GREENLEA-OTTEN NEIGHBORHOOD TRAFFIC CALMING & OTTEN ST ROADWAY & STORMWATER IMPROVEMENT PROJECT - 10-0003-EN - ADMINISTRATIVE CHANGE ORDER #3
Administrative Change Order 3 Date: July 19, 2017 PROJECT: Greenlea -Otten Neighborhood Traffic Calming & Otten Roadway & Stormwater Improvements CONTRACTOR: David Nelson Construction Co. 3483 Alt 19 Palm Harbor, Fl 34683 PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: CODE A: CODE B: CODE C: 10- 0003 -EN ST112763 April 7, 2016 April 20, 2016 0315- 92276 - 563700 -541- 000 -0000 0315- 96169 - 563700 -539- 000 -0000 0315- 92277 - 563700 -541- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing, increasing and adding items in accordance with field conditions - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council - 10/5/2016 Admin Change Order 2 - City Manager - 3/21/2017 Administrative Change Order 3 - City Manager NEW CONTRACT AMOUNT ACCEPTED BY: $ 3,071,486.83 $685,440.00 By: ) �� $22,602.40 David Vekasi $ (71,035.30) $ 3,708,493.93 Rosemarie Call, Date: �u d C D-0(7 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA L,0 AitiA. Aii-wk,z_ William B. Horne, II City Manager APPROVED AS 0 ORM: Smith, Assistant City Attorney Davi'�lelsonoiulti uutioii i~'No (Seale) PreSideht Date: C ci / \( / l Witnesses: (two) e ji ) .k Recommended By: City of Clearwater 1E, Tara Kivett, Construction Manager Michael D. Qu' n, PE, City Engineer Page 2 of 3 Administrative Change Order 3: Greenlea Otten Neighborhood Traffic Calming &Otten Roadway &Stormwater Impr M DESCRIPTION UNIT Otv UNIT COST TOTAL COST Code A: Decreases: 13 Relocate water meter EA 8 $ 450.00 $ (3,600.00) 14 Fire hydrant removal EA 1 $ 950.00 $ (950.00) 15 Tree removal EA 3 $ 360.00 $ (1,080.00) 17 Mill asphalt pavement, 1.5 -inch SY 1,252 $ 4.00 $ (5,008.00) 19 Sign removal EA 5 $ 50.00 $ (250.00) 39 Underdrain, 6 -inch (Contingency) LF 40 $ 20.00 $ (800.00) 40 Underdrain, 8 -inch (Contingency) LF 50 $ 21.00 $ (1,050.00) 46 6" Ductile Iron Pipe (UD) LF 74 $ 55.00 $ (4,070.00) 47 16" Ductile Iron Pipe (WM) LF 60 $ 225.00 $ (13,500.00) 48 16" Pipe Restraint (Megalug) EA 9 $ 550.00 $ (4,950.00) 49 16" Double Line Stop Assembly w /(2) 12 "- EA 1 $ 30,000.00 $ (30,000.00) 150# By -Pass Assembly Adapters 50 8" Ductile Iron Pipe (Protecto 401) LF 120 $ 145.00 $ (17,400.00) 51 Fire Hydrant Assembly EA 1 $ 3,250.00 $ (3,250.00) 52 Adjust Manhole EA 5 $ 400.00 $ (2,000.00) 53 Adjust water valve box EA 2 $ 400.00 $ (800.00) 54 Adjust water meter EA 2 $ 500.00 $ (1,000.00) 85 Water Meter Assembly - Reclaimed EA 7 $ 300.00 $ (2,100.00) 86 Water Meter /Backflow Preventor Assembly - EA 17 $ 500.00 $ (8,500.00) Potable 88 Utility Allowance LS 0.36972 $ 50,000.00 $ (18,486.00) 89 Contignency LS 0.037390183 235,430.78 $ (8,802.80) Total (Decreases) for Code A: $ (127,596.80) Increases: 1 Mobilization/Demobilization LS # # # # # ##### $ 85,000.00 $ 20,020.00 16 Mill asphalt pavement, 1 -inch SY 20 $ 20.00 $ 400.00 27 Asphalt Speed Table EA 1 $ 4,000.00 $ 4,000.00 38 FDOT valley gutter LF 1 $ 33.00 $ 33.00 63 Thermoplastic overlay pattern" YBR" SF 340 $ 22.00 $ 7,480.00 69 Sign Assembly AS 10 $ 220.00 $ 2,200.00 Total Increases for Code A: $ 34,133.00 Additions: 151 Speed hump EA 2 $ 3,900.00 $ 7,800.00 152 Remove table and install hump EA 1 $ 8,950.00 $ 8,950.00 153 Chevron pavement markings EA 66 $ 60.00 $ 3,960.00 154 Mill asphalt pavement, 1.5 -inch SY 5,749 $ 3.00 $ 17,247.00 155 1 " -1.5" asphalt pavement (Type SP12.5) TON 487.1 $ 108.00 $ 52,606.80 156 Asphalt leveling course, type SP9.5 TON 23 $ 125.00 $ 2,900.00 Total Additions for Code A: $ 93,463.80 Total Net (Decreases)/Increases /Additions to Code A: $ 0.00 Page 3 of 3 Administrative Change Order 3: Greenlea Otten Neighborhood Traffic Calming &Otten Roadway &Stormwater Impri M DESCRIPTION UNIT Q yt UNIT COST TOTAL COST Code B: Decreases: 107 Underdrain, 6 -inch (Contingency) LF 250 $ 20.00 $ (5,000.00) 108 Underdrain, 8 -inch (Contingency) LF 250 $ 22.00 $ (5,500.00) 126 6" Water Valve (Contingency) EA 4 $ 1,800.00 $ (7,200.00) 129 6" Line Stop By -Pass Assembly EA I $ 2,200.00 $ (2,200.00) 133 UTILITY ALLOWANCE LS 1 $ 50,000.00 $ (50,000.00) 134 Contingency LS 1 $ 43,795.30 $ (43,795.30) Total (Decreases) for Code B: $ (113,695.30) Increases: 118 CLW Type A Wing (4') Inlet EA 4 $ 3,950.00 $ 15,800.00 127 6" Pipe Restraint (Megalug) EA 2 $ 195.00 $ 390.00 128 6" Line Stop Assembly EA 1 $ 4,450.00 $ 4,450.00 Total Increases for Code B: $ 20,640.00 Additions: 146 Offset 12" RCWM on Otten St. LS 1 $ 22,020.00 $ 22,020.00 Total Additions for Code B: $ 22,020.00 Total Net (Decreases) /Increases /Additions to Code B: $ (71,035.30) Total Net (Decreases) /Increases /Additions to the Contract: $ (71,035.30)