PROPOSAL TO PERFORM PROFESSIONAL ENGINEERING SERVICESA4k1IG ENGINEERING
August 18, 2017
City of Clearwater
100 S Myrtle Ave, 3rd FI
Clearwater FL 33756-5520
Attn: Rick Osorio
Risk Manager
RE: National Fire Protection Association Standard, NFPA 70E, 2015 Edition
Compliance for City of Clearwater, FL
Dear Rick,
MECHANICAL
ELECTRICAL
PLUMBING
FIRE PROTECTION
TELECOMMUNICATIONS
Thank you for the opportunity to present our proposal to perform professional engineering services for
the project description referenced above.
SCOPE OF WORK
The original NFPA 70E compliance project as fully defined within the City of Clearwater RFP #05-16 Scope
of Work (including a 5% contingency), was for a maximum 5,175 pieces of electrical equipment. This was
based on an estimate provided by the City of Clearwater. After conducting a detailed arc flash risk
assessment on most of the facilities, it has become evident that more electrical equipment actually exists.
The scope of work as described below, is for an additional estimated 1,260 pieces of electrical equipment.
This estimate is based on the electrical equipment count assembled per the attachment EXHIBIT A.
The project will include services necessary for compliance with the requirements of the National Fire
Protection Association Standard, NFPA 70E, Handbook for Electrical Safety in the Workplace, 2015 edition.
Perform a complete equipment inventory/data study by collecting relative data, analyze the results
received, provide the resulting data to the City, provide equipment labels, label the relevant equipment,
and provide training guidance to the City.
Deliverables to include the following:
• Complete Engineering Analysis and Review of electrical distribution system to include Short
Circuit, Fault Current, Load Study (as needed), Protective Device Coordination Study, and Arc Flash
Analysis with detailed engineering analysis and recommendations by a State of Florida Certified
Professional Engineer
• Prepare report with findings and recommendations
• Provide Arc Flash Hazard label per NFPA-70E
CA5947 1 4825140th Avenue North I Clearwater, Florida 33762 I T 727.530.00771 F 727.530.0045 I www.apg.company
..A?G ENGINEERING
• Training and/or training documentation
MECHANICAL
ELECTRICAL
PLUMBING
FIRE PROTECTION
TELECOMMUNICATIONS
Owner shall be responsible for furnishing access to facility during normal business hours for gathering
pertinent information and/or applying labels to equipment. Owner shall also provide access to all available
electrical plans and power diagrams necessary to complete the arc flash risk assessment. The arc flash risk
assessment is a representation of the incident energy levels based on existing conditions. Any change to
the power system (circuit breaker settings, adding major equipment, etc.) will affect the incident energy
levels/PPE requirements of the arc flash risk assessment. Recognizing that the study is based upon the
validity of the power system study at a given point in time, all changes to the power system after APG
Engineering begins their work will be considered a "Change In Service" and subject to additional fee to
modify/re-evaluate the arc flash risk assessment.
BASIC FORM OF AGREEMENT
• Any general contractual conditions which may arise during the course of this service which are
not specifically covered herein shall be governed by the American Institute of Architects standard
form of agreement AIA Document Number C401TM - 2007 (Standard Form of Agreement Between
Architect and Consultant) which is made part of this agreement by reference.
• For hourly work, or work considered "Change in Service", APG Engineering will be reimbursed on
an hourly basis at the rates indicated below:
o Principal- $230
o Project Manager/Senior Engineer- $185
o Engineer/Senior Designer- $165
o Designer- $125
o CAD Operator- $95
o Administrative- $75
PROPOSED FEES
Based on the scope of work as described above, APG Engineering's fee is a lump sum not -to -exceed, all-
inclusive price of One Hundred Twenty -Eight Thousand Three Hundred Six Dollars ($128,306.00). This
lump sum shall be adjusted upward pro rata if the scope increases from the above. Should the actual
electrical component count decrease below 1,260 during the life of the contract, this lump sum shall be
adjusted downward accordingly.
Our fee is based on the following:
• Fee per estimated electrical component: $101.83
Additional Options:
Option 1 Additional Arc flash training classes, $1,000.00 each.
CA5947 1 4825140th Avenue North I Clearwater, Florida 33762 I T 727.530.0077 I F 727.530.0045 I www.apg.company
w.,AiG ENGINEERING
BILLING
MECHANICAL
ELECTRICAL
PLUMBING
FIRE PROTECTION
TELECOMMUNICATIONS
• Fees shall be billed on a monthly basis from the beginning of the project.
• Payment of all invoices shall be due within thirty (30) days from the date of invoice.
ACCEPTANCE OF PROPOSAL
We appreciate the opportunity to provide you with this proposal. If all of this is satisfactory with you,
please sign one copy of this letter and return it to us. In the event we do not receive a signed copy of this
letter, and we are authorized to begin work, we will assume the terms and conditions of this proposal
have been accepted by you.
Sincerely,
APG Engineering
laL,.. -at-,-.
Michael Dobbs
Principal
CLIENT: City of Clearwater
BY: DATE:
(Print Name) (Title)
***SEE ATTACHED SIGNATURE PAGE FOR CITY OF CLEARWATER SIGNATURES
CA5947 1 4825140th Avenue North I Clearwater, Florida 33762 I T 727.530.0077 I F 727.530.0045 I www.apg.company
Proposal to perform engineering services
APG Electric, Inc.
Countersigned:
George N. Cretekos
Mayor
CITY OF CLEARWATER, FLORIDA
By:
Approved as to form: Attest:
Assistant City Attorney
td�w�QM�.q
William B. Horne II
City Manager
Rosemarie CaII
City Clerk
ENGINEERING
EXHIBIT 'A' - ESTIMATED COMPONENT
COUNT
Electrical Component Count (Buses)
Department
Estimated
by City of
Clearwater
Actual
to Date
Estimated
Equipment
Remaining
Total
B&M & General Serv.
95
4
140
144
Solid Waste (Excluding transfer station)
38
48
48
Libraries (beach & countryside included with rec centers)
145
93
93
MSB
68
103
103
City Hall
22
48
48
Fire Dept (Excluding 46 & 50)
128
16
93
109
Police Dept. Main.
82
148
148
Police Sub Startions (Excluding Countryside)
48
22
36
58
Parking Garages (2)
26
31
12
43
Airpark
23
2
31
33
Parks & Rec (ball fields, fld., street, bridge lighting, parks, etc.)
1,195
1,212
468
1,680
Bright House Stadium
155
223
223
Carpenter Field (4)
58
58
58
Public Works Complex
49
69
69
Radio Towers (2)
46
4
62
66
Gas Dept
52
40
24
64
Spanish outreach (612 Franklin St)
4
2
4
6
Marina (2)
81
56
40
96
Reverse Osmosis Plants 1 & 2
108
171
50
221
Water Treatment Plant 3
15
60
60
Reclaimed water booster stations
45
6
44
50
Water wells & county connection (Including Tanks)
285
314
20
334
Lift stations
309
423
4
427
East wastewater plant
252
252
252
Northeast Wastewater plant
504
641
641
Marshall Street Wastewater plant
468
343
190
533
Citywide traffic control cabinets (Including "Engineering" services)
628
789
39
828
Totals
4,929
5,178
1,257
6,435
SUMMARY
Original Estimate + 5% Contingency
5,175
Estimated Additional Bus Count
1,260
Facility Name
Address
Progress
Allen's
Bayside Park
Herct►tes Ave
3035 Gulf to Bay Blvd
Completed
Completed
Belmont Park
d
1535 S Martin Luther King Jr Ave
plated
Completed
Bright House Field
tivd.
601 Old Coachman Rd
Corn
et
Completed
Capitol T eats!
Carpenter Field
651 Old Coachman Rd
Completed
Completed
Charles Park
2015 Broadway Ave
Completed
0
Chautauqua Park South
2190 Soule Rd
Completed
Ch
Cap
City Hall
112 S Osceola Ave
Completed
Clearwater Country Club
525 N Betty Ln
Completed
Clwr Beach Library & Rec.
If'v
69 Bay Esplanade
Completed
Cooper's Bayou Park
Fad
709 N Bayshore Blvd
Completed
Country Hollow Park
2724 Brattle Ln
Completed
Countryside Sports Complex
3060 McMullen Booth Rd
Completed
CRA - FrankCrum North parking lot and fountain
Cypress Bend Park
20 S Missouri Ave
Completed
2619 Winding Wood Dr
Completed
22364 t rit, Dr`.', E
Del Oro Park
401 N McMullen Booth Rd
Completed
Eddie C. Moore - Fields 5-7
3050 DrewSt
Completed
Edgewater Dr. Park
Elev. Wtr Tank #3
2090 Edgewater Dr
piked
Completed
1435 S Martin Luther King Jr Ave
Completed
Ervin Harris Youth Ctr.
riterprise;Rd East
1250 Holt Ave
Completed
R
Frank Tack Park
1967 N Hercules Ave
Completed
General Warehouse
ardertAve
115 S Martin Luther King Ave
ip
Completed
orse P
Improved Land
Improved Land
14 S Evergreen Ave
p
Completed
iilf to Bay Blvd
600 Franklin St
feted
Completed
Jack Russell Stadium - Single Building
Kapok Park
Kings tis
500 Phillies Dr
Completed
4So"Drew
2950 Glen Oak Ave
p
Completed
rnpt
Lake Chautauqua Park
Main Library
2312 Landmark Dr
Completed
S N Belzer Rd
100 N Osceola Ave
Completed
Marymont Park
Nt
lay Ave
1900 Gilbert St
Compl
Completed
Montclair Park
1821 Montclair Rd
Completed
0 P
Page 1 of 3
Facility Name
Address
Progress
Municipal Svcs Bldg.
100 5 Myrtle Ave
Completed
eenw
N. Greenwood Rec. & Aquatic Cmplx
Ave.;
900 N Martin Luther King Jr Ave
npleted
Completed
4
Northwood Park
2I7 N Qid Coachman Rd
2860 Enterprise Rd E
Pt
Completed
Open Rec. / Pkng #31
10
kiln St
150 S Gulfview Blvd
Completed
Parking Lot
150 Pierce St
Coptei
Completed
Pier Pavillion
7 Causeway Blvd
Completed
Prospect Lake Park
50 Prospect Land Rd
Completed
Public Services
nitRd: `
1650 N Arcturas Ave
Completed
Sand Key Bayside Park South
951 Gulf Blvd
Completed
Com
Sid Lickton Field / Fred Cournoyer Rec.
714 N Saturn Ave
Completed
Solid Waste Cmplx
1701 N Hercules Ave
Completed
Spring Lake Park
2152 Beecher Rd
Completed
Station Square Park
612 Cleveland St
Completed
Valencia Park
d Pse
2050 N Hercules Ave
Completed
WPC Plant - East
3141 Gulf to Bay Blvd
Completed
WPC Plant
WTP RO#2
21133 US Highway 19 N
Completed
Fleet Maintenance
Rseway
1900 Grand Ave
g - Phas
Pending - Phase 2
WPC Plant
Bayfront Tennis Cmplx
M
Pending - Phase 2
Clearwater Airpark
1000 N Hercules Ave
Pia
Pending - Phase 2
r Common
1 ul€ Blvd
Peecfng -
Coachman Park
301 Drew St
Pending - Phase 2
CPD - N. Greenwood
ending - Fila
1310 N Martin Luther King Jr Ave
Pending - Phase 2
- N'
it
Drew St. Dock
1709 Keene
210 Drew St
Pending - Phase 2
Park
Fire & Rescue Maint.
s
artin Luther King:
2150 Range Rd
Pending- P.h
Pending - Phase 2
Fire Sta #45
1140 Court St
Pending - Phase 2
47 +.
Fire Sta #48
460 l akeviet
Rd.
1700 N Belcher Rd
Pendtng•4
Pending - Phase 2
nding r•Pt`ta
Fire Sta #51
1720 Overbrook Ave
Pending - Phase 2
Oaks
Garden Ave. Pkng Ga.
498 S 4.lartln.Lutl r K ng Ave,
28 N Garden Ave
g-Pha.
Pending - Phase 2
Henry L. McMullen Tennis Cmplx
34 tour
1000 Edenville Ave
Pending Pha
Pending - Phase 2
Cmplx
Q. if
Memorial Park
258 Drew St
Pending - Phase 2
tke hture Park
2750 Park Trail Ln
Pencil
Morningside Pool
2400 Harn Blvd
Pending - Phase 2
Page 2 of 3
Facility Name
Address
Progress
NE 3
New Natural Gas Fueling Station
2190.N
Wien Booth Rd
1010 N Hercules Ave
Pending - Phase 2
Pending - Phase 2
P&R?
5
7!
Ave:
.in
,Phase 2 ,
Radio Tower
Behind 1420 S Missouri Ave
Pending - Phase 2
Rpt
Station Sq. Pkg Grge. ONLY
37 c useway:B#vd
628 Cleveland St
Pending- Phase 2
Pending - Phase 2
Tower
Just E
iirnice Or
Wood Valley Park
2816 Park Trail Ln
= Plta
Pending - Phase 2
P
WTP #3
2775 SR 580
lase 2
Pending - Phase 2
Page 3 of 3