to Code C: $ (8,850.00) Code D: Decreases: 300-020 UTILITY PIPE, F&I, DI, WATER, 8" LF 100 $125.00 $ (12,500.00) 300-021 UTILITY PIPE, F&I, DI, WATER, 12" LF 20 $160.00 $ (3,200.00) 300-022 UTILITY FITTINGS, F&I, DI, 6" LF 4 $350.00 $ (1,400.00) 300-023 UTILITY FITTINGS, F&I, DI, 8" LF 10 $430.00 8 (4,300.00) 300-024 UTILITY FITTINGS, F&I, DI, 12" LF 8 $733.00 $ (5,864.00) 300-025 UTILITY FITTINGS, F&I, DI, 6" BELL LF 10 i $386.00 $ (3,860.00) RESTRAINTS 300-026 UTILITY FITTINGS, F&I, DI, 8" BELL LF 10 $435.00 $ (4,350.00) RESTRAINTS 300-027 UTILITY FITTINGS, F&I, DI, 12" BELL LF 10 $705.00 $ (7.050.00) RESTRAINTS 300-028 RECLAIMED WATER MAIN 10% CONTINGENCY LS 1 $6,489.00 $ (6,489.00) Total (Decreases) for Code D: $ (49,013.00) Page 4 of 4 Administrative Change Order 1&Final: Island Estates Bridge Replacements ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Increases: 300-019 UTILITY PIPE, F&I, DI, WATER, 6" LF 8 100.00 $ 800.00 Total Increases for Code D: $ 800.00 Total Net (Decreases)/Increases to Code D: $ (48,213.00) Total Net (Decreases)/Increases/Additions to the Contract: $ (400,956.62)