AMENDMENT #1 - DISASTER DEBRIS REMOVAL AND DISPOSAL SERVICES - RFP #15-17 - ATTACHMENT AAmendment #1 - October 5, 2017
RFP #15-17 - Attachment A
Disaster Debris Removal and Disposal Services
NOTE: the Estimate Quantities are provided to facilitate an "event estimate" to evaluate proposals; extended line
costs are not required
Fee Schedule Part A: Services Unit Prices
Item
Description
Estimate
Quantity
Unit
` Unit Price
Al
Loading and hauling debris from public property and rights-of-way to
a debris management site (DMS)
60
Ton
$ 115.00
A2
Loading and hauling debris from public property, rights-of-way, or the
DM5, to a final disposal site
120
Ton
$ 135.00
A3
Debris reduction by chipping/grinding
40
Ton
$ 28.50
A4
Rights-of-way white goods removal
50
Per knit
$ 45.00
A5
Freon management and recycling
50
Per Unit
$ 45.00
A6
Animal carcass collection, hauling, and final disposal
5
Per Pound
$ 4.50
A7
Loading and hauling debris reduction by-products to a final disposal
site
100
Per Ton
$ 36.00
A8
Loading and hauling household hazardous waste to a final disposal
site
500
Per Pound
$ 12.00
A9
Hazardous stump removal 24" to 36.99" diameter
40
Each
$ 275.00
A10
Hazardous stump removal 37" to 48.99" diameter
20
Each
$ 355.00
All
Hazardous stump removal 49" and larger
5
Each
$ 425.00
Al2
Hazardous tree removal 6" to 12.99" diameter
320
Each
$ 95.00
A13
Hazardous tree removal 13" to 24.99" diameter
150
Each
$ 175.00
A14
Hazardous tree removal 25" to 36.99" diameter
40
Each
$ 225.00
A15
Hazardous tree removal 37" to 48.99" diameter
10
Each
$ 295.00
A16
Hazardoues tree removal 49" and larger
5
Each
$ 395.00
A17
Hazardous limbs larger than 2' diameter
6,000
Each
$ 70.00
A18
Clean, fill dirt - supply and delivery
100,000
Cubic Yard
$ 5.50
A19
Sand screening
100,000
Cubic Yard
$ 17.50
A20
Removal of electronic waste
100
Per Unit
$ 95.00
A21
Marine vessel removal
40
Linear Foot{
$ 250.00
A22
Vehicle removal
30
Per Unit
$ 250.00
A23
Land vessel removal
40
Linear Foot
$ 195.00
A24
Waterway debris removal
1
Ton
$ 455.00
A25
Hauling debris from DMS to final disposal 0-15 miles
300,000
Per Ton
$ 5.00
A26
Hauling debris from DMS to final disposal 15.1-30 mites
300,000
Per Ton
$ 7.00
A27
Hauling debris from DMS to final disposal 30.1-60 miles
300,000
Per Ton
$ 11.00
A28
Hauling debris from DMS to final disposal 60.1 -plus miles
300,000
Per Ton
$ 32.00
A29
Office trailer, temporary
1
Per Day
$ 175.00
OTHER SERVICES
Amendment #1 - October 5, 2017
RFP #15-17 - Attachment A
Disaster Debris Removal and Disposal Services
NOTE: the Estimate Quantities are provided to facilitate an "event estimate" to evaluate proposals; extended line
costs are not required
Fee Schedule Part B: Hourly Labor, Equipment, and Material Rates
Item
Description
tion
Estimate
Quantity
Unit
Unit Price
B1
Wheel loader with utility grapple, 1.5 CY, 95 HP
140
Per Hour
$ 120.94
82
Wheel loader with utility grapple, 3 CY, 152 HP
140
Per Hour
$ 138.68
B3
Wheel loader with utility grapple, 4 CY, 200 HP
140
Per Hour
$ 140.00
B5
Compact trackloader with utility grapple, 1,500 Ib.
140
Per Hour
$ 135.00
B6
Compact trackloader with utility grapple, 2,500 Ib.
140
Per Hour
$ 155.00
B7
Steer loader with street sweeper
300
Per Hour
$ 107.01
38
Tractor/grader with box blade or rake, minimum 30,000 Ib.
200
Per Hour
$ 65.00
B9
Log skidder
200
Per Hour
$ 175.00
810
04 dozer or equivalent
140
Per Hour
$ 98.00
B11
05 dozer or equivalent
140
Per Hour
$ 118.70
B12
06 dozer or equivalent
140
Per Hour
$ 131.61
B13
07 dozer or equivalent
140
Per Hour
$ 182.96
B14
D8 dozer or equivalent
140
Per Hour
$ 222.94
815
Hydraulic excavator, 1.5 CY with thumb
140
Per Hour
$ 125.00
B16
Hydraulic excavator, 2.5 CY with thumb
140
Per Hour
$ 150.00
817
Knuckleboom loader
200
Per Hour
$ 135.00
818
Hand -fed debris chipper
280
Per Hour
$ 45.00
819
800 - 1,000 HP tub grinder
280
Per Hour
$ 325.00
B20
30 ton crane
100
Per Hour
$ 195.00
B21
50 ton crane
140
Per Hour
$ 275.00
B22
100 ton crane
140
Per Hour
$ 425.00
B23
40 - 60' bucket truck
280
Per Hour
5 132.81
B24
Greater than 60' bucket truck
100
Per Hour
$ 165.00
B25
Fuel/service truck
280
Per Hour
$ 85.00
B26
Water truck, 2,500 gallon, non -potable
280
Per Hour
$ 111.32
627
Lowboy trailer with tractor
140
Per Hour
$ 65.00
B28
Flatbed truck
140
Per Hour
$ 19.00
B29
Pick-up truck, 1 tan
140
Per Hour
$ 12.00
B30
Self -loading dump truck with debris grapple
280
Per Hour
$ 135.00
B31
Single axle dump truck 5-12 cubic yard
280
Per Hour
$ 75.00
832
Tandem axle dump truck 16+/- cubic yard
140
Per Hour
$ 80.00
333
Tandem axle dump truck 20+/- cubic yard
140
Per Hour
$ 85.00
B34
Tandem axle dump truck 38+1- cubic yard
140
Per Hour
$ 105.00
B35
Power screen
200
Per Hour
$ 200.00
836
Stacking conveyor
200
Per Hour
$ 95.00
337
Chainsaw
200
Per Hour
$ 12.00
B38
Generator, 5.5 kW capacity
140
Per Hour
$ 55.00
B39
Generator, 200 kW capacity
140
Per Hour
$ 95.00
Amendment #1 - October 5, 2017
840
Generator, 2,500 kW capacity
140
Per Hour
$ 175.00
841
Light plant including fuel and support
280
Per Hour
$ 90.00
B42
Pump, 95 HP, minimum 25' Intake and 200' discharge including fuel
and support
pP
140
Per Hour
$ 175.00
843
Pump, 200 HP, minimum 25' intake and 200' discharge including fuel
and support
140
Per Hour
$ 225.00
B44
pump, 650 HP, minimum 25' intake and 200' discharge including fuel
and suport
140
Per Hour
$ 300'00
B45
Air curtain incinerator, self-contained
140
Per Hour
$ 52.00
846
Mobile command and communications trailer
240
Per Hou r
$ 125.00
847
Laborer, small hand tools, traffic control fiagger
200
Per Hour
$ 30.00
848
Skilled sawman
200
Per Hour
$ 55.00
B49
Crew Foreman with cell phone, truck and miscellaneous tools
240
Per Hour
$ 50.00
850
Operations Manager with cell phone, truck and misc. tools
240
Per Hour
$ 120.00
851
Tree climber
200
Per Hour
$ 85.00
B52
Security personnel, bonded and certified
240
Per Hour
$ 45.00
OTHER HOURLY LABOR, EQUIPMENT, AND MATERIAL
Attachment A Fee Schedule Modified October 5, 2017
(adopted from Pinellas County RFP 156-0491-P(JA))
Vegetative Collect and Haul 0-60+ miles
from right-of-way (ROW) to Debris Management Site (DMS)
Construction and Demolition Debris Collect and Haul
0-60+ miles from ROW to DMS
Final Disposal from DMS to Final Disposal Location
0-15 miles from DMS to Final Disposal Location
16-30 miles from DMS to Final Disposal Location
31-60 miles from DMS to Final Disposal Location
60+ miles from DMS to Final Disposal Location
Waterway Debris Removal ca rivers, creeks, streams)
on and Screening
agement and Reduction - Grinding
Inc.
4iai11//�
lei
• 4
y )a; i44 e«Wied4W4
Countersigned: LI
ceor QNer C O $
George N.
Mayor
Appr
441k Soo
Assistant City Attorney
CY $ 7.75
CY $ 7.60
CY
CY
CY
CY
CY
CY
CY
CITY OF CLEARWATER, FLORIDA
By:
2.65
3.25
4.25
6.40
25.00
8.00
2.40
William S. Horne II
City Manager