SOLID WASTE TRANSFER STATION REPLACEMENT PROJECT - 15-0007-SW - CONSTRUCTION MANAGER @ RISK SERVICESConstruction Manager @ Risk Services for Solid Waste Transfer Station This CONTRACT made and entered into this --a° day of /JJVlh,.6).-Y, 2017 by and between the City of Clearwater, Florida, a municipal corporation, hereinafter designated as the "City" or "Owner", and Kokolakis Contracting , of Tarpon Springs, County of Pinellas and State of Florida, hereinafter designated as the "Construction Manager". The contracting entities shall collectively be known as the "Parties." WITNESSETH: WHEREAS, the Clearwater City Council has approved using the Construction Manager at Risk approach on appropriate projects as determined by the City's Engineering Department; and WHEREAS, the City desires that the Construction Manager perform the management of the necessary construction, design, and preconstruction services (collectively referred to as the Services) on an as -needed basis subject to the terms and conditions set forth in this agreement and any agreement incorporated into this agreement by reference. NOW, THEREFORE, IT IS AGREED BY THE PARTIES: ARTICLE 1: SCOPE OF WORK AND CONTRACT DOCUMENTS 1.1 The Construction Manager and its successors, assigns, executors or administrators, in consideration of the sums of money, as herein after set forth to be paid by the City to the Construction Manager, shall and will at its own cost and expense perform all labor, furnish all materials, tools and equipment for all individual projects assigned as a result of this contract. 1.2 For each individual project assigned, in accordance with such proposal and technical supplemental specifications and such other special provisions and drawings, if any, which will be submitted by the City, together with any advertisement, instructions to bidders, general conditions, proposal and bond, which may be hereto attached, and any drawings, if any, which may be herein referred to, are hereby made a part of this contract, and all of said work to be performed and completed by the contractor and its successors and assigns shall be fully completed in a good and workmanlike manner to the satisfaction of the City. 1.3 Unless otherwise specified in this contract, all work shall be completed in accordance with Section III and Section IV of the City of Clearwater Contract Specifications (the Specifications). For the purposes of this contract, the term Contractor in Section III shall include the Construction Manager. The Specifications, as may be supplemented and changed, along with this Contract constitute the "Contract Documents." In the event there is any conflict between this Contract and the Specifications, this Contract shall take precedence except that the GMP PROPOSAL dated 10/13/17 (as revised 10/16/17) is expressly incorporated and made part of this Agreement. Further, the GMP Proposal shall be determinative and control in the event of any conflict, discrepancy, absence of information and / or term or condition to the contrary. ARTICLE 2: CONSTRUCTION MANAGER'S DUTIES AND STATUS 2.1 The Construction Manager recognizes the relationship of trust and confidence established between it and the City by this Agreement, and agrees with the City to furnish its best skill and judgment and the overall supervision of its executives; to furnish efficient business administration and superintendence; and to use every effort to keep upon the project site at all times an adequate supply of workforce and materials to secure its execution and completion in the most expeditious and economical manner. 2.2 The Construction Manager represents that it has made a thorough examination of the premises and is thoroughly familiar with the conditions under which it is to work. 2.3 The Construction Manager agrees to perform and complete the Services in accordance with laws, rules, and regulations of all governmental authorities and departments thereof. 2.4 The Construction Manager agrees to cooperate with the City, Architect -Engineer, or any other Design Professional in all respects, including, but not limited to, providing necessary preconstruction services, such as evaluation of methods, availability and costs of the various components of the Services while under design consideration; supervising the Services and the progress thereof; the coordination of the Services and suggesting changes in the Services; and supplying information as to costs and availability of materials and methods of construction in order, amongst other things, to reduce costs wherever the same may be practicably consistent with the quality of the Services presented in the Contract Documents. 2.5 The Construction Manager agrees to the following: a) In connection with the performance of work under this Contract, the Construction Manager agrees not to discriminate against any employee or applicant for employment because of race, sex, religion, color, or national origin. The aforesaid provision shall include, but not be limited to, the following employment: - upgrading - demotion or transfer - recruitment or recruitment advertising - lay-off or termination - rates of pay or other forms of compensation; and - selection for training, including apprenticeship b) The Construction Manager agrees to post hereafter in conspicuous places, available for employees or applicants for employment, notices to be provided by the contracting officer setting forth the provisions of the non-discrimination clause. c) The Construction Manager further agrees to insert the foregoing provisions in all contracts hereunder, including contracts or agreements with labor unions and/or worker's representatives, except sub -contractors for standard commercial supplies or raw materials. 2 ARTICLE 3: SCOPE OF THE SERVICES 3.1 The services that the Construction Manager shall provide include, but are not limited to those described in the following sections. 3.2 Reporting - Written reports shall be provided with the monthly pay requests as follows: a) Monthly Executive Summary which provides an overview of current issues and pending decisions, future developments and expected achievements, and any problems or delays, including code violations found by any permitting agency. b) A Monthly Construction Progress Report that includes a cost narrative, a scheduling narrative and that summarizes the work of the various subcontractors. This report shall include information from the weekly job site meetings as applicable such as: - general conditions - long lead supplies - current deliveries - safety and labor relations programs permits construction problems and recommendations; and - plans for the succeeding month 3.3 Scheduling a) Upon award of this Contract, the Construction Manager shall submit a master project schedule covering the planning and design approvals, construction and Owner occupancy of the Project. This schedule will serve as the framework for the subsequent development of all detailed schedules. The master project schedule shall be produced and updated monthly throughout the project. b) Within thirty (30) days after the date of the Owner's issuance of a Notice to Proceed, the Construction Manager shall prepare and submit to the Owner two copies of a Critical Path Method (CPM) construction schedule graphically depicting the activities contemplated to occur as a necessary incident to performance of the work required to complete the project, showing the sequence in which the Construction Manager proposes for each such activity to occur and duration (dates of commencement and completion, respectively) of each activity. c) Following development and submittal of the construction schedule the Construction Manager shall, at the end of each calendar month during the project, or at such earlier intervals as circumstances may require, update and/or revise the construction schedule to show the actual progress of the work performed and the occurrences of all events which have affected the progress of performance of work already performed or will affect the progress of the performance of the work yet to be performed in contrast with the planned progress of performance of such work, as depicted on the original construction schedule and all updates and/or revisions thereto as reflected in the updated and/or revised construction schedule last submitted prior to submittal of each such monthly update and revision. Each such update and/or revision to the construction schedule shall be submitted to the Owner in duplicate. 3 d) The Construction Manager shall provide current scheduling information and provide direction and coordination regarding milestones, beginning and finishing dates, responsibilities for performance and the relationships of the Construction Manager's work to the work of his subcontractors and suppliers to enable them to perform their respective tasks so that the development of construction progresses in a smooth and efficient manner in conformance with the overall project schedule. The schedule shall include all phases of the construction work, material supplies, long lease procurement, approval of shop drawings, change orders in progress, schedules for change orders, and performance testing requirements. The Construction Manager shall advise the Owner, its representatives and the Architect -Engineer of their required participation in any meeting or inspection giving each at least one week notice unless such notice is made impossible by conditions beyond his control. The Construction Manager shall hold job -site meetings at least once each month with the Construction Team and at least once each week with the subcontractors and the Architect -Engineer's Field Representative, or more frequently as required by work progress, to review progress, discuss problems and their solutions and coordinate future work with all subcontractors. e) Twice per month corresponding as closely as possible with progress review meetings, a "two week" look ahead report shall be prepared and submitted to Owner and Architect / Engineer. 3.4 Design Review and Recommendations a) The Construction Manager shall familiarize himself thoroughly with the evolving architectural, civil, mechanical, plumbing, electrical and structural plans and specifications and shall follow the development of design through Contract Documents. The Construction Manager shall make recommendations with respect to the selection of systems and materials, and cost reducing alternatives including assistance to the Architect - Engineer and Owner in evaluating alternative comparisons versus long term cost effect. The evaluation shall speak to the benefits of the speed of erection and early completion of the project. The Construction Manager shall furnish pertinent information as to the availability of materials and labor that will be required. The Construction Manager shall submit to the Owner and Architect -Engineer such comments as may be appropriate concerning construction, feasibility, and practicality. The Construction Manager shall bring to the Owner and the Architect -Engineer's attention any apparent defects in the design, drawing and specifications, or other documents. The Construction Manager shall prepare an estimate of the construction cost at appropriate milestones during the design and shall evaluate such estimate with the project budget. The Construction Manager shall recommend cost saving alternatives, as appropriate, at each design milestone. At each design milestone the Owner, Architect Engineer and Construction Manager shall conduct a value engineering review. b) After receiving the Construction Documents for each phase of the project, the Construction Manager shall perform a specific review thereof. Promptly after completion of the review, the Construction Manager shall submit to the Owner, with a duplicate to the Architect - Engineer, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as the Construction Manager may deem appropriate, and all actions taken by the Architect -Engineer with respect to same, any comments he may deem to be appropriate with respect to separating the work into separate contracts and/or alternative materials. 4 c) At completion of the Construction Manager's review of the plans and specifications, except only as to specific matters as may be identified by appropriate comments pursuant to this section, the Construction Manager shall warrant, without assuming any architectural or engineering responsibility, that the plans and specifications are consistent, practical, feasible and constructible. The Construction Manager shall warrant that the work described in the plans and specifications for the various bidding packages is constructible within the scheduled construction time. d) The Construction Manager shall review the design for the purpose of identifying long lead procurement items (i.e. machinery, equipment, materials and supplies). When each item is identified, the Construction Manager shall notify the subcontractors, the Owner, and the Architect -Engineer of the required procurement and schedule. Such information shall be included in the bid documents and made a part of all affected sub -contracts. As soon as the Architect -Engineer has completed drawings and technical specifications and the Construction Manager has obtained permitting approval, the Construction Manager shall prepare invitations for bids. The Construction Manager shall keep informed of the progress of the respective subcontractors or suppliers, manufacturing or fabricating such items and advise Project Director, Owner and Architect -Engineer of any problems or prospective delay in delivery. 3.5 Staffing - Key personnel assigned to City projects by the Construction Manager shall not be removed from the project until alternate personnel acceptable to the City are approved in writing by the City. 3.6 Soliciting Bids a) Without assuming responsibilities of the Architect -Engineer, and unless waived in writing by the Owner, the Construction Manager shall prepare invitations for bids, or requests for proposal when applicable, for all procurements of long lead items, materials and services, and for Subcontractor contracts. Such invitations for bids shall be prepared in accordance with the following guidelines: i) Contracts totaling $1,000 but not exceeding $10,000 may be entered into by the Construction Manager with the firm which is qualified and submits the lowest verbal quotation. The Construction Manager shall obtain a minimum of two (2) verbal quotations. These quotations shall be entered on a bid tabulation sheet and a copy of such tabulation sent to the Owner, Architect -Engineer and to each firm. The successful quotation shall be confirmed by written contract or purchase order to the low bid firm defining the scope and quality of work to be provided. ii) Contracts totaling $10,000 but not exceeding $200,000 may be entered into by the Construction Manager with the firm who is qualified and submits the lowest responsive proposal. The Construction Manager shall request at least three (3) firms to submit sealed written proposals based on written drawings and/or specifications. The written proposals shall all be opened publicly at the location, date and time named by the Construction Manager in his request for proposal. A tabulation of the results shall be furnished to the Owner, Architect -Engineer and to each firm. iii) Contracts totaling $200,000 but not exceeding $500,000 may be entered into by the Construction Manager with the firm who is pre -qualified and submits the lowest responsive proposal. The Construction Manager shall advertise these projects at least once with the last advertisement appearing at least 21 calendar days prior to the established bid opening date. These proposals shall be based on approved plans and specifications. Bids shall be received and opened publicly at the location, date and time established in the bid advertisement. iv) Contracts totaling $500,000 or greater shall be treated the same as described under iii above except that the advertisement shall be run for at least 30 days prior to the established bid opening and at least 5 days prior to any scheduled pre-bid conference. v) Individual purchases of materials or rentals or leases of equipment of up to $999.99 each may be made without bids or quotes when reasonably necessary to expedite work on the project; however, the Construction Manager shall not divide or separate a procurement in order to avoid the requirements set forth above. vi) Site utilities may be acquired at market rates from the entity(ies) providing such in the franchise area. b) For each separate construction contract exceeding $35,000, the Construction Manager shall, unless waived by Owner, conduct a pre-bid conference with prospective bidders, the Architect - Engineer and the Owner. In the event questions are raised which require an interpretation of the bidding documents or otherwise indicate a need for clarification or correction of the invitation, the Construction Manager shall transmit these to the Architect -Engineer and upon receiving clarification or correction in writing shall prepare an addendum to the bidding document, and issue same to all of the prospective bidders. 3.7 Quality Control - The Construction Manager shall develop and maintain a program, acceptable to the Owner and Architect -Engineer that assures quality control of the construction. The Construction Manager shall supervise the work of all subcontractors providing instruction to each when their work does not conform to the requirements of the plans and specifications and shall continue to assert influence and control over each subcontractor to ensure that corrections are made in a timely manner so as to not affect the efficient progress of the work. Should disagreement occur between the Construction Manager, the Owner or the Architect -Engineer over acceptability of work and conformance with the requirements of the specifications and plans, the Owner shall be the final judge of performance and acceptability. 3.7 Subcontractor Interfacing - The Construction Manager shall be the single point of interface with all subcontractors for any work done under this Contract. The Construction Manager shall negotiate all change orders, field orders and request for proposals, with all affected subcontractors and shall review the costs of those proposals and advise the Owner and Architect -engineer of their validity and reasonableness, acting in the Owner's best interest prior to requesting approval of each change order from the Owner. Before any work is begun on any change order, a written authorization from the Owner must be issued. When health and safety are threatened, however, the Construction Manager shall act immediately to remove such threat to health and safety. The Construction Manager shall also carefully review all shop drawings and then forward the same to the Architect -Engineer for review and actions. The Architect -Engineer will transmit them back to the Construction Manager who 6 will then issue the shop drawings to the affected subcontractor for fabrication or revision. The Construction Manager shall maintain a record to promote expeditious handling. The Construction Manager shall request the Architect -Engineer to make interpretations of the drawings or specifications requested of him by the subcontractors and shall maintain a record to promote timely response. The Construction Manager shall advise the Owner and Architect - Engineer when timely response is not occurring on any of the above. The Construction Manager shall collect, review and submit to the Owner, all project closeout documentation including operation, maintenance and training manuals. ARTICLE 4: MAXIMUM PROJECT COST AND FEES FOR SERVICES 4.1 Guaranteed Maximum Price for Construction a) When the Construction Documents are sufficiently complete to establish the scope of work for the project or any portion thereof, the Construction Manager will establish and submit in writing to the Owner for his approval a Guaranteed Maximum Price (GMP) guaranteeing the maximum price to the Owner, for the construction cost of the project or designated part thereof. Such Guaranteed Maximum Price will be subject to modification for changes in the project as provided in article 4.1(e) below. Actual price paid for the work by the Owner, however, shall be the actual cost of all work subcontracts, supply contracts, direct labor costs, direct supervision costs and direct job costs, plus the Construction Manager's fees or the GMP, whichever is less when the work is complete. Invoicing shall occur monthly for completed work with 5% retainage withheld until final completion and acceptance of all work covered in the contract documents in accordance to the City's General Conditions. b) At the time of submission of a Guaranteed Maximum Price, the Construction Manager will verify the time schedule for activities and work which were adopted and used to determine the Construction Manager's cost of work. In addition to the cost of work, a GMP will include an agreed upon sum as the construction contingency which is included for the purpose of defraying the expenses due to unforeseen circumstances relating to construction. The Construction Manager will be required to furnish documentation evidencing expenditures charged to the contingency prior to the release of funds by the Owner. If bids are received below the applicable line items in the GMP, the surplus will be added to the contingency. c) If bids are received above the applicable line item in the GMP, the deficiency will be taken from the contingency; however, such occurrence shall not be cause to increase the GMP. d) If bids are not received for a portion of the work at or below the applicable line item amount in the GMP, the Construction Manager reserves the right to perform that portion of the work as acknowledged by the Owner or negotiate for its performance for the specified line item lump sum amount or less. e) The increase or decrease in the Guaranteed Maximum Price resulting from a change in the Project shall be determined in one or more of the following ways: 7 i. By mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation by the Architect Engineer and owner; ii. By unit prices stated in the Agreement or subsequently agreed upon; iii. If none of the methods is agreed upon, the Construction Manager, provided it has received a signed written order by the Owner, shall promptly proceed with the work involved. The cost of such work shall then be determined on the basis of the reasonable expenditures and savings of those performing the work attributed to the change. In the event a Change Order is issued under these conditions, however, the Architect -Engineer will establish an estimated cost of the work and the Construction Manager shall not perform any work whose cost exceeds that estimate without prior written approval by the Owner. In such case, the Construction Manager shall keep and present, in such form as the Owner may prescribe, an itemized accounting together with appropriate supporting data of the increase in the Cost of the Project. The amount of decrease in the Guaranteed Maximum Price to be allowed by the Construction Manager to the Owner for any deletion or change which results in a net decrease in cost will be the amount of the actual net decrease; iv. The Architect -Engineer will have authority to order minor changes in the Project not involving an adjustment in the Guaranteed Maximum Price or an extension of the Construction Completion Date and not inconsistent with the intent of the Drawings and Specifications. Such changes shall be effected by written order. Documentation of changes shall be determined by the Architect -Engineer. Changes shall be approved by the Architect -Engineer. 4.2 Construction Manager's Fee - In consideration of the performance of the contract, the Owner agrees to pay the Construction Manager as compensation for his services, fees as set forth below: a) Preconstruction Phase Fee - shall be based on design costs if applicable, constructability review, value engineering and fee determination of Guaranteed Maximum Price. The fee for this phase in the amount of $99,450 shall be paid at the negotiated price upon receipt of the Guaranteed Maximum Price. b) Construction Phase Fee - Prior to commencement of the Construction Phase, the Owner will direct the Construction Manager in writing to proceed into the Construction Phase. The Construction Manager's compensation for work or service performed during the Construction Phase shall be a fee of $1,069,921. The Construction Phase Fee shall be invoiced and paid in 22 months. Payments will be remitted monthly at the cost of $ 48,632 each and one final monthly payment of $48,649.The first monthly payment shall become due thirty days following the issuance of the first Construction Authorization and the final monthly payment shall be paid only when construction of the project is completed and occupancy of the project accepted by the Owner. If construction is authorized only for a part of the project, the fee paid shall be proportionate to the amount of work authorized by the Owner 8 ARTICLE 5: TERMINATION AND TIME OF THE ESSENCE 5.1 If the Construction Manager is adjudged bankrupt or makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of its insolvency, or if refuses or fails, except in cases for which an extension of time is provided, to supply enough properly skilled workmen or proper materials for the Services, or otherwise be guilty of a substantial violation of any provision of this Agreement as determined by the certificate of the Architect, the Owner may, without prejudice and reserving any other right or remedy the Owner may have, after giving the Construction Manager seven (7) days' written notice, terminate the employment of the Construction Manager and take possession of the premises and all materials, tools, and appliances thereon and finish the Project in whatever manner the Owner may deem expedient. 5.2 It is mutually agreed between the parties hereby that time is of the essence of this contract, and in the event that the Substantial Completion Date is not achieved within the time stipulated herein, it is then further agreed that the City may deduct from such sums or compensation as may be due to the Construction Manager, the sum of $1,000.00 per day for each day that the work to be performed by the Construction Manager remains incomplete beyond the time limit specified herein, which sum of $ 1,000.00 per day shall only and solely represent damages which the City has sustained by reason of the failure of the Construction Manager to complete the work within the time stipulated, it being further agreed that the sum is not to be construed as a penalty but is only to be construed as liquidated damages for failure of the Construction Manager to complete and perform all work within the time period as specified in this contract. ARTICLE 6: INDEMNIFICATION 6.1The Construction Manager and his or its successors and assigns does hereby agree to assume the defense of any legal action which may be brought against the City as a result of the Construction Manager's activities arising out of this contract and furthermore, in consideration of the terms, stipulations and conditions as contained herein, agrees to hold the city free and harmless from any and all claims for damages, costs of suits, judgments or decrees resulting from any claims made under this contract against the city or the contractor or the contractor's sub -contractors, agents, servants or employees resulting from activities by the aforementioned contractor, sub -contractor, agent servants or employees. 6.2 Nothing contained herein shall be construed as a waiver of any immunity from or limitation of liability the City (Owner) may be entitled to under the doctrine of sovereign immunity or section 768.28, Florida Statutes. ARTICLE 7: TITLE TO THE PROJECT 7.1 The title of all work, completed portions of the Project and in the course of construction, and of all materials on account of which payment has been made shall be in the Owner. 9 ARTICLE 8: ASSIGNMENT 8.1 This Agreement shall be binding upon and inure to the benefit of the Parties hereto and their respective successors and assigns, except that this Agreement may not be assigned by either party without the prior written consent of the other party. Any assignment made without such prior written consent shall not vest rights in the assignee. ARTICLE 9: ADDITIONAL PROVISIONS 9.1 This Agreement shall be governed by and construed in accordance with the laws of the State of Florida, and the venue for any dispute under this Agreement shall be an appropriate court of competent jurisdiction in Pinellas County, Florida. 9.2 Any notice required to be given by the terms and provisions of this Agreement or by any law or governmental regulation, either by the Owner or Construction Manager, shall be in writing unless otherwise required by such law or regulation and shall be deemed to have been served and given when deposited in either Registered or Certified Mail in United States Branch Post Office, addressed to the party hereto to whom directed, at the address specified in the Specifications. 9.3 The language in this Agreement shall be construed according to its customary meaning within the Florida building industry. Whenever used, the singular shall include the plural, the plural the singular, and the use of any gender shall be applicable to all genders. 9.4 If any provision of the Contract Documents is invalid or unenforceable as against any person or party, the remainder of the Contract Documents and the applicability of such provision to other persons or parties shall not be affected thereby. 9.5 Nothing contained in this Agreement shall be construed to mean that the Construction Manager and Owner are joint ventures or partners. Public Records Requirements: The successful bidder/contractor will be required to comply with Section 119.0701, Florida Statues (2013), specifically to: (a) Keep and maintain public records that ordinarily and necessarily would be required by the City of Clearwater in order to perform the service; (b) Provide the public with access to public records on the same terms and conditions that the City of Clearwater would provide the records and at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law; (c) Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law; and 10 (d) Meet all requirements for retaining public records and transfer, at no cost, to the City of Clearwater all public records in possession of the contractor upon termination of the contract and destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. All records stored electronically must be provided to the public agency in a format that is compatible with the information technology systems of the City of Clearwater. IN WITNESS WHEREOF, the parties to the agreement have hereunto set their hands and seals and have executed this Agreement, in duplicate, the day and year first above written. CITY OF CLEARWATER IN PINELLAS COUNTY, FLORIDA By: r/I%.IJ 4-4.,, „ 43- 9.444. : William B. Horne II City Manager Countersigned: By: —CkW M1.e r\ci t\4OS George N. Cretekos, Mayor (Contractor must indicate whether Corporation, Partnership, company or Individual) (The person signing shall, in his own handwriting sign the Principal's name, his own name and his title; where the person is signing for a Corporation he must, by Affidavit, show his authority to bind the Corporation). 11 Rosemarie Call, City Clerk Camilo Soto, Assistant City Attorney Corporation Kokolakis Contracting By: c Rod rick Voigt, Vice Pr 0 :' Go:;C • SE 19 • , F10Fee0p' /471i1Ni11111110\\\\ mm 1) R' - BRIGHT AND BEAUTIFUL • BAY TO BEACH Prepared for: City of Clearwater Date: October 13, 2017 REVISED 1:33 pm, Oct 16, 2017 SOLID WASTE TRANSFER STATION REPLACEMENT PROJECT PROJECT NO.: 15 -0007 -SW FINAL GUARANTEED MAXIMUM PRICE 41K KOKOLAKIS Prepared by: Kokolakis Contracting 202 E. Center Street, Tarpon Springs, FL 34689 (727) 942-2211 • www.jkokolakis.com TABLE OF CONTENTS CITY OF CLEARWATER SOLID WASTE TRANSFER STATION REPLACEMENT PROJECT Section One: Section Two: Section Three: Section Four: Section Five: Section Six: Section Seven: Section Eight: CLEC"' R BRIGHT ANI) BEAI.f I IFL'L • BAY TO BEACH Summary of Work GMP Estimate Schedule of Allowances Schedule of Alternates Schedule of DPO Items Clarifications Construction Schedule List of Documents 2 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOK0LAKIS SECTION ONE SUMMARY OF WORK 3 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKIS Summary of Work Preface The projects consist of demolishing the existing waste transfer station to allow for the construction of a new waste transfer station, administration building, new truck scales and scale house. Perm its Kokolakis Contracting, Inc. shall submit plans and specifications to the City of Clearwater Building Department for review. The cost for the plan review fees, NOI permit fees, State Fire Marshal fees and the building permit fee are not included. Coachman Ridge Park The Coachman Ridge Park scope consists of reconfiguring the existing park to enlarge the storm water retention pond for floodplain compensation and wetland mitigation. The excess fill from the Coachman Ridge Park site will be utilized at the Waste Transfer Station site. A pedestrian bridge is included across the retention pond. Additionally, new reconfigured asphalt and concrete walkways are included. Solid Waste Transfer Station Exported fill from the Coachman Ridge Park site will be transported to the Solid Waste Transfer Station site for preloading phase. Preloading consists of filling and compacting the area along the new ramp and monitoring the settlement until the compaction and loading is sufficient for the new construction. This method is anticipated as a six month process. After preloading, the City will vacate the property to allow for reconstruction of the SWTS site. The SWTS will remain closed for the duration of construction. The replacement portion of this project consists of demolition of existing facilities. New 665sf Scale building and scales, New 22,870SF top load Transfer Station building, and a New 1,576SF Administration building. Site Improvements include: New asphalt roadways and parking areas for tractor trailers and employee vehicles, storm water improvements including new box culvert at main entrance. 15,000 -gallon Leachate storage tank, natural gas fueling station for City vehicles. stand-by generator, new water service, fire water main, and diesel -powered fire booster pump system and rerouting of the sanitary and electrical services. Schedule The overall project duration is 22 months. The initial phase involves bringing in fill material for the preloading soil densification process. After all soil is placed. the preloading duration is scheduled for 6 months. During this time, all existing transfer station activities will remain in operation. Upon acceptance of the preloading settlement by the geo-technical engineer. transfer station construction will commence and will require the shut -down of the existing transfer station for approximately 12 months. The anticipated Notice to Proceed with construction is anticipated on or about 1/24/2018, this is based on receiving Board approval 11/2/2017 and issuance of building permits. Site mobilization for both the Coachman Ridge Park site and Solid Waste Transfer Station site is anticipated to begin 1/25/2018. The completion of the Coachman Ridge Park work is anticipated on or about 9/21/2018. Preloading settlement at the Transfer Station site is anticipated to be complete 10/21/2018: this date assumes settlement to be reached within six months. Based on the preloading settlement date above, the anticipated Substantial Completion date for the project is 10/2/2019 and Final Completion is 10/31/2019. End of Section City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price SECTION TWO GMP ESTIMATE 5 Project: Solid Waste Transfer Station Reconstruction Location: 1005 Old Coachman Rd, Clearwater, FL Est. Date: Friday, October 13, 2017 LEED In/al Permit Documents GMP KO KOLAKIS Div. Description Responsibility Total Division 1 General Requirements General Conditions SEE NEXT TAB $1,580,908 01 32 23 Surveying - Site Ferguson Surveyors $68,000 01 32 23 Preloading Monitoring Allowance Allowance $45,000 01 45 29 Material Testing Arehna $74,630 01 54 23 Scaffolding w/ Trades $0 01 79 00 Closeout - Demonstration and Training JKC $2,500 NPDES Permits JKC $750 $0 Division 2 Existing Conditions 02 30 00 Subsurface Ing estigation By Owner $0 02 40 00 Demolition and Structure Moving Crisdel $37,740 02 50 00 Site Work Crisdel $3,534,767 MSE Walls RWH Construction $208,213 Geo -Web Soil Stabilization Allowance Allowance $150,000 Prefabricated Bridge Bridge Builders $173,196 Landscaping Roush $257,022 Landscaping Adjustment Allowance (Zoning) Allowance $15,000 Fencing Bravo Fence $67,916 $0 Division 3 Concrete 03 10 00 Concrete Forming and Accessories In Concrete $0 03 20 00 Concrete Reinforcing In Concrete $0 03 30 00 Cast -in -Place Concrete Ervin Bishop $3,261,478 Termite Treatment In Concrete $0 Dewatering Allowance Allowance $75,000 03 36 60 Chemically Stained Concrete Floor Soutland $8,700 03 60 00 Grouting In Concrete $0 03 80 00 Concrete Topping (Laticrete) Cornerstone $659,143 $0 Division 4 Masonry 04 22 00 Concrete Unit Masonry Ervin Bishop $45,900 04 27 00 Glass Unit Masonry Glass Block Warehot $13,249 $0 $0 Division 5 Metals 05 12 00 Structural Steel Framing Morrow Steel $734,837 05 12 00 Structural Steel In Steel $0 05 12 00 Armor Push Plates In Steel $0 05 21 00 Steel Joist Framing In Steel $0 05 31 00 Steel Decking In Steel $0 6 Project: Solid Waste Transfer Station Reconstruction Location: 1005 Old Coachman Rd, Clearwater, FL Est. Date: Friday, October 13, 2017 Eli)!i n/a I Permit Documents GMP 44K KO KO LAKIS Div. Description Responsibility Total 05 51 00 Aluminum Stairs and Walkway In Steel $0 05 52 00 Aluminum Handrails In Steel $0 05 53 00 Aluminum Gratings In Steel $0 05 53 00 Miscellaneous Steel & Embeds In Steel $0 $0 Division 6 Wood, Plastics, and Composites 06 10 00 Rough Carpentry w/ Trades $0 06 40 00 Cabinets and Countertops Distinct Designs $9,775 $0 Division 7 Thermal and Moisture Protection 07 10 00 Dampproofing and Waterproofing Above All $40,400 07 21 00 Building Insulation w/ Trades $0 07 27 00 Air Barriers In Dampproofing $0 07 53 00 Membrane Roofing Allied Roofing $37,720 07 62 00 Flashing and Sheet Metal In Roofing $0 07 70 00 Roof and Wall Specialties and Accessories In Roofing $0 07 70 00 Roof Curbs for Roof -Top Package HVAC Units w/ HVAC $0 07 70 00 Roof Access Ladders In Steel $0 07 90 00 Joint Protection In Dampproofing $0 $0 Division 8 Openings 08 10 00 Doors and Frames Integrated Doors $66,232 08 33 00 Coiling Doors and Grilles Overhead Door $38,420 08 52 00 Aluminum Windows Countryside Glass $13,167 08 71 00 Hardware In Doors $0 08 80 00 Glazing In Windows $0 08 95 00 Translucent Panel Systems Specified Architectur $76,500 $0 Division 9 Finishes A5.03 Plaster and Gypsum Board Assemblies Cornerstone Lathing $40,020 A2.04 - A3.05 Cement Stucco Cornerstone Lathing $33,450 Tile Allowance Spectra $3,535 Resinous Flooring Allowance $8,310 09 51 00 Acoustical Ceilings Pardee $9,460 09 90 00 Painting and Coating B & G Painting $86,960 $0 Division 10 Specialties 10 14 00 Signage Environmental $963 10 26 00 Wall and Door Protection Watkins $790 10 50 00 Lockers Watkins $3,130 10 52 00 Portable Fire Extinguishers Watkins $875 Project: Location: Est. Date: LEED In/a] Solid Waste Transfer Station Reconstruction 1005 Old Coachman Rd, Clearwater, FL Friday, October 13, 2017 Permit Documents GMP 41K KO KOLAKIS Div. Description Responsibility Total 10 80 00 Toilet Accessories Watkins $4,170 10 80 00 Knox Box JKC $846 $0 Division 11 Equipment (Crane, CNG Station, Pit Brushes) 11 15 00 Knuckleboom Cranes Built -Rite $594,544 11 30 00 CNG Packaged Pump Station Allowance $750,000 Pneumatic Teller System Deleted $0 Pit Brushes JKC/SESCO $11,000 $0 Division 13 Special Construction (Metal Bldg, Leachate Tank, Truck Scales, Operator Booth) 13 12 20 Pre -Engineered Metal Building Fabrication Varco Pruden $762,600 13 21 00 Double Wall Leachate Storage Tank Highland Tank $365,722 13 55 00 Truck Scales FL Industrial Scale $108,983 TBD Operator's Booth Panel Built $70,550 $0 Division 15 Mechanical 15 30 00 Fire Suppression Sprinkler System Cox Fire $245,315 15 18 30 Refrigerant Piping In HVAC $0 15 41 00 Plumbing R Carr Plumbing $215,489 P0.02/P1.01-02 Eyewash and Shower In Plumbing $0 P0.02/P1.01-02 Hose Reels In Plumbing $0 V0.04 Drywell In HVAC $0 15 73 00 HVAC Aircom $264,758 15 95 00 HVAC Systems Testing In HVAC $0 $0 Division 16 Electrical 16 01 00 Electrical All -Phase $1,393,076 16 08 00 Electrical Testing In Electric $0 16 50 00 Lighting In Electric $0 13 10 00 Lightning Protection System In Electric $0 $0 Bare Costs $16,270,709 Contingency CM Fee SUBTOTAL P&P Bond Premium GL Insurance Premium 2014-2015 (factored for 2016) Builders Risk Potential Sales Tax Savings 1.963% $350,000 6.00% $1,069,921 7.96% 0.632% 0.5200% By Owner -0.36% $17,690,629 $112,718 $92,726 $0 ($64.063) TOTAL 8.76% $17,832,0109 8 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price SECTION THREE SCHEDULE OF ALLOWANCES r KOKOLAKIS 9 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price Schedule of Allowances 4NK KOKOLAKIS Allowance Number Description Amount 1 Preloading Monitoring $45,000 2. Dewatering $75,000 3. Resinous Flooring $8,310 4. CNG Packaged Pump Station $750,000 5. Additional Geo -Web Soil Stabilization $150,000 6. Landscaping Adjustment (Zoning) $15,000 End of Section 10 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price SECTION FOUR SCHEDULE OF ALTERNATES .8K KOKOLAKIS 11 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKIS Schedule of Alternates Alternate Number Description Amount 1. Provide small missile impact Kalwall panels in lieu of large missile impact. $(5,300) End of Section 12 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOL_AKIS SECTION FIVE SCHEDULE OF DPO ITEMS 13 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKIS Schedule of Direct Purchase Order (DPO) Items Item # Description 1. Truck Scales 2. Leachate Tank 3 Knuckleboom Cranes 4. CNG Skid Mount Pump Station 5. Fire Pump End of Section 14 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price SECTION SIX CLARIFICATIONS ar< KOKOLAKIS 15 City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price Clarifications and Assumptions esisK KOKOLAKIS Preface The proposal incorporates a number of assumptions regarding the project that further explains the scope, program, or quality of construction. The following are a summary of these assumptions. These assumptions and clarifications take precedence over all contract documents. General Clarifications 1. This proposal is based on: • Interim Report of the Geotechnical Investigation issued by Driggers Engineering Services, Inc., dated September 24, 2014. • Addendum to Interim Report of the Geotechnical Investigation issued by Driggers Engineering Services, Inc., dated October 9, 2015. • Estimate Normal Season High Groundwater Levels, Coachman Ridge Park Test Borings issued by Driggers Engineering Services, Inc., dated December 8, 2015. • Permit drawings and specifications issued by King Engineering Associates, Inc., dated August 11, 2017. • Addendum 01, issued by King Engineering Associates, Inc., dated August 30, 2017. • Addendum 02, issued by King Engineering Associates, Inc., dated September 18, 2017. • Addendum 03, issued by King Engineering Associates, Inc., dated September 27, 2017. The cost for Builder's Risk Insurance and related deductibles for any and all perils, are not included in the contract price. If the Sales Tax Savings Program is implemented; Owner shall purchase and maintain the Builder's Risk Insurance Policy including assuming responsibility for all deductibles throughout the life of the project and will comply with State Procurement Regulations for Owner Purchases. Kokolakis Contracting, Inc. shall be listed as an additional insured on the Builder's Risk Policy and a copy of the policy will be made available on request. If Owner elects not to procure Builder's Risk Insurance for the project, then the Owner will act as the insurer for the protection of both the Owner and Kokolakis Contracting, Inc. and its subcontractors and suppliers. In addition, if Builder's Risk Insurance is not procured, then upon request Owner will execute a standard Hold Harmless Agreement for the benefit of Kokolakis Contracting, Inc. which will confirm that the Owner has assumed the responsibility of all claims which could have been covered by Builder's Risk Insurance and all related deductibles. To maintain cost efficiency, and to pass the savings on to our clients, our general liability is based on estimated volume of annual revenue, and therefore is not calculated nor invoiced as a project specific rate. The rate included within the GMP and agreed to by the parties is 0.52% and shall be invoiced as part of the first pay application. 4. Building Permit and Impact Fee costs of any kind are not included as they are to be paid directly by Owner. Permits associated with Water Management Districts, Florida Department of Environmental Protection (including air quality. water. sanitary sewer, SWPPP, Asbestos Abatement or Lead Abatement) are to be procured by Architect/Engineer or Owner. The cost for NOI and NPDES permits is included. City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price 41K KOKOLAKIS Coordination with local utility providers for new or existing utilities to be facilitated by Architect/Engineer and all pre -construction and post -construction requirements to be listed on Construction Documents. 6. All warranties commence on the date of project substantial completion or beneficial use. 7. The costs contained within the Proposal, unless specifically noted otherwise, are based upon manufacturer's standard listings of colors, finishes, etc. 8. If Owner elects to participate in the Sales Tax Savings Program, materials available for purchase shall exceed $5,000 in value each, savings to accrue to Owner Contingency. The sales tax savings will be credited via deductive change order for all materials purchased within the program. 9. A credit is included in the GMP Estimate for anticipated sales tax savings. This credit is based on the anticipated savings for large ticket items only. The credit will be reconciled at the end of the project and will be adjusted via the DPO change order listed above. Please refer to Section 5 of this GMP for the list of large ticket items that comprise the credit indicated. 10. The costs for temporary power and water use are not included as they will be furnished by the Owner free of charge to the contractor. 11. Electronic copies of record drawings are not included. Two sets of record drawings will be provided to Owner at completion of project indicating all modifications in colored ink. Kokolakis Contracting. Inc. can provide the Architect / Engineer with record documents in a scanned PDF document. CADD or REVIT as-builts are not included. Site survey data is included in AutoCAD as indicated in specification 01720. 12. The costs for Asbestos Surveys, Hazardous Material Surveys or Lead Testing are not included. Lead testing and removal requirements are listed on http://www.epa.gov/lead/. 13. The demolition, abatement, removal or disposal of any contaminated, hazardous materials including but not limited to asbestos, lead, toxic saturated materials as well as any other unforeseen subsurface conditions such as sink holes, radon gas, unsuitable soils and abandoned utilities are not included. Hazardous materials surveys or engineering are excluded as well. 14. Costs for soil compaction, concrete and masonry quality control services, inspections of all structural bolted and welded connections are included. 15. Threshold inspections are not included 16. Payment and Performance Bonds are included. 17. Work hours in accordance with City of Clearwater ordinances and as negotiated with Owner. 18. The aggregate amount of outstanding change directive shall be capped at 25% of the Construction Manager's Fee. City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKIS 19. Unit rates and percentages listed within the contract are agreed to as Lump Sums and are therefore not auditable. 20. The cost to provide a separate trailer with furnishings for the Owner / Engineer on site as indicated in specification 01500, sections D, E, F, G and H is not included. Kokolakis Contracting, Inc. will occupy the scale house during construction and will accommodate meetings and Owner / Engineer site visits within this space. Scope Clarifications 1. An Allowance is included for dewatering during foundation, site utility and leachate tank installation. 2. Laticrete Emery Aggregate Top 400 concrete 2" topping is included as indicated in specification 03350. The cost for the epoxy Drytek primer indicated as an option in specification 03350, section 2.02-F is not included. 3. Detail C/S5.06 is not included as trench drains are included as Zurn drains as indicated in the plumbing schedule which utilizes a different detail. 4. A total of (53) concrete -filled pipe bollards are included at the Waste Transfer Station site. 5. Shop prime and paint finish is not included for the push plates and embeds. 6. Roofing for the Administration and Scale House buildings is included as a Johns Mansville TPO roof system. 7. Roof copings, gutters and downspouts are included as 050 Kynar-finished aluminum. 8. Fluid applied air barrier is included for the exterior wall of the Administration and Scale House buildings. 9. Kalwall translucent wall panels are included as large missile impact panels. An Alternate to reduce the panels to small missile impact is included in the Schedule of Alternates section. 10 Overhead doors are included as a motor operated Series 625 doors manufactured by Overhead Door Corporation. 11. PGT Level D aluminum windows with clear anodized frames are included in lieu of CGI Estate Collection Series 410 windows. 12. Window glass is included as Solarban SB70 clear impact insulated Low E glass. 13. Ceramic tile at the bathroom, shower walls and shower floor is included as Daltile 6" square semi- gloss field tile from manufacturers standard colors. 14. Resinous epoxy floor is included at the bathroom floors in lieu of stained concrete floors. City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKtS 15 Two new truck scales are included. The truck scales are Weigh-tronix BMC -HD -7011 truck scales with factory guard rails. Western Weighing Aurora 45 remote display with pole -mounted 4.5" LED readout, and weigh-tronic XM405 digital indicator. The cost for a desktop or laptop computer is not included. 16 The cost for (2) built -rite model 2100 stationary knuckleboom cranes with remote power units and dual remote operator stations is included. a. The dual controls consist of one manual hydraulic override controls and one electronic control. b. A 21" trash tamping grapple is included. c. A 5 -year maintenance agreement is included. The maintenance agreement includes costs to conduct regular scheduled maintenance intervals. The cost for routine, daily maintenance such as greasing, tightening of fittings & bolts, etc. is not included. Additionally, maintenance agreement does not include damage to the loader or grapple due to neglect or abuse. 17. A pre -assembled control booth is included as manufactured by Panel -Built, Inc. Signed and sealed drawings are included for the pre -assembled room and the staircase. 18. The Transfer Station building is included as a Varco-Pruden pre-engineered metal building. PrisMAX skylights are included. 19. The cost to provide hydraulic calculations and engineered drawings for the fire sprinkler system is included. The fire sprinkler subcontractor shall design a system based on performance specs. 20. The cost to furnish and install a packaged fire pump is included. 21. The pump indicated on sheet P1.01 is included as a Goulds 1AB21HM04 constant pressure 1 -HP booster system. 22. Air conditioning for the control booth is provide as part of the building HVAC system as indicated on sheet V1.01 in lieu of a unit provided as part of the pre -assembled room package. 23. The lightning protection system is included as indicated in specification 13100. 24. CCTV system including head -end equipment, cameras, wiring, and terminations is not included. The conduit raceway system is included to support the cameras where indicated. 25. Fiber optic cables and connections between buildings is not included. This work will be furnished by the Owner. 26. The cost for a pre -fabricated pedestrian bridge at Coachman Ridge Park is included. This bridge is included as manufactured by Bridge Builders USA. Inc. 27 The cost for a temporary leachate tank system is included. 28. Sod is included for pond banks in lieu of hydro seeding. City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KOKOLAKIS 29. An Allowance is included for additional trees that may be required by the Zoning Department. 30. The cost for additional geo-web soil stabilization is included as an Allowance. End of Section City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price SECTION SEVEN CONSTRUCTION SCHEDULE *AK KOKOLAKIS 21 Line Unique Task ID Preconstruction Contract Administration PR -00-0100 Name Duration Start Finish 2017 2018 2019 MA i M i J J r A i S i 0 i N i D i J i FMA i M i J J i A i S i O i N, D i J i F, M i A i M, J i J A r S i 0,a1 113 13 124 105 15 126 117 i7 128 118 19 130 120 ill I1 122 i12 15 126 116 17 128 118 19 130 X20 i10 11 X20 112 13 124 154 14 125 i18 JO X29 X20 110 it r22 0..2 12 103- r14 14 Approval of GMP ld 11/2/2017* 11/2/2017 22 26 30 34 38 42 46 50 54 58 62 66 70 74 78 82 86 90 94 98 102 106 110 114 118 122 126 130 134 138 142 146 150 154 Approval of GMP 2 PR -00-0101 Notice of Award 10d 11/3/2017 11/16/2017 Notice of Award ❑ 3 4 PR -00-0200 PR -00-0201 Performance & Payment Bonds ld 11/17/2017 11/17/2017 Project Insurance Submission ld 11/17/2017 11/17/2017 5 PR -00-0300 Project Permit Review by AHJ 15d 11/17/2017 12/8/2017 Performance & Payment Bonds Project Insurance Submission I Project Permit Review by 003 6 PR -00-0400 Notice to Proceed - Contract Administration ld 11/20/2017 11/20/2017 Notice to Proceed - Contract Administration I 7 PS -00-0100 Building/Project Permit Procurement 30d 12/11/2017 1/23/2018 Building/Project Permit Procurement I I 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27 PS -00-0200 Notice to Proceed - Construction Submittals SM -00-0100 SM -00-0130 SM -00-0151 SM -00-0154 SM -00-0157 SM -00-0160 SM -00-0190 SM -00-0220 SM -00-0250 SM -00-0280 SM -00-0310 SM -00-0340 SM -00-0370 SM -00-0400 Submit PEMB Package - Transfer Bld Submit CMU & Reinforcing Package Submit Concrete Mix Design - Transfer Building Submit Concrete Reinforcing Shops - Transfer Building Submit Structural Steel Shops - Transfer Building Submit Concrete Mix Design - Scale Bld Submit Concrete Reinforcing Shops - Scale Bld Submit Concrete Mix Design - Admin Bld Submit Concrete Reinforcing Shops - Admin Bld Submit Structural Steel Shops - Scale Bld Submit Structural Steel Shops - Admin Bld Submit Roofing System Package - Scale Bld Submit Roofing System Package - Admin Bld ld 1/24/2018 1/24/2018 15d 11/21/2017 12/12/2017 5d 11/21/2017 11/28/2017 5d 11/21/2017 11/28/2017 Notice to Proceed - Construction I Submit PEMB Package - Transfer Bid MI Submit CMU & Reinforcing Package Submit Concrete MS Design - Transfer Building 20d 11/21/2017 12/19/2017 Submit Concrete Reinforcing Shops - Transfer Building 15d 11/21/2017 12/12/2017 5d 11/21/2017 11/28/2017 15(1 11/21/2017 12/12/2017 5d 11/21/2017 11/28/2017 15d 11/21/2017 12/12/2017 15d 11/21/2017 12/12/2017 15d 11/21/2017 12/12/2017 5d 11/21/2017 11/28/2017 5d 11/21/2017 11/28/2017 Submit Structural Steel Shops - Transfer Building Submit Concrete Mix Design - Scale Bld Submit Concrete Reinforcing Shops - Scale Bld - Submit Concrete Mix Design - Admin Bid, Submit Concrete Reinforcing Shops - Admin Bq - Submit Structural Steel Shops - Scale Bid I' Submit Structural Steel Shops - Admin.Old - Submit Roofing System Package - Scale BM Submit Roofing System Package - Admin Old, Submit Stucco Package - Scale Bld 5d 11/21/2017 11/28/2017 Submit Stucco Package • Scale B d I -:)t)-0430 Submit Stucco Package - Admin Bld 5d 11/21/2017 11/28/2017 Submit Stucco Package - MmM'BN, ,M-00-0460 Submit Window/Glazing Package ,M-00-0490 Submit Doors & Frames -M-00-0520 Submit Door Hardware :sM-00-0550 Submit Metal Framing 20d 11/21/2017 12/19/2017 5d 11/21/2017 11/28/2017 15d 11/21/2017 12/12/2017 5d 11/21/2017 11/28/2017 Submit Window/Glazing Package IIIIIII. Submit Doors & Frames I Submit Door Hardware - Submit Metal Framing JK 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement a ° Ciearsvater H _.......„,,..,„...... U........,„,.......„... Run Date: 10/13/ 2017 Page l of 16 Line Unique Uni Task ID q Name Duration Start Finish 2017 2018 2019 M, A M i l 3 1 A S 0 N D, 3 F 1 M A 1 M 3 3 A S i O N 1 D 3 1 F M i A i M i 1 i 3 A i S i 0 i N 03 13 124 105 15 126 117 17 128 Ile 19 130 120 ill 11 122 132 15 126 116 17 128 118 19 130 120.110 11 122 112 13 124 104 14 125 118 18 129 120 0.0 11 122 112 12 123.104.14 c22 ,26 130 134 138 142 146 150 154 158 162 166 170 174 78 182 186 190 194 198 1102 1106 1110 1114 ,118 1122 1126 1130 1134 1138 1142 1146 1150 1154 1 28 SM-00-0580 Submit Gypsum Board Package 5d 11/21/201711/28/2017 Submit Gypsum Board Package I 29 SM-00-0610 Submit Acoustical Ceiling Tile System 5d 11/21/2017 11/28/2017 Submit Acoustical Ceiling Tile System 30 SM-00-0640 Submit Electrical Components & Gear 15d 11/21/2017 12/12/2017 Submit Electrical Components & Gear 31 SM-00-0670 Submit Plumbing System Components 15d 11/21/2017 12/12/2017 Submit Plumbing System Components 32 SM-00-0700 Submit Plumbing Fixtures 15d 11/21/2017 12/12/2017 Submit Plumbing Fixtures mu 33 If SM-00-0730 Submit Ceramic Tile 15d 11/21/2017 12/12/2017 Submit Ceramic Tile El 34 SM-00-0760 Submit Paint Package 5d 11/21/2017 11/28/2017 Submit Paint PackageI 35 SM-00-0790 Submit Duct Shop Drawing Package 5d 11/21/2017 11/28/2017 Submit Duct Shop Drawing Package, 36 SM-00-0820 Submit HVAC Accessories Package 5d 11/21/2017 11/28/2017 Submit HVAC Accessories Package, 37 SM-00-0850 Submit AHU Units 15d 11/21/2017 12/12/2017 Submit AHU Units M 38 SM-00-0880 Submit HVAC Controls System 15d 11/21/2017 12/12/2017 Submit HVAC Contras System ir 39 SM-00-0910 Submit Fire Alarm System 15d 11/21/2017 12/12/2017 Submit Fire Alarm System Er 40 SM-00-0940 Submit CCN & Security System Package 15d 11/21/2017 12/12/2017 Submit CCTV & Security System Package 41 SM-00-0970 Submit Light Fixture Package 15d 11/21/2017 12/12/2017 Submit Light Fixture Package IIE 42 SM-00-1000 Submit Casework Package 15d 11/21/2017 12/12/2017 Submit Casework Package K 43 SM-00-1030 Submit T&B Accessories Package 5d 11/21/2017 11/28/2017 SubmitT&B Accessories Package 44 SM-00-0140 Approve CMU & Reinforcing Package 10d 11/29/2017 12/12/2017 Approve CMU & Reinforcing Package en 45 SM-00-0152 Approve Concrete Mix Design - Transfer Building 10d 11/29/2017 12/12/2017 Approve Concrete Mix Design -Transfer Building 46 SM-00-0170 Approve Concrete Mix Design - Scale Bld 10d 11/29/2017 12/12/2017 Approve Concrete MIS Design - Scale Bld Q 47 SM-00-0230 Approve Concrete Mix Desing - Admin Bld lad 11/29/2017 12/12/2017 Approve Concrete Mix Desing - Admin Bld C 48 SM-00-0350 Approve Roofing System Package - Scale BId 10d 11/29/2017 12/12/2017 Approve Roofing System Package - Scale Bld ❑ 49 SM-00-0380 Approve Roofing System Package - Admin Bld 10d 11/29/2017 12/12/2017 Approve Roofing System Package - Admin Bid Q 50 SM-00-0410 Approve Stucco Package - Scale Bld 10d 11/29/2017 12/12/2017 Approve Stucco Package - Scale Bld Q 51 SM-00-0440 Approve Stucco Package - Admin BId l0d 11/29/2017 12/12/2017 Approve Stucco Package - Admin Bld Q 52 SM-00-0500 Approve Doors & Frame l0d 11/29/2017 12/12/2017 Approve Doors & Frame Q 53 SM-00-0560 Approve Metal Framing l0d 11/29/201712/12/2017 Approve Metal Framing El 54 SM-00-0590 Approve Gypsum Board Package 10d 11/29/2017 12/12/2017 Approve Gypsum Board Package Q 55 SM-00-0620 Approve Acoustical Ceiling Tile System 10d 11/29/2017 12/12/2017 Approve Acoustical Ceiling Tile System 0 56 SM-00-0770 Approve Paint Package 10d 11/29/2017 12/12/2017 Approve Paint Package E 57 SM-00-0800 Approve Duct Shop Drawing Package 10d 11/29/2017 12/12/2017 Approve Duct Shop Drawing Package 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/ 13/2017 Page 2 of 16 Ckarwater Line Uni ue Task ID 9 Name Duration Start Finish 2017 2018 2019 M, A M: 3 J, A 5 O N D: 3 F, M A, M ) J A S, O N, D, J F M, A M J, 3 .A,S, O, N ,13 ,3 ,24 ,15 5 ,26 ,37 17 ,38 158 19 130 120 ,11 ,1 ,22 ,1.2 ,5 126 156 ,7 ,28 ,18 ,9 130 ,30 ,50 ,l ,33 ,12 ,3 ,34 ,54 ,4 ,35 ,58 ,0 ,39 ,20 ,50 ,l R2 A5 ,3 ,33 ,N 01 ,22 26 30 34 38 42 46 150 ,54 58 ,62 ,66 .70 ,74 ,78 ,82 ,86 90 ,94 98 102 1106 ,110 ,114 ,118 122 ,126 ,130 ,134 ,138 1142 1146 :150 154 58 SM -00-0830 Approve HVAC Accessories Package ltd 11/29/2017 12/12/2017 Approve HVAC Accessories Package 59 SM -00-1040 Approve T&B Accessories Package ltd 11/29/2017 12/12/2017 Approve TM Accessories Package ■ 60 SM -00-0110 Approve PEMB Package - Transfer Bld 30d 12/13/2017 1/25/2018 Approve PEMB Package - Transfer Bid - 61 SM -00-0150 Fabricate & Deliver CMU & Reinforcing Package 10d 12/13/2017 12/27/2017 Fabricate & Deliver CMU & Reinforcing Package U 62 SM -00-0153 Fabricate & Deliver Concrete Transfer Building 5d 12/13/2017 12/19/2017 Fabricate & Deliver Concrete Transfer Building, 63 SM -00-0158 Approve Structural Steel Shops - Transfer Building 30d 12/13/2017 1/25/2018 Approve Structural Steel Shops - Transfer Buildhg 64 SM -00-0180 Fabricate & Deliver Concrete - Scale Bld 5d 12/13/2017 12/19/2017 Fabricate & Deliver Concrete - Scale 81d 65 SM -00-0200 Approve Concrete Reinforcing Shops - Scale Bld 30d 12/13/2017 1/25/2018 Approve Concrete Reinforcing Shops - Scale Bld 66 SM -00-0240 Fabricate & Deliver Concrete Mix Design - Admin Bld 5d 12/13/2017 12/19/2017 Fabricate & Deliver Concrete Mix Design - Admin Bld i 67 . SM -00-0260 Approve Concrete Reinforcing Shops - Admin Bld 30d 12/13/2017 1/25/2018 Approve Concrete Reinforcing Shops - Admin BW 68 SM -00-0290 Approve Structural Steel Shops - Scale Old 30d 12/13/2017 1/25/2018 Approve Structural Steel Shops - Scale Bid 69 SM -00-0320 Approve Structural Steel Shops - Admin Bld 30d 12/13/2017 1/25/2018 Approve Structural Steel Shops - Admin Bld _ 70 SM -00-0360 Fabricate & Deliver Roofing System Package - Scale Bld 15d 12/13/2017 1/4/2018 Fabrkate & Deliver Roofing System Package - Scale Bld - 71 SM -00-0390 Fabricate & Deliver Roofing System Package - Admin Bld 15d 12/13/2017 1/4/2018 Fabricate & Deliver Roofing System Package - Admin Bid - 72 SM -00-0420 Fabricate & Deliver Stucco Package - Scale Bld 5d 12/13/2017 12/19/2017 Fabricate & Deliver Stucco Package - Scale 81d 1 73 SSS -00-0450 Fabricate & Deliver Stucco Package - Admin Bld 5d 12/13/2017 12/19/2017 Fabricate & Deliver Stucco Package - Admin Rldit 74 511-00-0510 Fabricate & Deliver Doors & Frames 5d 12/13/2017 12/19/2017 Fabricate & Deliver Doors & Frames 75 SM -00-0530 Approve Door Hardware 30d 12/13/2017 1/25/2018 Approve Door Hardware IIIIII 76 51.1-00-0570 Fabricate & Deliver Metal Framing 5d 12/13/2017 12/19/2017 Fabricate & Deliver Metal Framing 77 51.1-00-0600 Fabricate & Deliver Gypsum Board Package 5d 12/13/2017 12/19/2017 Fabricate & Deliver Gypsum Board Package ro 78 SM -00-0630 Fabricat & Deliver Acoustical Ceiling Tile System 5d 12/13/2017 12/19/2017 Fabricat & Delver Acoustical Ceiling Tile System 0 79 q SM -00-0650 Approve Electical Components & Gear 30d 12/13/2017 1/25/2018 Approve Electical Components & Gear 80 i SM -00-0680 Approve Plumbing System Components 30d 12/13/2017 1/25/2018 Approve Plumbing System Components 81 SM -00-0710 Approve Plumbing Fixtures 30d 12/13/2017 1/25/2018 Approve Plumbing Fixtures 82 ' SM -00-0740 Approve Ceramic Tile 30d 12/13/2017 1/25/2018 Approve Ceramic Tile 1111.1 83 SM -00-0780 Fabricate & Deliver Paint Package 5d 12/13/2017 12/19/2017 Fabricate & Deliver Paint Package 84 SM -00-0810 Fabricate & Deliver Duct Package 5d 12/13/2017 12/19/2017 Fabricate & Deliver Duct Package I 85 SM -00-0840 Fabricate & Deliver HVAC Accessories Package 5d 12/13/2017 12/19/2017 Fabricate & Deliver HVAC Accessories Package, 86 SM -00-0860 Approve AHU Units 30d 12/13/2017 1/25/2018 Approve AHU Untts 87 SM -00-0890 Approve HVAC Controls System 30d 12/13/2017 1/25/2018 Approve HVAC Controls System_ ..K - 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement a ° Ciearsvater U Run Date: 10/13/2017 Page 3 at 16 Line Unique Task ID Name Duration Start Finish 2017 2018 2019 M , A , M , 1 , 1 , A, 5 , O , R , 0 , ) , F , M , A , M , 1 , 1 , A , 5 , 0 , 11 , 0 , 1 , F , M , A , M , ) r 1 , A , S , 0 ,M 113 13 ,24 115 15 126 117 17 128 ,18 ,9 ,30 ,20 ,11 ,1 ,20 112 ,5 ,26 ,16 17 ,28 118 19 130 130 110 ,9 130 112 13 ,24 114 14 ,35 ,18 18 ,39 120 ,10 11 ,20 ,12 12 123 104 14 88 89 90 91 92 SM -00-0920 SM -00-0950 SM -00-0980 SM -00-1010 SM -00-1050 Approve Fire Alarm System Approve CCTV & Security System Package Approve Light Fixture Package Approve Casework Package Fabricate & Deliver T&B Accessories Package 30d 30d 30d 30d 5d 12/13/2017 12/13/2017 12/13/2017 12/13/2017 1/25/2018 ......._ .... 1/25/2018 1/25/2018 1/25/2018 ,22 ,26 30 ,34 ,38 ,42 ,46 ,50 ,54 ,58 ,62 ,66 ,70 .74 ,78 ,82 ,86 ,90 ,94 ,98 ,102 ,106 ,110 ,114 ,118 ,122 ,126 ,130 ,134 ,138 ,142 ,146 ,150 ,154 Approve Fire Alarm System - Approve CCTV & Security System Package - 12/13/2017 12/19/2017 Approve Light Fixture Package Approve Casework Package - Fabricate & Deliver T&B Accessories Padtage 93 94 SM -00-0155 SM -00-0470 Approve Concrete Reinforcing Shops - Trans! , r Building 30d 12/20/2017 Approve Window/Glazing Package 30d 12/20/2017 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 c SM -00-0120 Fabricate & Deliver PEMB Package -Transfer Hid 5M-00-0159 Fabricate & Deliver Structural Steel - Transfer Building • sM-00-0210 Fabricate & Deliver Concrete Reinforcing - Scale Bld SM -00-0270 Fabricate & Deliver Concrete Reinforcing - Admin Bld SM -00-0300 Fabricate & Deliver Structural Steel Shops - Scale Bld SM -00-0330 Fabricate & Deliver Structural Steel Shops - Admin Bld SM -00-0540 Fabricate & Deliver Door Hardware SM -00-0660 Fabricate & Deliver Electrical Components & Gear ',\1-00-0690 Fabricate & Deliver Plumbing System Components SM -00-0720 Fabricate & Deliver Plumbing Fixtures SM -00-0750 Fabricate & Deliver Ceramic Tile SM -00-0870 Fabricate & Deliver AHU Units SM -00-0900 Fabricate & Deliver HVAC Controls System SM -00-0930 Fabricate & Deliver Fire Alarm System SM -00-0960 Fabricate & Deliver CCTV & Security System Package S\t-00-0990 Fabricate & Deliver Light Fixture Package S\1-00-1020 Fabricate & Delivery Casework Package 60d 1/26/2018 2/1/2018 2/1/2018 4/19/2018 Approve Concrete Reinforcing Shops - Transfer Building - Approve Window/Glazing Package - Fabricate & Deliver PEMB Package - Transfer Ski 30d 1/26/2018 3/8/2018 30d 30d 30d 30d 1/26/2018 3/8/2018 Fabricate & Deliver Structural Steel - Transfer Building Fabricate & Deliver Concrete Reinforcing - Scale Bid 1/26/2018 3/8/2018 Fabricate & Deliver Concrete Reinforcing - Admin Glcl 1/26/2018 3/8/2018 Fabricate & Deliver Structural Steel Shops - Scale Bid 1/26/2018 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 30d 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 1/26/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 3/8/2018 Fabricate & Deliver Structural Steel Shops - Admin Old 10 Fabricate & Deliver Door Hardware, Fabricate & Delver Electrical Components & Ge,,, Fabricate & Delver Plumbing System Components - Fabricate & Deliver Plumbing Fixtures - Fabricate & Deliver Ceramic Tile - Fabricate & Deliver AHU Units 11F-1 Fabricate & Deliver HVAC Controls System lirr-1 Fabricate & Deliver Fire Alarm System Fabricate & Deliver CCN & Security System Package Fabricate & Deliver Light Fixture Package Fabricate & Delivery Casework Package NM S\1-00-0156 S\1-00-0480 1'K-00-1000 Fabricate & Deliver Concrete Reinforcing - Transfer Building Fabricate & Deliver Window/Glazing Package Install SWPPP Controls 30d 30d 5d 2/2/2018 2/2/2018 1/25/2018 3/15/2018 3/15/2018 1/31/2018 Fabricate & Deliver Concrete Reinforcing - Transfer Building Fabricate & Deliver Window/Glazing Package Install SWPPP Controls 115 PK -00-1010 Layout Ground Excavation Limits 6d 2/1/2018 2/8/2018 Layout Ground Excavation LJmes, 411K 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement a o ClearWater f - U Run Date: 10/13/2017 Page k f lfi Unique Task ID Name Duration Start Finish 2017 2018 2019 M, A M 1 ] A s O N D ] F, M A, M ] ] A 5, 0 N, D ], F M A M ] ] A S O, NLine ,13 ,3 ,24 ,15 ,5 ,26 07 .7 ,28 0.8 ,9 ,30 ,20 ,11 0. ,22 02, 15 ,26 ,16 0 128 118 19 ,30 20 ,10 0 22 0.2 3 ,24 ,14 ,4 125 118 ,9 ,29 ,20 110 10 ,22 ,12 ,2 ,23 ,14 ,4 ,22 26 ,30 74 ,38 ,42 ,46 ,50 ,54 ,58 ,62 ,66 170 ,74 J78 ,82 ,86 ,90 ,94 ,98 ,102 ,106 ,110 ,114 1118 ,122 ,126 ,130 ,134 ,138 442 1146 1150 ,154 , 116 ! PK -00-1040 117 PK -00-1050 118 PK -00-1060 119 PK -00-1070 Demo Existing Paving Locations 3d 2/1/2018 2/5/2018 Demo Exiting Paving Locations' Owner Removal of Existing Playgrounds 3d 2/1/2018 2/5/2018 Owner Removal of Exiting Playgrounds' Demo Existing Basketball Court 5d 2/1/2018 2/7/2018 Demo Existing Basketball Court 1 Saw Cut and Isolate Existing Limits of Construction 5d 2/1/2018 2/7/2018 Saw Cut and Isolate Existing Limits of Construction, 120 PK -00-1030 Clear and Grubb 20d 2/9/2018 3/8/2018 Clear and Grubb En 121 PK -00-1020 Excavate Si Transport Pre -Loading Fill Materials 25d 3/9/2018 4/12/2018 Excavate 8 Transport Pre -Loading Fill Materials _ 122 PK -00-1080 Shape Ponds 45d 4/13/2018 6/15/2018 Shape Ponds IIIIIIIIIIIIIIIII, 123 124 125 126 PK -00-1090 PK -00-1120 PK -00-1130 PK -00-1160 Install Sidewalks 20d 6/18/2018 7/16/2018 Install Sidewalks MI Restore Manhole Structure 5d 6/18/2018 6/22/2018 Restore Manhole Structure Install New Storm Water Management System 20d 6/18/2018 7/16/2018 Install New Storm Water Management System III Install Irrigation System 30d 6/18/2018 7/30/2018 Install IrrgadonSystem _ 127 PK -00-1100 128 PK -00-1110 Install Trail Systems 20d 7/17/2018 8/13/2018 Install Trail Systems IMI Install Fibermech SOG IOd 7/17/2018 7/30/2018 - Install ermech SOG • Flt 129 PK -00-1140 Install Sod 7d 8/14/2018 8/22/2018 Install Sod ■ 130 PK -00-1101 131 PK -00-1150 Install Boardwalk Install Landscaping 20d 20d 8/23/2018 8/23/2018 9/20/2018 9/20/2018 Install Boardwalk ill. Install Landscaping IIII♦ 132 PK -00-1151 Site 133 SI -00-2020 Completion of Park Install SWPPP Controls ld 5d 9/21/2018 1/25/2018 9/21/2018 1/31/2018 Completion of Park Install SWPPPControls / 134 SI -00-2030 Clear and Grubb 20d 2/1/2018 2/28/2018 Clear and Grubb 135 51-00-2060 136 SI -00-2080 Conduct Selective Site Demo Install Leachate Bypass System 20d 3/1/2018 3/28/2018 Conduct Selective Site Demo 5d 3/1/2018 3/7/2018 Install Leachate Bypass System 137 SI -00-2000 Install Pre -Loading Settlement Plates ld 3/29/2018 3/29/2018 Install Pre -Loading Settlement Plates I 138 SI -00-2010 Preloading Material Settlement 180d 4/13/2018 10/12/2018 Preloading Material Settlement 139 SI -00-0100 140 SI -00-0110 141 SI -00-0120 142 5I-00-0151 143 5I-00-0160 144 SI -00-0170 Install Reclaimed Water Line Install Potable Water Line 15d I5d 10/15/2018 10/15/2018 11/2/2018 Install Reclaimed Water Line MI 11/2/2018 Install Potable Water Line.] Install Sanitary Force Main Line 20d 10/15/2018 11/9/2018 Instal Sanitary Force Main Line= Site Electrical Power 30d 3M 15d 10/15/2018 10/15/201811/26/2018 10/15/2018 11/26/2018 11/2/2018 Site Electrical Power INN Install Fire Water Line Install Fire Water Line - Install Gas Line Install Gas rine r 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement LL ° Clearwater U Run Date: 10/13/2017 Page 5 of 16 on Line Unique Uni Task ID Q Name Duration Start Finish 20172018 2019 M, A M,] 3, A S O N D,] F, M A, M l ] A, S, 0 N, D, 3, F M, A M, 3, 3 A, S 0, N ,13 3 ,24 ,15 ,S ,26 ,17 ,7 ,28 ,18 ,9 30 ,20 At ,1 ,22 ,12 ,5 ,26 ,16 ,7 ,28 ,18 ,9 30 20 ,10 ,l 122 ,52 13 ,24 ,14 ,4 ,25 ,18 18 ,29 ,20 ,10 ,1 122 ,52 ,2 123 114 14 ,22 ,26 ,30 34 138 ,42 ,46 ,50 54 ,58 162 ,66 ,70 c74 178 182 186 190 94 ,98 ,102 ,106 1110 ,114 ,118 ,122 1126 ,130 ,134 ,138 ,142 ,146 ,150 ,154 , 145 146 147 SI -00-0180 SI -00-0190 SI -00-2040 Install Concrete Headwall No. 1 20d 20d 15d 10/15/2018 10/15/2018 10/15/2018 11/9/2018 11/9/2018 11/2/2018 Install Concrete Headwall No. 1 MI Install Concrete Headwall No. 2 MI Install Concrete Headwall No. 2 Demo existing Transfer Station.. Demo Existing Transfer Station 148 SI -00-0130 Install Steel Casing for Reclaimed Water Line 5d 11/5/2018 11/9/2018 Install Steel Casing for Reclaimed Water Line Install Steel Casing for Potable Water Line, 149 SI -00-0140 Install Steel Casing for Potable Water Line 5d 11/5/2018 11/9/2018 150 SI -00-0150 Install Steel Casing for Gas Line 5d 11/5/2018 11/9/2018 Install Steel Casing for Gas Line Install Irrigation System 20d 11/5/2018 12/3/2018 Install Irrigation System= 151 SI -00-2008 152 5I-00-2012 Install Leachate Storage System 20d 11/12/2018 12/10/2018 Install Leachate Storage System MI 153 5I-00-0171 Set Site Light Pole Bases 7d 11/27/2018 12/5/2018 Set Site Light Pole Bases i 154 5I-00-2003 Install Bahia Sod Main Site 10d 12/4/2018 12/17/2018 Install Baha Sod Mao Site. Install Landscaping. 155 SI -00-2004 Install Landscaping 15d 12/4/2018 12/24/2018 156 5I-00-0172 Roughin Light Pole Bases 5d 12/6/2018 12/12/2018 Roughen Light Pole Bases® 157 5I-00-0173 Set Site Light Poles 3d 12/13/2018 12/17/2018 Set Site Light Poles II 158 159 SI -00-2051 SI -00-2052 Install Site Bollards 10d 5/20/2019 6/3/2019 Install Site Bollards. Install Guard Railing System 20d 5/20/2019 6/17/2019 Install Guard Railing System ME 160 SI -00-2009 Install Site Retaining Wall Assembly 15d 8/9/2019 8/29/2019 Install Site Retaining Wall Assembly. 161 SI -00-2005 Asphalt Paving 5d 8/30/2019 9/6/2019 Asphalt Paving, 162 163 164 165 5I-00-2050 SI -00-2002 SI -00-2006 SI -00-2007 Demo Existing Scale House Install Geoweb Pavement Markings Traffic Control Signage 3d 5d 2d 2d 9/9/2019 9/9/2019 9/9/2019 9/9/2019 9/11/2019 Demo existing Scale House 9/13/2019 9/10/2019 Install Geoweb I Pavement Markings 9/10/2019 Traffic Control Signage I 166 SI -00-2001 Transfer Building 167 TB -00-2070 Install Bahia Sod Entry Transfer Building Footprint Preparation 2d 5d 9/16/2019 11/5/2018 9/17/2019 11/9/2018 Install Bahia Sod Entry '0 Transfer Building Footprint Preparation 168 TB -00-0100 Form SOGCL8-7 2d 11/12/2018 11/13/2018 Fawn SOG CL8a1 169 TB -00-0110 Soil Treat SOG 8-7 ld 11/14/2018 11/14/2018 sal Treat SOG 8-71 170 TB -00-0120 Reinforce SOG CL 8-7 5d 11/15/201811/21/2018 Reinforce SOG CL 8-71 171 TB -00-0130 Place SOG CL 8-7 ld 11/23/2018 11/23/2018 Place SOG CL 8-71 172 TB -00-0140 Form SOG CL 7-6 2d 11/26/201811/27/2018 Form SOG CL 7-61 173 TB -00-0150 SoilTreatSOG7-6 ld 11/28/201811/28/2018 Soil TreatSOG7-61 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement a ° ciearwater r F- U Run Date: 10/ 13/ 2017 Page 6 of 16 Line Unique Task ID Name Duration Start Finish 2017 20182019 M, A M, 3 3, A S, O, N D, 3 F, M A, M 3, 3 A, S, O N, D, 3, F M, A M, 3, 3 A, 5 0, N 13 ,3 124 115 ,5 ,26 17 ,7 ,28 ,18 19 ,50 ,20 ,11 ,1 ,22 ,52 ,5 ,26 ,16 ,7 ,28 ,18 ,9 ,30 ,20 ,10 ,1 ,22 0.2 ,1 X11 ,14 19 125 ,18 ,Q 129 120 110 11 ,22 ,12 ,2 ,23 ,14 ,4 ,22 ,26 ,30 ,34 ,38 42 ,46 ,50 ,54 ,58 ,62 ,66 ,70 ,74 ,78 ,82 ,86 ,90 ,94 ,98 J02 ,106 ,110 0.14 ,118 0.22 ,126 ,130 ,134 1138 ,142 ,146 ,150 ,154 , 174 TB -00-0160 Reinforce SOG 7-6 5d 11/29/2018 12/5/2018 Reinforce SOG 7-61 175 TB -00-0170 Place SOG 7-6 1d 12/6/2018 12/6/2018 Place 506 7-61 176 TB -00-0180 Form SOG CL 6-5 2d 12/7/2018 12/10/2018 Form SOG CL 6-5 177 TB -00-0190 Soil Treat SOG 6-5 ld 12/11/2018 12/11/2018 Soil Treat SOG 6-51 178 TB -00-0200 Reinforce SOG 6-5 5d 12/12/2018 12/18/2018 Reinforce SOG 6-5! 179 TB -00-0210 Place SOG 6-5 ld 12/19/2018 12/19/2018 Place 506 6-51 180 TB -00-0220 Form SOG 5-4 2d 12/20/201812/21/2018 Form SOG 54 181 TB -00-0230 Soil Treat SOG 5-4 ld 12/24/2018 12/24/2018 Soil Treat SOG 541 182 1 TB -00-0240 Reinforce SOG 5-4 5d 12/26/2018 1/2/2019 Reinforce SOG 541 183 TB -00-0250 Place SOG 5-4 ld 1/3/2019 1/3/2019 Place SOG 5-41 184 TB -00-0260 Form SOG 4-3 2d 1/4/2019 1/7/2019 Form SOG 4-31 185 TB -00-0270 Soil Treat SOG 4-3 Id 1/8/2019 1/8/2019 Soil Treat SOG 4-31 186 TB -00-0280 Reinforce SOG 4-3 5d 1/9/2019 1/15/2019 Reinforce 5064-31 187 TB -00-0290 Place SOG 4-3 ld 1/16/2019 1/16/2019 PlaceSoG4-31 188 189 TB -00-0300 TB -00-0530 Form SOG 3-2 Form Columns C 1 at Ground Floor 2d 5d 1/17/2019 1/17/2019 1/18/2019 1/23/2019 Form SOG 3-21 Form Columns C 1 at Ground Floor 1 190 191 TB -00-0310 TB -00-0770 Soil Treat SOG 3-2 Install Trench Drain No.1 at Tunnel ld 2d 1/21/2019 1/21/2019 1/21/2019 1/22/2019 Soil Treat SOG 3-21 Install Trench Drain No. 1 at Tunnel' 192 TB -00-0320 Reinforce SOG 3-2 5d 1/22/2019 1/28/2019 Reinforce SOG 3-2 1 193 113-00-0540 Reinforce Columns C 1 at Ground Floor 12d 1/24/2019 2/8/2019 Rehforce Columns C 1 at Ground Floor N 194 TB -00-0330 Place SOG 3-2 ld 1/29/2019 1/29/2019 Ptace SOG 3-21 195 TB -00-0340 Form SOG 2-1 2d 1/30/2019 1/31/2019 Form SOG 2-1 196 197 TB -00-0350 TB -00-0780 Soil Treat SOG 2-1 Install Trench Drain No. 2 at Tunnel ld 2d 2/1/2019 2/1/2019 2/1/2019 2/4/2019 Soil Treat 50G2 -1l Instal Trench Drain No. 2 at Tunnel 198 1 TB -00-0360 Reinfoce SOG 2-1 5d 2/4/2019 2/8/2019 Reinfoce SOG 2-11 199 200 TB -00-0370 TB -00-0550 Place SOG 2-1 Place Columns Cl at Ground Floor ld 3d 2/11/2019 2/11/2019 2/11/2019 2/13/2019 PlaceSOG2-1l Place Columns C 1 at Ground Floor 8 201 202 203 TB -00-0380 TB -00-0410 TB -00-0440 Form CIP Walls along CL 8 Form OP Walls along CL 3 Form OP Walls along CL 1 5d 5d 5d 2/12/2019 2/12/2019 2/12/2019 2/18/2019 2/18/2019 2/18/2019 Form CIP Walls along CL 81 Form CIP Walk along CL 31 Form CIP Walls along CL 1® 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/13/ 2017 Page 7ol 16 : Clearwater Line Unique Task ID Name Duration Start Finish 2017 2018 2019 M, A, M 3, 3 A S, O, N, D, 3, F, M, A, M 3 3 0 A 0 S 0 O, N, D 0 3, PM, A, M 1 3 A, S, O ,N 013 13 124 015 06 R6 57 7 128 ,18 ,9 ,30 ,20 ,11 11 022 012 ,5 126 ,16 7 ,28. X18 ,9 ,30 R0 010 ,1 ,25 ,R 03 R4 54 04 25 018 ,8 ,29 20 ,30 ,1 ,22 ,12 ,2 ,53 ,22 26 030 034 038 042 ,46 50 ,54 ,58 62 066 070 074 78 082 ,86 090 94 098 0102 ,106 ,110 ,114 ,118 ,122 126 130 ,134 138 ,142 ,146 0.50 0.54 204 TB -00-0560 205 TB -00-0590 Form Columns C 2 at Ground Floor 3d 2/12/2019 2/14/2019 Form Columns C 3 at Ground Floor 3d 2/12/2019 2/14/2019 Form Columns C 2 at Ground Floor Form Columns C 3 at Ground Floor I 206 TB -00-0570 Reinforce Columns C 2 at Ground Floor 3d 2/15/2019 2/19/2019 207 TB -00-0600 Reinforce Columns C 3 at Ground Floor 3d 2/15/2019 2/19/2019 Reinforce Columns C 2 at Ground Floor Reinforce Columns C 3 at Ground Floor 208 TB -00-0390 209 TB -00-0420 210 TB -00-0450 Reinforce CIP Walls along CL 8 5d 2/19/2019 2/25/2019 Reinforce CII' Walls along CL 3 Reinforce CIP Walls along CL 1 5d 2/19/2019 2/25/2019 5d 2/19/2019 2/25/2019 Reinforce CIP Walls along CL 8 Reinforce CIP Walls along CL 3 0 Reinforce CIP Walls along CL 1 Q 211 TB -00-0580 212 TB -00-0610 Place Columns C 2 at Ground Floor Place Columns C 3 at Ground Floor 2d 2/20/2019 2/21/2019 2d 2/20/2019 2/21/2019 Place Columns C 2 at Ground Floor I Place Columns C 3 at Ground Floor I 213 TB -00-0400 214 TB -00-0430 215 TB -00-0460 Place CII' Walls along CL 8 Place CIP Walls along CL 3 Place CIP Walls along CL 1 ld 2/26/2019 2/26/2019 ld 2/26/2019 2/26/2019 ld 2/26/2019 2/26/2019 Place CIP Walk along CL s Place CIP Walls along CL 31 Pace CIP Walk along CL 11 216 TB -00-0611 Form and Shore Tipping Floor Beams lid 2/27/2019 3/12/2019 Form and Shore Tipping Floor Beams III 217 TB -00-0612 219 TB -00-0614 220 TB -00-0615 Reinforce Tipping Floor Beams Place Tipping Floor Beams Install Composite Steel Beam Assemblies at Tipping Floor Form Tipping Floor Slab 8-7 10d 3d 5d 3/13/2019 3/27/2019 4/1/2019 3/26/2019 3/29/2019 4/5/2019 2d 4/1/2019 4/2/2019 Reinforce Tipping Floor Beams® Place Tipping Floor Beams I Install Composite Steel Beam Assemblies at Tipping Floor 11 Form lipping Floor Slab 8-71 221 TB -00-0616 Reinforce Tipping Floor Slab 8-7 5d 4/3/2019 4/9/2019 Reinforce Tipping Floor Slab 8-71 222 TB -00-1109 Form Leachate Drain Trench at Tipping Floor 2d 4/10/2019 4/11/2019 Form Leachate Drain Trench at Tipping Floor! 223 TB -00-1119 Place Leachate Drain Trench at Tipping Floor 2d 4/12/2019 4/15/2019 Place Leachate Drain Trends at Tipping Floor! 224 TB -00-0617 225 TB -00-0760 Place Tipping Floor Slab 8-7 Install Leachate Line at Tipping Floor ld 4/16/2019 4/16/2019 5d 4/16/2019 4/22/2019 Place Tipping Floor Slab 8-71 Install Leachate Line at Tipping Floor 1 226 TB -00-0618 Form Tipping Floor Slab 7-6 2d 4/17/2019 4/18/2019 Form Tipping Floor Slab 7-6 1 227 TB -00-0619 Reinforce Tipping Floor Slab 7-6 5d 4/19/2019 4/25/2019 Reinforce Tipping Floor Slab 7-611 228 TB -00-0629 Place Tipping Floor Slab 7-6 ld 4/26/2019 4/26/2019 Place Tipping Floor Slab 7-61 229 TB -00-0639 Form Tipping Floor Slab 6-5 2d 4/29/2019 4/30/2019 Fonn Tipping Floor Slab 6-5 I 230 TB -00-0649 Reinforce Tipping Floor Slab 6-5 5d 5/1/2019 5/7/2019 Reinforce Tipping Floor Slab 6-5, 231 TB -00-0659 Place Tipping Floor Slab 6-5 ld 5/8/2019 5/8/2019 Place Tipping Floor Slab 6-51 232 TB -00-0669 Form Tipping Floor Slab 5-4 2d 5/9/2019 5/10/2019 Form Tipping Floor Slab 5-41 233 TB -00-0679 Reinforce Tipping Floor Slab 5-4 5d 5/13/2019 5/17/2019 Reinforce Tipping Floor Slab 5-4 r 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement in. ° I.iearwater F 0 Run Date: 10/13/2017 Page 8 of 16 Line Unique Task ID Name Duration Start Finish 2017 2018 2019 M 1 A 1 M 1 3 1 3 1 A 1 S 1 0 1 R 1 D, 3 1 F 1 M, A 1 M 1 3 1 3 1 A 1 S 0 1 R 1 D 1 3 1 F 1 M 1 A 1 M i 3 1 3 A 1 5 1 0 16 113 13 124 115 18 126 ill 17 28 118 19 130 120 ill ,1 122 112 19 126 116 17 128 118 19 130 120 130 11 122 11213 124 114 14 125 118 18 129 ,20 ,10,11 122 112 12 123 114 14 122 26 130 34 ,38 142 46 150 154 158 62 166 70 174 178 182 186 190 194 198 1102 1106 ,110 1114 1118 ,122 1126 1130 1134 1138 1142 1146 150 1154 234 ■ TB -00-0689 Place Tipping Floor Slab 5-4 ld 5/20/2019 5/20/2019 Place Tipping Floor Slab 5-41 235 ■ TB -00-0699 Form Tipping Floor Slab 4-3 2d 5/21/2019 5/22/2019 Form Tipping Floor Slab 4-31 236 ■ TB -00-0709 Reinforce Tipping Floor Slab 4-3 5d 5/23/2019 5/30/2019 Reinforce Tipping Floor Slab 4.31 237 ■ TB -00-0719 Place Tipping Floor Slab 4-3 ld 5/31/2019 5/31/2019 Place Tipping Floor Slab 4.31 238 ■ TB -00-0729 Form Tipping Floor Slab 3-2 2d 6/3/2019 6/4/2019 Form Tipping Floor Slab 3-21 239 ■ TB -00-0739 Reinforce Tipping Floor Slab 3-2 5d 6/5/2019 6/11/2019 Reinforce Tipping Floor Slab 3-21 240 ■ TB -00-0749 Place Tipping Floor Slab 3-2 ld 6/12/2019 6/12/2019 Place Tipping Floor Slab 3-21 241 ■ TB -00-0759 Form Tipping Floor Slab 2-1 2d 6/13/2019 6/14/2019 Form Tipping Floor Slab 2-11 242 TB -00-0769 243 TB -00-0790 Reinforce Tipping Floor Slab 2-1 Erection Composite Steel Beams 5d 5d 6/17/2019 6/21/2019 6/17/2019 6/21/2019 Reinforce Tipping Floor Slab 2-111 Erection Composite Steel Beams 0 244 ■ TB -00-0779 Place Tipping Floor Slab 2-1 ld 6/24/2019 6/24/2019 Place lipping Floor Slab 2-11 245 246 2244 249 250 251 252 253 254 255 256 257 TB -00-0799 TB -00-0829 TB -00-0869 TB -00-0909 8-00-1079 I 3-00-1129 IB -00-1179 TB -00-1199 TB -00-1219 TB -00-1239 TB -00-1359 TB -00-0800 TB -00-0821 Form CIP Walls Along CL 8 at Tipping Floor 2d 6/25/2019 6/26/2019 Form QP Walls Along CL 8 at Tipping Flour! Form CIP Walls Along Row A at Tipping Floor Form CIP Walls Along Row F at Tipping Floor 2d 6/25/2019 6/26/2019 Form QP Walls Along Row A at Tipping Floor! 2d 6/25/2019 6/26/2019 Form QP Walls Along Row F at Tipping Floor! Form CII' Walls at CL 3-2 at Tipping Floor 2d 6/25/2019 Install Door Frames Electrical R/I at Ground Floor F/A Roughin at Ground Floor CCTV Roughin at Ground Floor Plumbing Roughin at Ground Floor Fire Sprinkler System at Ground Floor Roughin Traffic Control System Form Crane Pedestals Install Pit Brushes 258 259 260 261 262 TB -00-0809 Reinforce CIP Walls along CL 8 at Tipping Floor TB -00-0839 Reinforce CIP Walls Along Row A at Tipping Floor TB -00-0879 TB -00-0919 Reinforce CIP Walls at CL3-2 at Tipping Floor TB -00-0810 Reinforce Crane Pedestals Reinforce CIP Walls Along Row F at Tipping Floor 5d 6/25/2019 15d 6/25/2019 5d 6/25/2019 5d 6/25/2019 15d 6/25/2019 15d 6/25/2019 3d 6/25/2019 2d 6/25/2019 3d 6/25/2019 3d 3d 6/27/2019 6/27/2019 6/26/2019 7/1/2019 7/16/2019 7/1/2019 7/1/2019 7/16/2019 7/16/2019 6/27/2019 6/26/2019 6/27/2019 Form QP Walls at CL 3-2 at Tipping Floor! Install Door Frames 0 Electrical R/I at Ground Floor 0 F/A Roughin at Ground Floor Q CCTV Roughin at Ground Floor 0 Plumbing Roughin at Ground Floor Fire Spdnlder System at Ground Floor Roughin Traffic Control System 0 Farm Crane Pedestals 1 Install Pit Brushes 0 7/1/2019 7/1/2019 Reinforce QP Walk along CL 8 at Tipping Floor Reinforce QP Walk Along Row A at Tipping Floor 3d 6/27/2019 7/1/2019 Reinforce QP Walls Along Row F at Tipping Floor! 3d 6/27/2019 7/1/2019 3d 6/27/2019 7/1/2019 263 p TB -00-1369 Install Traffic Control Lighting 7d 6/28/2019 7/9/2019 Reinforce CIP Waw at CL3-2 at Tipping Floor! Reinforce Crane Pedestals Q Install Traffic Control Lighting ..sx 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement u. u. 11e arwater ? h U Run Date: 10/13/2017 Page 16 Line Unique Task ID Name Duration Start Finish 2017 2018 2019 A M 1 S N D 3 F M 6 1 A O D J F M A M 30 ] A s 04 N j 4 5 51 6 7 7A 8 8 9 O 0 6 6 7M 8 8 9 0 0 0 2 4 4 8 9 3 22 26 30 34 38 42 46 50 54 58 62 66 70 74 78 82 86 90 94 98 102 106 110 114 118 122 126 130 134 138 142 146 150 154 264 265 266 267 268 269 270 271 : TB -00-0819 TB -00-0859 TB -00-0899 { TB -00-0920 TB -00-1089 % TB -00-1180 ! TB -00-1200 ` TB -00-0820 Place CIP Walls along CL 8 at Tipping Floor Place CIP Walls Along Row A at Tipping Floor ld ld 7/2/2019 7/2/2019 7/2/2019 7/2/2019 7/2/2019 Place CIP Walls along CL 8 at Tipping Floor Place QP Walls Along Row A at Tipping Floor Place CIF Walls Along Row F at Tipping Floor ld 7/2/2019 Place QP Walls Along Row F at Tipping Flood Place CIP Walls at CL3-2 at Tipping Floor Id 7/2/2019 7/2/2019 Place QP Wats at C13-2 at llpping Floor! Install Doors 3d 7/2/2019 7/5/2019 Install Doors 1 F/A Trim Out at Ground Floor 5d 7/2/2019 7/9/2019 F/A Trim Out at Ground Floor CCTV Trim Out at Ground Floor 5d 7/2/2019 7/9/2019 ccry Trim Out at Ground Roar Place Crane Pedestals ld 7/2/2019 7/2/2019 Place Crane Pedestals! 272 TB -00-0640 Erect PEMB Columns 1Od 7/3/2019 7/17/2019 Erect PEMB Columns 273 " TB -00-1099 Install Hardware 2d 7/8/2019 7/9/2019 Install Hardware' 274 TB -00-1249 Fire Sprinkler System at Tipping Floor 20d 7/15/2019 8/9/2019 Fre Sprinkler System at Tipping Floor 1-7 275 276 TB -00-1349 Install Hose Reel Assemblies at Ground Floor 3d 7/17/2019 7/19/2019 Instal Hose Reel Assemblies at Ground Floor Q TB -00-1389 Install Truck Loading Ventilation Control Panel 2d 7/17/2019 7/18/2019 Install Truk Loading Ventilation Control Panel 8 277 278 279 280 281 ! TB -00-1139 Electrical R/I at Tipping Floor 15d 7/18/2019 8/7/2019 Electrical R/I at Tipping Floor Q Electrical Gear Installation Plumbing Roughin at Tipping Floor TB -00-1149 1 TB -00-1229 TB -00-0650 TB -00-0660 Electrical Gear Installation Plumbing Roughin at Tipping Floor 15d 10d 4d 7d 7/18/2019 7/18/2019 7/18/2019 7/18/2019 8/7/2019 7/31/2019 7/23/2019 7/26/2019 Erect PEMB Girts Erect PEMB Girts 0 Erect PEMB Puriins❑ Erect PEMB Purlins 282 TB -00-1329 Install Eye Wash Stations at Tipping Floor 5d 7/25/2019 7/31/2019 Install Eye Wash Stations at Tipping Floor 0 283 284 285 286 ! TB -00-0849 TB -00-0889 TB -00-0929 TB -00-0670 Install Wall Plating at CIP Walls Along Row A at Tipping Floor Install Wall Plating at CIP Walls Along Row F at Tipping Floor Install Wall Plating at CIP Walls at CL3-2 at Tipping Floor Install PEMB Roof Panels 10d 10d 10d 10d 7/29/2019 7/29/2019 8/9/2019 8/9/2019 Install Wall Plating at CIP Walk Along Row A at lipping Floor 0 Install Wall Plating at QP Walk Along Row F at Tipping Floor D 7/29/2019 7/29/2019 8/9/2019 8/9/2019 Install Wall Plating at CIP Walk at CL3-2 at Tipping Floor ❑ Instal PEMB Roof Panels 0 287 TB -00-0830 Install Knuckle Boom Cranes 10d 7/31/2019 8/13/2019 Install Knuckle Boom Cranes D 288 289 290 TB -00-1339 TB -00-0740 TB -00-0750 Install Hose Reel Assemblies at Tipping Floor Install Reclaimed Water Line at Tipping Floor 5d 5d 8/1/2019 8/1/2019 8/7/2019 8/7/2019 Install Hose Reel Assemblies at Tipping Floor Q Install Reclaimed Water Line at Tipping Floor Q Install Potable Water Line at Tipping Floor Q Install Potable Water Line at Tipping Floor 5d 8/1/2019 8/7/2019 291 292 TB -00-1209 TB -00-1279 CCTV Roughin at Tipping Floor 5d 8/5/2019 8/9/2019 CCN Roughin at Tipping Floor Q Install Exhaust Fans at Ground Floor 5d 8/5/2019 8/9/2019 Instal Exhaust Fans at Ground Floor 0 293 TB -00-1299 Electrical Trim Out Ground Floor 5d 8/8/2019 8/14/2019 Electrical Trim Out Ground Floor .J�C 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/13/2017 Page 10 of 16 : Clearwater 31 Line Uni ue Task ID 9 Name Duration Start Finish 2017 2018 2019 M. A M. J J, A S O, N D,] F. M A. M ] ] A S. 0 N, D. 1, F M A M. J. J A. S O. N ,13 .3 ,24 ,15 ,5 .26 ,17 .7 ,28 ,38 .9 ,30 .20 .11 .I .22 .32 .5 .26 .16 .7 .28 .38 .9 .30 .20 .10 .t 122 ,32 ,3 ,24 ,14 .9 ,25 .18 .8 .29 .20 .30 ,3 .22 .32 ,2 .23 .34 .9 ,22 .26 ,30 .34 .38 ,42 ,46 .50 .54 ,58 .62 .66 .70 74 .78 .82 .86 .90 .94 .98 102 ,106 .110 .114 ,118 .122 .126 ,130 .134 .138 ,142 ,146 ,150 .154 , 294 295 TB -00-1309 TB -00-1379 Electrical Trim Out Tipping Floor 7d 8/8/2019 8/16/2019 Electrical Trim Out Tipping Floor ❑ Install Tipping Floor Ventilation Control Panel 2d 8/8/2019 8/9/2019 Install Tgping Floor Ventilation Control Panel V 296 297 298 299 300 301 302 303 304 305 TB -00-0789 TB -00-1059 TB -00-1159 TB -00-1169 TB -00-1189 TB -00-1210 11-00-1259 Place 2" Tipping Floor Topping 2d 8/12/2019 8/13/2019 Place 2" Tipping Floor Topping Q Install Controller Booth Glazing Panel Assembly 5d 8/12/2019 8/16/2019 Install Controller Booth Glazing Panel Assembly Q Install Light Fixtures Ground Floor 10d 8/12/2019 8/23/2019 Install Llght Fixtures Ground Floor ❑ Install Light Fixtures Tipping Floor 7d 8/12/2019 8/20/2019 Install Light Fixtures Tipping Floor 0 F/ A Roughin at Tipping Floor 5d 8/12/2019 8/16/2019 F/A Roughen at Tipping Floor 0 CCTV Trim Out at Tipping Floor 5d 8/12/2019 8/16/2019 CCN Trim Out at -Duping Floor 0 Install Exhaust Fans at Tipping Floor 4d 8/12/2019 8/15/2019 Install Exhaust Fans at Tipping Floor Q -IB-00-1269 1B-00-1289 TB -00-0680 Install Supply Fans at Tipping Floor 4d 8/12/2019 8/15/2019 Install Supply Fans at Tipping Floor 0 Install Supply Fans at Ground Floor 5d 8/12/2019 8/16/2019 Install Supply Fans at Ground Floor 0 Install PEMB Wall Panels 14d 8/12/2019 8/29/2019 Install PEMB Wall Panels0 306 307 308 TB -00-0969 TB -00-1181 TB -00-1399 Install Controller Booth Stair and Rail Assembly 5d 8/19/2019 8/23/2019 8/23/2019 Install Controller Booth Stair and Rail Assembly F/A Trim Out at Tipping Floor 5d 8/19/2019 F/A Trim Out at Tipping Floor 10 Install AHU-01 at Controller Booth 2d 8/19/2019 8/20/2019 Install AHU-01 at Controller Booth 0 309 TB -00-1409 Install HVAC Duct at Controller Booth ld 8/21/2019 8/21/2019 Install HVAC Duct at Controller Booed 310 TB -00-1419 Install HVAC Ceiling Grilles at Controller Booth ld 8/22/2019 8/22/2019 Install HVAC Ceiling Grilles at Controller Booth 311 TB -00-1049 Install Overhead Door Units 5d 8/23/2019 8/29/2019 Install Overhead Door Units 10 312 TB -00-1069 Install Controller Booth Gate and Railing Assembly 3d 8/26/2019 8/28/2019 Install Controller Booth Gate and Railing Assembly 0 313 314 315 316 317 318 319 TB -00-0979 TB -00-0999 TB -00-1009 TB -00-1019 TB -00-1029 TB -00-1039 TB -00-1319 Install Translucent Wall Panels South Side Install Glass Block Panels South Side Install Exterior Louvers South Side Install Exterior Louvers North Side Install Exterior Louvers East Side Install Exterior Louvers West Side Install Booster Pump Station at Tipping Floor 3d 3d 3d 3d 8/27/2019 8/27/2019 8/29/2019 8/29/2019 Install Translucent Wall Panels South Side 0 Install Glass Block Panels South Side 0 Install Exterior Louvers South Side 0 Install Exterior Louvers North Side 0 Install Exterior Louvers East Side 0 Install Exterior Louvers West Sae 1 Install Booster Pump Station at Tipping Floor 8/27/2019 8/27/2019 8/29/2019 8/29/2019 8/29/2019 8/29/2019 8/29/2019 3d 3d 3d 8/27/2019 8/27/2019 8/27/2019 320 321 322 323 TB -00-0939 TB -00-0949 Install Aluminum Walkway System East Side 4d 8/30/2019 9/5/2019 Install Aluminum Walkway System East Side Q Install Aluminum Walkway System West Side 4d 8/30/2019 8/30/2019 9/5/2019 Install Aluminum Walkway System West Side 0 TB -00-0959 TB -00-0989 Install Aluminum Walkway System South Side 4d 9/5/2019 Install Aluminum Walkway System South Side ❑ Install Translucent Wall Panels North Side 3d 8/30/2019 9/4/2019 Install Translucent Wall Panels North Side 0 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement a ° i.iearsvater 1- 0 Run Date: 10/13/2017 Page n of 16 Line Unique Task ID Name Duration Start Flnish 2017 2018 2019 M, A M, 3 J, A 5 0 N D, J F, M A, M J, J A S, O N, D, J, F M A M J, 3 A, 5 0, N ,13 ,3 ,24 ,15 ,5 ,26 ,17 ,7 ,28 ,18 ,9 ,30 ,20 ,11 ,1 ,22 ,12 5 ,26 ,16 ,7 ,28 ,18 ,9 ,30 ,20 ,10 ,1 .21 ,12 ,3 ,24 ,14 ,4 ,25 ,18 ,9 ,29 ,20 ,10 ,1 ,22 ,11 ,2 ,23 ,14 ,4 ,22 ,26 ,30 ,34 ,38 42 -46 ,50 ,54 ,58 ,62 ;66 ,70 ,74 ,78 ,82 ,86 ,90 ,94 ,98 ,102 ,106 ,110 ,114 ,118 ,122 ,126 ,130 ,134 ,138 442 ,146 ,150 ,154 , 324 TB -00-0620 Systems Testing 14d 8/30/2019 9/19/2019 Systems Testng- 325 TB -00-0630 Final Inspections 7d 9/20/2019 9/30/2019 Rnal Inspections. 326 TB -00-0631 Completion of Transfer Station ld 10/1/2019 10/1/2019 Layout Foundations Completion of Transfer Station' 327 Scale Building, SB -00-0100 Layout Foundations 2d 11/12/2018 11/13/2018 a_ 328 SB -00-0200 Excavate Foundations 3d 11/14/201811/16/2018 Excavate Foundations!' 329 S13-00-0210 Form Foundations 2d 11/19/201811/20/2018 Foran Foundations 330 SB -00-0211 Reinforce Concrete Foundations 2d 11/21/2018 11/23/2018 Reinforce Concrete Foundations 331 SB -00-0220 Place Concrete Foundations ld 11/26/201811/26/2018 Place Concrete Foundation) 332 93-00-0230 Prep Subgrade for SOG 2d 11/27/2018 11/28/2018 Prep Subgrade for 50G 1 333 334 335 SB -00-0250 SB -00-0730 SB -00-0740 FormSOG 2d 11/29/2018 11/30/2018 Form SOGI U/G Electrical Roughin 5d 11/29/2018 12/5/2018 U/G Elecslcal Roughs 1 U/G Plumbing Roughin 5d 11/29/2018 12/5/2018 U/G plumbing Roughin 1 336 SB -00-0240 Treat Spray SOG ld 12/3/2018 12/3/2018 Treat Spray 5001 337 SB -00-0260 Reinforce SOG 2d 12/4/2018 12/5/2018 Reinforce 5001 338 SB -00-0270 Place SOG ld 12/6/2018 12/6/2018 Place 5061 339 SB -00-0692 Install Door Frames ld 12/7/2018 12/7/2018 Install Door Frames 1 340 SB -00-0280 1st Lift - Set CMU 2d 12/10/2018 12/11/2018 lst uft - set CMU I 341 SB -00-0290 1st Lift - Reinforce CMU ld 12/12/2018 12/12/2018 1st urt - Reinforce CMU 1 342 SB -00-0300 1st Lift - Fill Cell CMU ld 12/13/2018 12/13/2018 1st LIR - Fill Cell CMU 1 343 SB -00-0310 2nd Lift - Set CMU 2d 12/14/2018 12/17/2018 2nd Lift - Set CMU 1 344 93-00-0320 2nd Lift - Reinforce CMU ld 12/18/2018 12/18/2018 2nd Lift - Reinforce CMU 1 345 5B-00-0330 2nd Lift - Fill Cell CMU ld 12/19/2018 12/19/2018 2nd Lift - Fill Cell CMU 1 346 5B-00-0340 3rd Lift - Set CMU 2d 12/20/2018 12/21/2018 3rd Lift - Set CMU 1 347 SB -00-0350 3rd Lift - Reinforce CMU ld 12/24/2018 12/24/2018 3rd Lit - Reinforce CMU 1 348 S13-00-0360 3rd Lift - Fill Cell CMU ld 12/26/2018 12/26/2018 3rd LIR - Fill Cell CMU 1 349 SB -00-0370 Final Lift - Set CMU 2d 12/27/2018 12/28/2018 Final Lift - Set CMU 1 350 S13-00-0380 Final Lift - Reinforce CMU ld 12/31/2018 12/31/2018 Final Lift - Reinforce CMU 1 351 SB -00-0390 Final Lift - Fill Cell CbN ld 1/2/2019 1/2/2019 Final Lift - Fill Cell CMU 1 352 SB -00-0400 Install Bar Joists 2d 1/3/2019 1/4/2019 Install Bar 301501 r 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement u. r °learwater U Run Date: 10/13/2017 Page 12of16 Line Unique Task ID 4 blame Duration Start Finish 2017 2018 2019 M, A M 1 J 3 1 A S 0 N D, J F, M A, M J J A 1 S, 0 N, D J 1 F M 1 A M 1 J 1 J A 1 5 0 ,N ,13 13 124 115 ,5 126 117 17 128 138 ,9 130 120 111,i1 152 132 ,S 126 106 17 158 118 19 130 ,20 110 ,9 122.112 13 154 114 14 A25 118 ,4 129 120 130 11 122 112 12 123 114 14 ,22 326 130 134 138 142 ,46 ,50 154 ,58 ,62 166 170 174 78 182 186 190 194 198 102 1106 1110 ,114 ,118 ,122 1126 1130 1134 1138 1142 1146 1150 ,154 1 353 SB -00-0410 354 SB -00-0694 Install Roof Decking Install Metal Framing 2d 4d 1/7/2019 1/7/2019 1/8/2019 1/10/2019 Install Roof Decking Install Metal Framing) 355 SB -00-0790 356 SB -00-0420 357 SB -00-0691 Install Truck Weight Scales 20d 1/9/2019 2/5/2019 Install Truds Weight Scales 11■ Install Roofing Insulation 2d 1/9/2019 1/10/2019 Install Rooflng Insulation 1 Install Windows 3d 1/9/2019 1/11/2019 Instalwlndows' 358 SB -00-0690 Install Roofing Membrane System 3d 1/11/2019 1/15/2019 Install Roofing Membrane System 1 359 SB -00-0700 Above Slab Electrical Roughin 5d 1/11/2019 1/17/2019 Above Slab Electrical Roughen 360 SB -00-0701 361 SB -00-0702 Above Slab Plumbing Roughin 5d 1/11/2019 1/17/2019 Above Slab Plumbing RoughinI Above Slab Mechanical Roughin 3d 1/11/2019 1/15/2019 Above Slab Mechanical Roughing 362 SB -00-0724 Install Stucco System 10d 1/14/2019 1/25/2019 Install Stucco System II 363 SB -00-0706 Install Rooftop RTAC-SH Unit 2d 1/16/2019 1/17/2019 Install Rooftop RTAC-SHUnit 1 364 SB -00-0695 Install Wall Insulation 2d 1/18/2019 1/21/2019 Install Wan Insulation 1 365 -B-00-0703 Install HVAC Duct 3d 1/18/2019 1/22/2019 Instal HVAC Duct 1 366 tiB-00-0705 Install HVAC Controls 2d 1/18/2019 1/21/2019 Install HVAC Controls' 3t7 tiB-00-0707 368 ti3-00-0711 369 SB -00-0712 370 SB -00-0713 Pull Electrical Wire Install Fire Alarm System Install CCTV System Install Security System 5d 4d 4d 4d 1/18/2019 1/24/2019 Pull Electrical Wive 1 Install Fire Alan System 1 Install CCTV System) Install Security System 1 1/18/2019 1/23/2019 1/18/2019 1/18/2019 1/23/2019 1/23/2019 371 SB -00-0696 Hang Gyp Board - Walls 3d 1/22/2019 1/24/2019 Hang Gyp Board - Was! 372 SB -00-0697 Finish Gyp Board - Walls 3d 1/25/2019 1/29/2019 Finish Gyp Board - Walls 1 373 SB -00-0716 Exterior Painting 5d 1/28/2019 2/1/2019 exterior Paintlg II 374 SB -00-0698 375 93-00-0721 Install ACT Track 2d 3d 1/30/2019 1/31/2019 Instars ACT Trade' Install Ceramic Tile Wall System 1 Install Ceramic Tile Wall System 1/30/2019 2/1/2019 376 SB -00-0699 377 SB -00-0704 378 SB -00-0708 Install ACT Tiles Install Grilles and Diffusers Install Light Fixture ld 2d 3d 2/1/2019 2/1/2019 2/1/2019 2/1/2019 2/4/2019 2/5/2019 Instars ACT Tiles Install Grilles and Diffusers) Install Light Fixture 1 379 SB -00-0710 380 SB -00-0717 Install Plumbing Fixtures 2d 2/4/2019 2/5/2019 Install Plumbing Fixtures' Install Roof Access Ladder ld 2/4/2019 2/4/2019 Install Roof Access Ladders 381 SB -00-0718 Install Aluminum Gutter & Downspout System 4d 2/4/2019 2/7/2019 Install Aluminum Gutter & Downspout System, 382 SB -00-0723 Install HVAC Louvers 2d 2/4/2019 2/5/2019 install HvAC Louvers) 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/13/2017 Page 13 of 16 Uearwater Line Unique Task ID 9 Name Duration Start Fini•sh 2017 2018 2019 M, A M, 3 3, A S 0, N D, 3 F, 14 A, Ma3 3 A S i 0 8, 0 3, F M, A M, 3, 3 A, s O, N ,13 ,3 ,24 ,15 ,5 ,26 ,57 17 ,28 158 19 ,30 ,20 ,11 ,1 ,22 ,12 ,5 126 ,56 ,7 ,28 ,18 ,9 ,30 ,20 ,10 ,1 ,22 ,12 ,3 ,24 ,14 ,4 ,25 118 ,g 129 120 110 11 132 ,12 i2 123 ,14 14 ,22 ,26 ,30 ,34 ,38 ,42 ,46 ,50 ,54 ,58 ,62 ,66 ,70 ,74 ,78 ,82 ,86 ,90 ,94 ,98 ,102 ,106 ,110 ,114 ,118 ,122 ,126 ,130 ,134 ,138 ,142 ,146 ,150 ,154 , 383 SB -00-0715 Interior Painting 5d 2/5/2019 2/11/2019 Interior Painting 1 384 385 SB -00-0709 SB -00-0722 Electrical Trim Out Install T&B Accessoreis 3d ld 2/6/2019 2/6/2019 2/8/2019 2/6/2019 Electrical Trim Out 1 Install T&8 Accessorels 1 386 387 388 SB -00-0693 SB -00-0714 ............... 93-00-0719 Install Doors Sr Hardware 1d 2/12/2019 2/12/2019 Install Doors & Hardware 1 Install Hot Water Heaters EWH-1 2d 2/12/2019 2/13/2019 Instal Hot Water Heaters EWH-111 Install Casework 4d 2/12/2019 2/15/2019 Install Casework 1 389 5B-00-1161 Final Inspections at Scale House 5d 2/14/2019 2/20/2019 Final Inspections at Scale House 1 390 SB -00-0720 Install Ceramic Tile Flooring System 3d 2/18/2019 2/20/2019 Install Ceramic Tile Flooring System 1 391 392 SB -00-0733 Administra AD -00-0100 Completion of Scale House ion Building Layout Foundations ld 2d 2/21/2019 11/12/2018 2/21/2019 11/13/2018 Completion of Scale House 1 Layout Foundations 393 AD -00-0110 Excavate Foundations 6d 11/14/2018 11/21/2018 Excavate Foundations® 394 AD -00-0120 Form Foundations 4d 11/23/2018 11/28/2018 Form Foundations 1 395 AD -00-0130 Reinforce Concrete Foundations 4d 11/29/2018 12/4/2018 Reinforce Concrete Foundations' 396 AD -00-0140 Place Concrete Foundations ld 12/5/2018 12/5/2018 Place Concrete Foundations) 397 AD -00-0150 Prep Subgrade for SOG 4d 12/6/2018 12/11/2018 Prep Subgrade for 50G 1 398 399 400 AD -00-0170 AD -00-0460 AD -00-0480 Form SOG U/G Electrical Roughin U/G Plumbing Roughin 4d 10d 10d 12/12/201812/17/2018 12/12/2018 12/12/2018 Fornr SOG1 12/26/2018 12/26/2018 U/G Electrical Roughin U/G Plumbing Roughin 401 AD -00-0160 Treat Spray SOG ld 12/18/201812/18/2018 Treat Spray SOG 402 AD -00-0180 Reinforce SOG 4d 12/19/2018 12/24/2018 Reinforce 5061 403 AD -00-0190 Place SOG ld 12/27/201812/27/2018 Place 50G1 404 AD -00-0370 Install Door Frames 2d 12/28/2018 12/31/2018 Install Door Frames 405 AD -00-0200 1st Lift - Set CMU 4d 1/2/2019 1/7/2019 1st Lift - Set CMU 1 406 AD -00-0210 1st Lift - Reinforce CMU 2d 1/8/2019 1/9/2019 1st Lift - Reinforce CMU 1 407 AD -00-0220 1st Lift - Fill Cell CMU ld 1/10/2019 1/10/2019 1st Lift- Fitl Celt CMU1 408 AD -00-0230 2nd Lift - Set CMU 4d 1/11/2019 1/16/2019 2nd Lift - Set CMU 1 409 AD -00-0240 2nd Lift - Reinforce CMU 2d 1/17/2019 1/18/2019 2nd Lift - Reinforce CMU 1 410 AD -00-0250 2nd Lift - Fill Cell CMU ld 1/21/2019 1/21/2019 2nd Lift- Fill Cel CMU1 411 AD -00-0260 3rd Lift - Set CMU 4d 1/22/2019 1/25/2019 3rd Lift - Set CMU I 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/13/ 2017 Page 14 of 16 Ckarwater 35 Line Unique Task ID 9 Name Duration Start F. . h 2017 2018 2019 M, A M, J J, A S O N D, 3 FMA, M 3 3 AS, O N, D J, F M A M J, 3 A, S O, N 113 13 ,24 ,15 ,5 ,26 117 17 ,28 ,18 ,9 ,30 ,20 ,11 4 ,22 42.,5 ,26 46 ,7 ,28 48 ,9 ,30 ,20 40 ,1 R2 ,12 ,3 ,24 ,14 ,4 ,25 ,18 ,8 ,29 120 ,10 ,1 120 110 12 123 ,24 ,9 ,22 ,26 ,30 ,34 ,38 ,42 ,46 ,50 ,54 ,58 ,62 ,66 70 74 ,78 82 86 90 ,94 ,98 402 406 ,110 414 418 ,122 426 430 ,134 4.38 4.42 446 450 454 , 412 AD -00-0270 3rd Lift - Reinforce CMU 2d 1/28/2019 1/29/2019 3rd Lift - Reinforce CMU l 413 AD -00-0280 3rd Lift - Fill Cell CMU ld 1/30/2019 1/30/2019 3rd Lift - Fill Cell CMU 1 414 AD -00-0290 Final Lift - Set CMU 4d 1/31/2019 2/5/2019 Final Lift - Set CMU 1 415 AD -00-0300 Final Lift - Reinforce CMU 2d 2/6/2019 2/7/2019 Final Lift- Reinforce CMU1 416 AD -00-0310 Final Lift - Fill Cell CMU ld 2/8/2019 2/8/2019 Final Lift - Fill Cell CMU 1 417 AD -00-0320 Install Bar Joists 4d 2/11/2019 2/14/2019 Instal Bar Joists 1 418 AD -00-0330 419 AD -00-0390 Install Roof Decking 4d 2/15/2019 2/20/2019 Install Roof Decking 1 Install Metal Framing 8d 2/15/2019 2/26/2019 Install Metal Framing 420 AD -00-0340 Install Roofing Insulation 4d 2/21/2019 2/26/2019 Install Roofing Insulation 1 421 AD -00-0360 Install Windows 6d 2/21/2019 2/28/2019 Install Windows 1 422 AD -00-0350 423 AD -00-0450 424 AD -00-0470 425 AD -00-0490 Install Roofing Membrane System 6d 2/27/2019 3/6/2019 Install Roofing Membrane System II Above Slab Electrical Roughin 10d 2/27/2019 3/12/2019 Above Slab Electrical Roughin Above Slab Plumbing Roughin 10d 2/27/2019 3/12/2019 Above Slab Plumbing Roughin Above Slab Mechanical Roughin 6d 2/V/2019 3/6/2019 Above Slab Mechanical Roughin 426 AD -00-0710 Install Stucco System 20d 3/1/2019 3/28/2019 Install Stucco System MI 427 AD -00-0530 Install Rooftop RTAC-ADM Unit 2d 3/7/2019 3/8/2019 Install Rooftop RTAC-ADM Unit 1 428 AD -00-0500 429 AD -00-0520 Install HVAC Duct Install HVAC Controls 6d 4d 3/11/2019 3/11/2019 3/18/2019 Install HVAC Duct® 3/14/2019 Install HVAC Controls 1 430 AD -00-0400 431 AD -00-0540 432 AD -00-0580 433 AD -00-0590 434 AD -00-0600 Install Wall Insulation 4d 10d 6d 6d 6d 3/13/2019 3/18/2019 Install Wall Insulation 1 Pull Electrical Wire 3/13/2019 3/26/2019 Pun Electrical Wire Install Fire Alarm System Install CCTV System 1 Install Security System Install Fire Alarm System Install CCTV System Install Security System 3/13/2019 3/20/2019 3/13/2019 3/13/2019 3/20/2019 3/20/2019 435 AD -00-0410 Hang Gyp Board - Walls 6d 3/19/2019 3/26/2019 Hang Gyp Board - Walk 1 436 AD -00-0420 Finish Gyp Board - Walls 6d 3/27/2019 4/3/2019 Finish Gyp Board - Walk 1 437 AD -00-0630 Exterior Painting 10d 3/29/2019 4/11/2019 Exterior Painting® 438 AD -00-0430 439 AD -00-0680 Install ACT Track 4d 6d 4/4/2019 4/9/2019 Install ACT Track Install ceramic Tile wall System Install Ceramic Tile Wall System 4/4/2019 4/11/2019 440 AD -00-0440 441 AD -00-0510 Install ACT Tiles 2d 4/10/2019 4/11/2019 Install ACT Tiles Install Grilles and Diffusers 4d 4/10/2019 4/15/2019 Install Grilles and Diffusers 1 ex 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement LL ° (jlearSvater U Run Date: 10/13/2017 Page 15 of 16 Line Unique Task 1D Name Duration Start Finish 2017 2018 2019 M, A M, J J, A 5 O N D, 1 F, M A, M J J A, S, O N, 0, J, F M, A M, J, J A, 5 O, N ,13 ,3 24 ,15 ,5 ,56 37 ,7 ,28 ,18 9 ,30 ,50 ,11 1 ,52 ,12 ,5 56 ,16 ,7 ,58 18 ,9 ,30 ,50 50 11 152 ,12 ,3 ,54 ,14 ,4 ,55 18 ,@ 159 150 ,10 ,1 ,52 ,12 ,2 23 ,14 11 ,22 ,26 ,30 ,34 ,38 ,42 ,46 ,50 ,54 ,58 ,62 ,66 ,70 ,74 ,78 ,82 ,86 ,90 ,94 ,98 ,102 ,106 ,110 ,114 ,118 ,122 ,126 ,130 ,134 442 AD -00-0550 Install Light Fixture 5d 4/10/2019 4/16/2019 Install Light FixtureI ,138 ,142 ,146 ,150 ,154 443 AD -00-0570 Install Plumbing Fixtures 4d 4/12/2019 4/17/2019 Install Pkimbing Fixtures' 444 AD -00-0640 Install Roof Access Ladder ld 4/12/2019 4/12/2019 Install Roof Access Ladder) 445 AD -00-0650 Install Aluminum Gutter & Downspout System 7d 4/12/2019 4/22/2019 Install Aluminum Gutter & Downspout System 446 AD -00-0700 Install HVAC Louvers 2d 4/12/2019 4/15/2019 Install HVAC Louvers' 447 AD -00-0730 Install Shower Units 2d 4/12/2019 4/15/2019 Install Shower Units 1 448 AD -00-0620 Interior Painting 10d 4/16/2019 4/29/2019 Interior PaintingN 449 AD -00-0560 Electrical Trim Out 6d 4/17/2019 4/24/2019 Electrical Trim Out II 450 AD -00-0690 Install T&B Accessoreis 3d 4/18/2019 4/22/2019 Install T&B Accessoreis 1 451 AD -00-0380 Install Doors & Hardware 2d 4/30/2019 5/1/2019 Install Doors & Hardware 452 AD -00-0610 Install Hot Water Heaters EWH-1 2d 4/30/2019 5/1/2019 Install Hot Water Heaters EWH-11 453 AD -00-0660 Install Casework 5d 4/30/2019 5/6/2019 Install Casework® 454 AD -00-0721 Final Inspections at Admin Building 5d 5/2/2019 5/8/2019 Final Inspections at Admin BuildingI 455 AD -00-0670 Install Ceramic Tile Flooring System 6d 5/7/2019 5/14/2019 install Ceramic Tile Flooring System 1 456 AD -00-0720 Install Lockers 2d 5/15/2019 5/16/2019 Install Lockers' 457 AD -00-0722 Completion of Admin Building ld 5/17/2019 5/17/2019 Completion of Admin Building 1 Fire Booster Pump Building 458 FB -00-0310 Install Fire Booster Pump Building 20d 11/27/2018 12/24/2018 Install Fire Booster Pump Building - Gas Generator Building 459 GG -00-0330 Install Gas Generator Building 15d 11/5/2018 11/26/2018 Install Gas Generator Building Ela Natural Gas Fueling Station 460 FS -00-0320 Install Natual Gas Fuel Station 25d 11/5/2018 12/10/2018 Instal Natual Gas Fuel Station - Potable Water Pump Station 461 WB -00-0340 Install Potable Water Booster Pump Stations 15d 11/5/2018 11/26/2018 Install Potable water Booster Pump Stations (] Project Closeout _.... ,Transfer Building --..---.--- .___ .__.�..._.._ 462 PC -00-0100 Substantial Completion ld 10/2/2019 10/2/2019 Substantial Completion) 463 PC -00-0200 Punch List 21d 10/3/2019 10/31/2019 Punch List 464 PC -00-0300 Final Completion ld 10/31/2019 10/31/2019 Final Completion 185 / Transfer Station City of Clearwater Data Date: 11/2/2017 GMP Schedule Supplement Run Date: 10/13/2017 Pale 16 of 16 : Clearwater 3/ City of Clearwater Solid Waste Transfer Station Replacement Project Project #15 -0007 -SW Guaranteed Maximum Price KO KOLAKIS SECTION EIGHT LIST OF DOCUMENTS 38 Item Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 1. Permit Construction Documents by Thomas E. Cunningham Architecture & Interior Design. G0.00 Cover G1.00 Drawing Index 6/30/2017 GI.01 Abbreviations and Legend 6/30/2017 G1.02 Notes 6/30/2017 G1.03 Parcel Legal Descriptions & Report of Survey 6/30/2017 G1.04 Construction Pollution Prevention Plan 6/30/2017 G1.05 Construction Pollution Prevention Plan (Coachman Ridge Park) 6/30/2017 C1.01 Existing Overall Site Plan 6/30/2017 C1.03 Existing Project Site Demo and Tree Removal Plan 6/30/2017 C1.03A Existing Project Site Post Demo and Tree Removal Plan 6/30/2017 C1.04 Coachman Ridge Park Site Demolition and Tree Removal Plan 6/30/2017 C2.01 Existing Condition Drainage Basin Map (1) 6/30/2017 C2.02 Proposed Condition Drainage Basin Map (1) 6/30/2017 C3.00 Overall Site Plan 6/30/2017 C3.01 Traffic Plan 6/30/2017 C3.02 Signing & Pavement Marking Plan 6/30/2017 C4.01 Paving, Grading and Drainage Plan (1) 6/30/2017 C4.02 Coachman Ridge Park Paving, Grading and Drainage Plan (1) 6/30/2017 C4.03 Coachman Ridge Park Paving, Grading and Drainage Plan (2) 6/30/2017 C4.04 Wetland Mitigation Grading and Planting Plan 6/30/2017 C4.05 Scale Area Paving, Grading and Drainage 6/30/2017 C4.11 Wetland Impact Pian 6/30/2017 C4.12 Coachman Ridge Park Wetland Impact Plan 6/30/2017 C4.51 Grading Details (1) 6/30/2017 C4.52 Grading Details (2) 6/30/2017 C4.53 Geoweb Details 6/30/2017 C5.00 Overall Preloading Plan 8/1/2015 C5.01 Temporary Leachate Collection System Plan and Details 8/1/2015 C8.00 On -Site Utility Plan (1) 6/30/2017 C8.01 On -Site Utility Plan (2) 6/30/2017 8/30/2017 C8.02 On -Site Utility Plan (3) 6/30/2017 8/30/2017 C8.03 On -Site Utility Plan (4) 6/30/2017 8/30/2017 39 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 40 C8.04 On -Site Utility Plan (4) 6/30/2017 8/30/2017 TC1.00 Traffic Control Requirements 8/1/2015 D1.00 Miscellaneous Details (1) 6/30/2017 D1.01 Miscellaneous Details (2) 6/30/2017 D1.02 Miscellaneous Details (3) 6/30/2017 D1.03 Miscellaneous Details (4) 6/30/2017 8/30/2017 D1.04 Miscellaneous Details (5) 6/30/2017 D1.05 Miscellaneous Details (6) 6/30/2017 D1.06 Miscellaneous Details (7) 6/30/2017 D1.07 Miscellaneous Details (8) 6/30/2017 D1.08 Miscellaneous Details (9) 6/30/2017 M1.00 Scale House Plan 8/1/2015 M2.00 Scale House Pump Station Plan and Details 8/1/2015 8/30/2017 M3.00 Leachate Storage Tank Plan 8/1/2015 M3.01 Leachate Storage Tank Sections 8/1/2015 M6.00 Fueling Station Plan 6/30/2017 M7.00 Generator Plan and Section 6/30/2017 M8.01 Transfer Station Crane Plan - Operator Booth Level 8/1/2015 M8.02 Transfer Station Mechanical Room Plan and Details 8/1/2015 M8.03 Transfer Station Crane Sections 8/1/2015 M8.04 Pit Brush Assembly Details 8/1/2015 S1.00 General Structural Notes 7/14/2017 S1.01 Transfer Station Foundation Plan 7/14/2017 S1.02 Transfer Station Tipping Floor Plan 7/14/2017 S1.03 Transfer Station Sections 1 of 2 7/14/2017 S1.04 Transfer Station Sections 2 of 2 7/14/2017 S1.05 Transfer Station Details 1 of 3 7/14/2017 S1.06 Transfer Station Details 2 of 3 7/14/2017 S1.07 Transfer Station Details 3 of 3 7/14/2017 S1.08 Transfer Station Enlarged Plan and Steel Beam Details 7/14/2017 S1.09 Transfer Station Schedules and Details 7/14/2017 S1.10 Transfer Station Elevated Platform Plans and Detail 7/14/2017 S1.11 Transfer Station Stair Plans, Sections, and Details 7/14/2017 S2.01 Scale Building - Floor Slab Plan and Roof Framing Plan 7/14/2017 S2.02 Scale Building - Sections 7/14/2017 S2.03 Scale Building - Structural Elevations 7/14/2017 S2.04 Scale Foundations Plan, Section and Details 7/14/2017 40 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 41 S3.01 Administration Building - Floor Slab and Roof Framing Plan 7/14/2017 S3.02 Administration Building - Sections 7/14/2017 S3.03 Administration Building - Structural Elevations 7/14/2017 S5.01 Site Retaining Wall Key Plan and Details 7/14/2017 S5.02 Box Culvert Headwalls 7/14/2017 S5.03 Building Details 7/14/2017 S5.04 Standard Masonry Details 7/14/2017 S5.05 Standard Structural Details 1 of 2 7/14/2017 S5.06 Standard Structural Details 2 of 2 7/14/2017 A1.01 Transfer Building Life Safety Plan A1.02 Transfer Building Floor Plan 6/30/2017 A1.03 Transfer Building - Building Elevations 6/30/2017 A1.04 Transfer Building - Building Elevations 6/30/2017 A1.05 Transfer Building Control Booth 6/30/2017 A2.01 Scale Building Life Safety Plan 6/30/2017 A2.02 Scale Building Floor Plan, Roof Plan, Ceiling Plan 6/30/2017 A2.03 Scale Building - Accessibility Plan, Interior Elevations 6/30/2017 A2.04 Scale Building - Building Elevations 6/30/2017 A2.05 Scale Building - Building Sections 6/30/2017 A3.01 Administration Building Life Safety Plan & Code Requirements 6/30/2017 A3.02 Administrations Building Floor Plan, Ceiling Plan, Roof Plan 6/30/2017 A3.03 Administration Building Accessibility Plan 6/30/2017 A3.04 Administration Building Interior Elevations 6/30/2017 A3.05 Administrations Building Building Elevations 6/30/2017 A3.06 Administrations Building Building Sections 6/30/2017 A5.01 Wall Sections - Scale Building & Administration Building 6/30/2017 A5.02 Architectural Wall Types & Details 6/30/2017 A5.03 Architectural Schedules 6/30/2017 A5.04 Architectural Details 6/30/2017 A5.05 Architectural Details 6/30/2017 E0.01 Abbreviations 6/30/2017 E0.02 Symbols 6/30/2017 E0.03 Electrical Site Plan 6/30/2017 E0.04 Power Riser 1 6/30/2017 E0.05 Power Riser 2 6/30/2017 E0.06 Controls 6/30/2017 E0.07 Panel Schedules 1 6/30/2017 E0.08 Panel Schedules 2 6/30/2017 41 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 42 E0.09 Conduit & Wire Risers 6/30/2017 E0.10 Communications & Fire Alarm Risers 6/3/2017 E0.11 Lighting Fixture Schedule & Details 6/3/2017 E0.12 Details 6/30/2017 E1.01 Transfer Building Lighting Plan 6/3/2017 E1.02 Transfer Building Power Plan 6/30/2017 E1.03 Transfer Building Fire Alarm & CCTV 6/30/2017 E1.04 Tunnel Lighting & Power Plan 6/30/2017 E2.01 Scale House Lighting & Power Plan 6/30/2017 E2.02 Scales 6/30/2017 E2.03 Scale House Fire Alarm -CCTV & Security Plan 6/30/2017 E3.01 Administration Building Lighting & Power Plans 6/30/2017 E3.02 Administration Building Electrical Room 6/30/2017 E3.03 Administration Bldg Fire Alarm & Security Plan 6/30/2017 E4.01 Gas Dispensing System & Booster Pumps 6/30/2017 E4.02 Leachate Storage 6/30/2017 F1.00 Transfer Station Fire Protection Site Plan 7/14/2017 F1.01 Transfer Station Tunnel Level Fire Protection Plan 7/14/2017 F1.02 Transfer Station Tipping Level Fire Protection Plan 7/14/2017 F5.01 Fire Protection Details 7/14/2017 V0.01 General 6/30/2017 V0.02 Schedules 1 6/30/2017 V0.03 Schedules 2 6/30/2017 V0.04 Details 6/30/2017 V0.05 Details 6/30/2017 V0.06 Details 6/30/2017 V1.01 Transfer Building Plan 6/30/2017 V1.02 Tunnel Plan 6/30/2017 V1.03 Operators Booth 6/30/2017 V2.01 Scale House Plan 6/30/2017 V3.01 Administration Building Plan 6/30/2017 P0.01 General 6/30/2017 P0.02 Schedules & Details 6/30/2017 P0.03 Standard Details 1 6/30/2017 P0.04 Standard Details 2 6/30/2017 P0.05 Standard Details 3 6/30/2017 P1.01 Transfer Building Plan 6/30/2017 P1.02 Tunnel Plan 6/30/2017 P1.03 Risers 6/30/2017 P2.01 Scale House Plan 6/30/2017 P2.02 Risers 6/30/2017 P3.01 Administration Building Plans 6/30/2017 42 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 43 P3.02 Risers 6/30/2017 L1.00 Code Landscape Plan 8/1/2016 L1.01 Code Landscape Plan 8/1/2016 LI.02 Code Landscape Plan 8/1/2016 L1.03 Code Landscape Plan 8/1/2015 L1.04 Code Landscape Plan 8/1/2015 L2.00 Code Irrigation Plan 8/1/2016 L2.01 Code Irrigation Plan 8/1/2016 L2.02 Code Irrigation Plan 8/1/2016 L2.03 Code Irrigation Plan 8/1/2015 2. Contract Documents & Specifications by Thomas E. Cunningham Architecture & Interior Design. 01005 General Requirements 8/18/2017 01015 Control of Work 8/18/2017 01030 Special Project Procedures 8/18/2017 01035 Prosecution and Progress 8/18/2017 01050 Field Engineering and Surveying 8/18/2017 01070 Abbreviations and Symbols 8/18/2017 01090 Reference Standards 8/18/2017 01152 Applications for Payment 8/18/2017 01153 Change Order Procedures 8/18/2017 01200 Meetings and Conferences 8/18/2017 01300 Submittals 8/18/2017 01310 Construction Schedules 8/18/2017 01340 Shop Drawings, Product Data, Working Drawings and Samples 8/18/2017 01410 Testing and Testing Laboratory Services 8/18/2017 01500 Temporary Facilities 8/18/2017 01505 Mobilization 8/18/2017 01510 Temporary Utilities 8/18/2017 01530 Protection of Exisiting Facilities 8/18/2017 01540 Security 8/18/2017 01550 Access and Temporary Access 8/18/2017 01600 Material and Equipment 8/18/2017 01640 Manufacturer's Services 8/18/2017 01650 Quality Control 8/18/2017 01700 Contract Closeout 8/18/2017 01720 Project Record Documents 8/18/2017 01730 Operating and Maintenance Data 8/18/2017 01740 Warranties and Bonds 8/18/2017 02001 General Utility Notes 8/18/2017 43 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 44 02010 Temporary Erosion and Sedimentation Control 8/18/2017 02030 Demolition and Alternations 8/18/2017 02061 Gravity Sewer Pipe 8/18/2017 02120 Geoweb 8/18/2017 02200 Site Preparation 8/18/2017 02201 Site Preloading 8/18/2017 02202 Topsoil 8/18/2017 02240 Dewatering 8/18/2017 02300 Preloading Cover 8/18/2017 02315 Excavation 8/18/2017 02316 Fill and Backfill 8/18/2017 02319 Subgrade Preparation 8/18/2017 02320 Trench Backfill 8/18/2017 02361 Termite Control 8/18/2017 02485 Surface Restoration 8/18/2017 02640 Potable Water Mains 8/18/2017 02650 Valves and Appurtenances 8/18/2017 02700 Trees Landscape Materials 8/18/2017 02730 Leachate Gravity Sewer 8/18/2017 02811 Irrigation System 8/18/2017 02820 Metal Fencing Materials 8/18/2017 8/30/2017 02900 Landscaping 8/18/2017 03100 Concrete Formwork 8/18/2017 03210 Reinforcing Steel 8/18/2017 03251 Concrete Joints 8/18/2017 03300 Cast -In -Place Concrete 8/18/2017 03350 Specialty Concrete Topping 8/18/2017 03351 High -Strength Concrete 8/18/2017 03366 Chemically Stained Concrete Floor 8/18/2017 03370 Concrete Curing 8/18/2017 03600 Grout 8/18/2017 03720 Vertical OH Concrete Surface Repair Systems 8/18/2017 03722 Horizontal Concrete Surface Repair Systems 8/18/2017 03740 Concrete Repair Crack Injection 8/18/2017 04230 Reinforced Unit Masonry 8/18/2017 04270 Glass Unit Masonry 8/18/2017 05050 Welding 8/18/2017 05120 Structural Steel 8/18/2017 05210 Open Web Steel Joists 8/18/2017 05310 Steel Deck 8/18/2017 05500 Metal Fabrications and Castings 8/18/2017 05520 Handrails 8/18/2017 44 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 45 05530 Metal Grating 8/18/2017 06100 Rough Carpentry 8/18/2017 06400 Architectural Woodwork 8/18/2017 07200 Air & Moisture Barrier 8/18/2017 07210 Budding Insulation 8/18/2017 07260 Vapor Retarders 8/18/2017 07530 Membrane Roofing 8/18/2017 07620 Sheet Metal Flashing 8/18/2017 07700 Roof Specialties and Accessories 8/18/2017 07900 Joint Sealants 8/18/2017 08110 Steel Door Frames 8/18/2017 08212 Wood Doors 8/18/2017 08220 FRP Doors & Frames 8/18/2017 08330 Overhead Coiling Doors 8/18/2017 08520 Aluminum Windows 8/18/2017 08580 Glass Block Panels 8/18/2017 08710 Finish Hardware 8/18/2017 8/30/2017 08950 Translucent Panel Systems 8/18/2017 09510 Acoustical Ceilings 8/18/2017 09900 Painting and Protective Coatings 8/18/2017 10200 Louvers and Vents 8/18/2017 10500 Lockers 8/18/2017 10520 Portable Fire Extinguishers 8/18/2017 10800 Toilet Accessories 8/18/2017 11150 Knuckleboom Cranes 8/18/2017 9/27/2017 11300 Packaged Grinder Pump Station for Low Pressure Sewer Collection System 8/18/2017 8/30/2017 13030 Prefabricated Rooms 8/18/2017 13100 Lightning Protection System 8/18/2017 13110 Truck Weigh Scale 8/18/2017 8/30/2017 13122 Pemb Transfer Building 8/18/2017 13210 Double Wall Leachate Storage Tank 8/18/2017 15100-01 PVC-DWV Pipe and Fittings 8/18/2017 15101 Plumbing Piping and Accessories 8/18/2017 15183 Refrigerant Piping 8/18/2017 15195 CNG Fueling Station 8/18/2017 15202 Process Valves and Operators 8/18/2017 15300 Fire Protection System 8/18/2017 15304 Packaged Fire Pump System 8/18/2017 15410 Plumbing Fixtures 8/18/2017 15730 Unitary AC Equipment 8/18/2017 15810 Metal Ductwork and Accessories 8/18/2017 45 Number Clearwater Solid Waster Transfer Station Reconstruction Issue For Permit LIST OF DOCUMENTS Submittal Date 08/24/17 Description Dated Revised 46 15830 Fans 8/18/2017 15850 Air Outlets and Inlets 8/18/2017 15900 HVAC Controls 8/18/2017 15950 HVAC Systems Testing 8/18/2017 15992 Piping Leakage Testing 8/18/2017 16010 Basic Electrical Requirements 8/18/2017 16015 Electrical Systems Analysis 8/18/2017 8/30/2017 16050 Basic Electrical Materials and Methods 8/18/2017 16060 Grounding 8/18/2017 16080 Electrical Testing 8/18/2017 16120 Conductors 8/18/2017 16130 Raceways and Boxes 8/18/2017 16216 CNG Generator Set 8/18/2017 16220 Low Voltage Motors 8/18/2017 16288 Transient Voltage Surge Surpressors 8/18/2017 16412 Automatic Transfer Switch 8/18/2017 16440 Low Voltage Motor Control 8/18/2017 16442 Panel boards 8/18/2017 16460 Low Voltage Transformers 8/18/2017 16500 Lighting 8/18/2017 16750 Solid State UPS 8/18/2017 3. Geotechnical Issued by Driggers Engineering Services, Inc. 01 Interim Report of the Geotechnical Investigation 9/24/2015 02 Addendum to Interim Report of the Geotechnical Investigation 10/9/2015 03 Estimated Normal Season High Groundwater Levels; Coachman Ridge Park Test Borings 12/8/2015 4. Supplements 01 FL -0185 -16 -PC Supplement 01 9/1/2017 02 FL -0185 -16 -PC Supplement 02 9/19/2017 5. Addenda 01 Addendum 01, Issued by King Engineering Associates, Inc. 8/30/2017 02 Addendum 02, Issued by King Engineering Associates, Inc. 9/18/2017 03 Addendum 03, Issued by King Engineering Associates, Inc. 9/27/2017 6. RFI's 01 'Responses to RFI's 001 thru 033 9/19/2017 46 *IR KO KO LAKI S 202 E. Center Street Tarpon Springs, FL 34689 (727) 942-2211 • www.jkokolakis.com 47