Loading...
AMENDMENT #1 - DISASTER DEBRIS REMOVAL AND DISPOSAL SERVICES - RFP #15-17 - ATTACHMENT AAmendment #1 - October 5, 2017 RFP #15-17 - Attachment A Disaster Debris Removal and Disposal Services NOTE: the Estimate Quantities are provided to facilitate an "event estimate" to evaluate proposals; extended line costs are not required Fee Schedule Part A: Services Unit Prices Item Description Estimate Quantity Unit ` Unit Price Al Loading and hauling debris from public property and rights-of-way to a debris management site (DMS) 60 Ton $ 115.00 A2 Loading and hauling debris from public property, rights-of-way, or the DM5, to a final disposal site 120 Ton $ 135.00 A3 Debris reduction by chipping/grinding 40 Ton $ 28.50 A4 Rights-of-way white goods removal 50 Per knit $ 45.00 A5 Freon management and recycling 50 Per Unit $ 45.00 A6 Animal carcass collection, hauling, and final disposal 5 Per Pound $ 4.50 A7 Loading and hauling debris reduction by-products to a final disposal site 100 Per Ton $ 36.00 A8 Loading and hauling household hazardous waste to a final disposal site 500 Per Pound $ 12.00 A9 Hazardous stump removal 24" to 36.99" diameter 40 Each $ 275.00 A10 Hazardous stump removal 37" to 48.99" diameter 20 Each $ 355.00 All Hazardous stump removal 49" and larger 5 Each $ 425.00 Al2 Hazardous tree removal 6" to 12.99" diameter 320 Each $ 95.00 A13 Hazardous tree removal 13" to 24.99" diameter 150 Each $ 175.00 A14 Hazardous tree removal 25" to 36.99" diameter 40 Each $ 225.00 A15 Hazardous tree removal 37" to 48.99" diameter 10 Each $ 295.00 A16 Hazardoues tree removal 49" and larger 5 Each $ 395.00 A17 Hazardous limbs larger than 2' diameter 6,000 Each $ 70.00 A18 Clean, fill dirt - supply and delivery 100,000 Cubic Yard $ 5.50 A19 Sand screening 100,000 Cubic Yard $ 17.50 A20 Removal of electronic waste 100 Per Unit $ 95.00 A21 Marine vessel removal 40 Linear Foot{ $ 250.00 A22 Vehicle removal 30 Per Unit $ 250.00 A23 Land vessel removal 40 Linear Foot $ 195.00 A24 Waterway debris removal 1 Ton $ 455.00 A25 Hauling debris from DMS to final disposal 0-15 miles 300,000 Per Ton $ 5.00 A26 Hauling debris from DMS to final disposal 15.1-30 mites 300,000 Per Ton $ 7.00 A27 Hauling debris from DMS to final disposal 30.1-60 miles 300,000 Per Ton $ 11.00 A28 Hauling debris from DMS to final disposal 60.1 -plus miles 300,000 Per Ton $ 32.00 A29 Office trailer, temporary 1 Per Day $ 175.00 OTHER SERVICES Amendment #1 - October 5, 2017 RFP #15-17 - Attachment A Disaster Debris Removal and Disposal Services NOTE: the Estimate Quantities are provided to facilitate an "event estimate" to evaluate proposals; extended line costs are not required Fee Schedule Part B: Hourly Labor, Equipment, and Material Rates Item Description tion Estimate Quantity Unit Unit Price B1 Wheel loader with utility grapple, 1.5 CY, 95 HP 140 Per Hour $ 120.94 82 Wheel loader with utility grapple, 3 CY, 152 HP 140 Per Hour $ 138.68 B3 Wheel loader with utility grapple, 4 CY, 200 HP 140 Per Hour $ 140.00 B5 Compact trackloader with utility grapple, 1,500 Ib. 140 Per Hour $ 135.00 B6 Compact trackloader with utility grapple, 2,500 Ib. 140 Per Hour $ 155.00 B7 Steer loader with street sweeper 300 Per Hour $ 107.01 38 Tractor/grader with box blade or rake, minimum 30,000 Ib. 200 Per Hour $ 65.00 B9 Log skidder 200 Per Hour $ 175.00 810 04 dozer or equivalent 140 Per Hour $ 98.00 B11 05 dozer or equivalent 140 Per Hour $ 118.70 B12 06 dozer or equivalent 140 Per Hour $ 131.61 B13 07 dozer or equivalent 140 Per Hour $ 182.96 B14 D8 dozer or equivalent 140 Per Hour $ 222.94 815 Hydraulic excavator, 1.5 CY with thumb 140 Per Hour $ 125.00 B16 Hydraulic excavator, 2.5 CY with thumb 140 Per Hour $ 150.00 817 Knuckleboom loader 200 Per Hour $ 135.00 818 Hand -fed debris chipper 280 Per Hour $ 45.00 819 800 - 1,000 HP tub grinder 280 Per Hour $ 325.00 B20 30 ton crane 100 Per Hour $ 195.00 B21 50 ton crane 140 Per Hour $ 275.00 B22 100 ton crane 140 Per Hour $ 425.00 B23 40 - 60' bucket truck 280 Per Hour 5 132.81 B24 Greater than 60' bucket truck 100 Per Hour $ 165.00 B25 Fuel/service truck 280 Per Hour $ 85.00 B26 Water truck, 2,500 gallon, non -potable 280 Per Hour $ 111.32 627 Lowboy trailer with tractor 140 Per Hour $ 65.00 B28 Flatbed truck 140 Per Hour $ 19.00 B29 Pick-up truck, 1 tan 140 Per Hour $ 12.00 B30 Self -loading dump truck with debris grapple 280 Per Hour $ 135.00 B31 Single axle dump truck 5-12 cubic yard 280 Per Hour $ 75.00 832 Tandem axle dump truck 16+/- cubic yard 140 Per Hour $ 80.00 333 Tandem axle dump truck 20+/- cubic yard 140 Per Hour $ 85.00 B34 Tandem axle dump truck 38+1- cubic yard 140 Per Hour $ 105.00 B35 Power screen 200 Per Hour $ 200.00 836 Stacking conveyor 200 Per Hour $ 95.00 337 Chainsaw 200 Per Hour $ 12.00 B38 Generator, 5.5 kW capacity 140 Per Hour $ 55.00 B39 Generator, 200 kW capacity 140 Per Hour $ 95.00 Amendment #1 - October 5, 2017 840 Generator, 2,500 kW capacity 140 Per Hour $ 175.00 841 Light plant including fuel and support 280 Per Hour $ 90.00 B42 Pump, 95 HP, minimum 25' Intake and 200' discharge including fuel and support pP 140 Per Hour $ 175.00 843 Pump, 200 HP, minimum 25' intake and 200' discharge including fuel and support 140 Per Hour $ 225.00 B44 pump, 650 HP, minimum 25' intake and 200' discharge including fuel and suport 140 Per Hour $ 300'00 B45 Air curtain incinerator, self-contained 140 Per Hour $ 52.00 846 Mobile command and communications trailer 240 Per Hou r $ 125.00 847 Laborer, small hand tools, traffic control fiagger 200 Per Hour $ 30.00 848 Skilled sawman 200 Per Hour $ 55.00 B49 Crew Foreman with cell phone, truck and miscellaneous tools 240 Per Hour $ 50.00 850 Operations Manager with cell phone, truck and misc. tools 240 Per Hour $ 120.00 851 Tree climber 200 Per Hour $ 85.00 B52 Security personnel, bonded and certified 240 Per Hour $ 45.00 OTHER HOURLY LABOR, EQUIPMENT, AND MATERIAL Attachment A Fee Schedule Modified October 5, 2017 (adopted from Pinellas County RFP 156-0491-P(JA)) Vegetative Collect and Haul 0-60+ miles from right-of-way (ROW) to Debris Management Site (DMS) Construction and Demolition Debris Collect and Haul 0-60+ miles from ROW to DMS Final Disposal from DMS to Final Disposal Location 0-15 miles from DMS to Final Disposal Location 16-30 miles from DMS to Final Disposal Location 31-60 miles from DMS to Final Disposal Location 60+ miles from DMS to Final Disposal Location Waterway Debris Removal ca rivers, creeks, streams) on and Screening agement and Reduction - Grinding Inc. 4iai11//� lei • 4 y )a; i44 e«Wied4W4 Countersigned: LI ceor QNer C O $ George N. Mayor Appr 441k Soo Assistant City Attorney CY $ 7.75 CY $ 7.60 CY CY CY CY CY CY CY CITY OF CLEARWATER, FLORIDA By: 2.65 3.25 4.25 6.40 25.00 8.00 2.40 William S. Horne II City Manager