Loading...
ADDENDUM TO AGREEMENT FOR PROFESSIONAL SERVICES (2)ADDENDUM TO AGREEMENT FOR PROFESSIONAL SERVICES This ADDENDUM is made and entered into by and between the City of Clearwater, Florida (CITY) and Woods Consulting (ENGINEER) and hereby notes that the original Exhibit "B" was in error and the new, corrected Exhibit "B", attached to this Addendum, supersedes and replaces the original. Upon its execution by both parties, this Addendum, is made an integral part of the Agreement for Professional Services entered into by both parties on July 21, 2017. CITY OF CLEARWATER Date: IO]I(Q/.2,017 bltialzwi 1,11044Alczc William B. Horne, II City Manager ATTEST: WOODSCONSULTING Date: AEilure-‘—___ Name: Terri Skapik Title: President Rosemarie Call City Clerk APPR I VED • • FIC I A. Alla Ma M. Smit Assistant City Attorney Page 1 EXHIBIT "B" PROVISION OF PAYMENT ENGINEER OF RECORD: Woods Consulting BASIS FOR PAYMENT The owner shall pay ENGINEER and ENGINEER agrees to accept as full compensation for its services (as established by Work Order) compensation as computed by one of the following methods: Method "A" — Costs Times Multiplier Basis — Compensation in the form of actual costs times a multiplier as determined by the following formula: Actual raw Salary Cost (Hourly Rate) x Multiplier + Subconsultant Cost + Other Direct Costs. Multiplier 2 ' 2 includes fringe benefit rate, overhead, operating margin and profit and is subject to annual review. Subconsultant Costs are actual costs incurred times a factor of 1.00. Actual costs shall be based on billing rates for required labor classifications. Other Direct Costs are actual costs incurred for travel outside of Tampa Bay area, printing, copying, long distance telephone calls, etc., times a factor of 1.00. Method "B" — Lump Sum — Compensation in the form of "lump sum" for all work associated with a Work Order or task and shall be determined by mutual agreement between the ENGINEER and the City. The lump sum amount shall be negotiated based upon the Work Order scope of services and approved by both the City and the ENGINEER. Hourly Rates - The estimated hourly rates below represent 2015 costs and categories. Periodic changes are anticipated and modification can be made annually upon City and ENGINEER review. (Note: All rates are hourly salary) Exhibit B Page 1 CITY OF CLEARWATER ENGINEER OF RECORD RFQ 28-17 2017 DIRECT HOURLY RATES ENGINEER OF RECORD: Woods Consulting Job Classification Minimum Rate ($ / hour) Typical Maximum Senior Engineer 100.00 100.00 150.00 Construction Manager 100.00 100.00 150.00 Senior Permitting Consultant 80.00 80.00 120.00 Project Manager/Principal 80.00 80.00 120.00 Drafter/CADD Operator 42.50 42.50 63.75 Field Technician 42.50 42.50 63.75 Administrative/Clerical 22.50 22.50 33.75 MULTIPLIER: 2.2 Exhibit B — Page 2