Loading...
DRUID ROAD / ALLEN'S CREEK STORMWATER IMPROVEMENTS - 11-0044-EN - CHANGE ORDER #1Change Order 1 PROJECT: Druid Rd/Allen's Creek Stormwater Pipe Replacement CONTRACTOR: Steve's Excavating & Paving, Inc. 1741 N. Keene Road Clearwater, FI 33755 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE: CODE: CODE: September 28, 2017 11 -0044 -EN ST112494 December 3, 2015 January 7, 2016 0315-96164-563700-539-000-0000 A 0327-96722-563800-533-000-0000 B 0327-96634-563800-535-000-0000 C SCOPE OF CHANGE: This Change Order Accepts Revisions to the Contract increasing and adding items to redesign Hercules from Druid Rd to Gulf to Bay and add 300 calendar days to the contract -see STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 -City Council 10/19/2017 NEW CONTRACT AMOUNT CteOrkt RCrt\AUS $2,825,423.59 $545,071.33 $ 3,370,494.92 George N. Cretekos APPROVED AS Mathew Smith, ATTEST: L. 4.,i../ .ct Mayor Assistant City Attorney Rosemarie Call, Date: CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA bOAAL-i„,, Wiliiam B. Horne, II City Manager ACCEPT B411-----111111110 Cat i ..? ago, : Stev s Excavating & Paving, I ,c.: Date: Viol Witnesses: (SE81.4 ... c Pttsideut iNkRecommended By: City of Clearwater Roger Johnson, PE bject Manager Michael D Quillen, PE, City Engineer Change Order 1- Druid Rd/Allen's Creek Stormwater Pipe Replacement ITEM DESCRIPTION UNIT KELY UNIT COST TOTAL COST Code A: Increases: 1.1 Maintenance of Traffic LS 0.18125 $ 32,000.00 $5,800.00 1.2 Mobilization LS 0.064001 $ 199,371.00 $12,760.00 2.1 Demolition LS 0.192492 $ 199,360.00 $38,375.25 3.4 Pinellas Co. Type J5 Inlet 5' x 5' Type J EA 0.113532 $ 5,875.00 $667.00 Bottom, 3.5' Dia. Riser 3.5 Pinellas Co. Type J5 Inlet 4'x4' Type J EA 0.451492 $ 4,525.00 $2,043.00 Bottom, 3.5' Dia. Riser 3.6 Pinellas Co. Type J5 Inlet 4' Dia. Type P EA 7 $ 4,525.00 $31,675.00 Bottom, 3.5' Dia. Riser 3.14 16" DIP LF 3 $ 115.00 $345.00 3.15 15" RCP LF 139 $ 67.00 $9,313.00 3.16 18" RCP LF 2 $ 72.00 $144.00 3.17 24" RCP LF 4 $ 70.00 $280.00 4.2 2.5" FDOT Type SP 12.5 Asphalt TN 508 $ 130.00 $66,040.00 4.3 8" Crushed Cone Base SY 5118.93 $ 23.00 $117,735.39 4.5 12" Stabilized Subgrade SY 3916 $ 12.50 $48,950.00 4.7 Concrete Driveway 6" Thick SF 1238 $ 6.50 $8,047.00 4.8 Concrete Walk 4" Thick SF 5447 $ 5.80 $31,592.60 4.12 FDOT Type F Curb LF 82 $ 18.30 $1,500.60 4.13 FDOT Valley Gutter Curb LF 247 $ 35.00 $8,645.00 4.14 Public Sidewalk Curb Ramps with tactile surf; EA 1 $ 1,965.00 $1,965.00 4.15 Pavement Markings & Signage LS 1.650999 $ 11,265.00 $18,598.50 5.1 Landscaping LS 0.098256 $ 12,900.00 $1,267.50 6.0 10% Stormwater Contingency LS 0.232052 $ 213,538.49 $49,551.94 Total Increases: $455,295.78 Additions: 4.16 8" Wide Retaining WaWCurb* LF 50 $ 35.00 $ 1,750.00 4.17 FDOT Type D Curb at ADA Ramps* LF 144 $ 35.00 $ 5,040.00 4.18 Traffic Loops and conduit on Hercules LS 1 $ 9,655.90 $ 9,655.90 7.1 Delay Fees LS 1 $ 73,329.65 $73,329.65 Total Additions: $ 89,775.55 Total Net Increases/Additions Code A: 5545,071.33