Loading...
MSB LOBBY AND CUSTOMER SERVICE REMODELING - PROJECT CC-1704 - PROPOSAL FOR CONSTRUCTION MANAGER AT RISK PROJECTSTRUCTIO fiA14 1AV6 ADDRESS 0 BOX 13107 ,XICO. BEACU, FL 32410 PHYE}CAL ADO S: #03 N 38TH STREET MEXICO BEACH, FL 82456' TOLL -FREE 844 - 648 - 5100'' PHONE 650.64£3.5100' FAX 850.648.5105 EWTRAL FLORIDA OFFICE MAILING ADDR£6s P '0 BOX 86 INDIAN ROCRB, FL 33785 ICENSE NUMBERS -, D81971 Cf9C522591..:: CUCI 248$8 49418 Proposal for Construction Manager at Risk Project Date 3/28/17 Revision #3 (if needed) TO: Mr. Tom Wojtkiw City of Clearwater - Superintendent, Building and Maintenance Department 1900 Grand Ave Clearwater, FL 33765 RE: MSB Lobby and Customer Service Remodeling Project CC -1704 Per your request, enclosed is the proposal for all work shown in the Construction Documents prepared by Fowler and Associates labeled "Preliminary Oct 31 `16" consisting of sheets A1.1.1, A1.1.2, A1.1.3 and CS -1.1. We have prepared this proposal for a Guaranteed Maximum Price of $165, 396.45. Scope of Work: See attached Narrative Cost Detail: Description Amount Cost of Work $129,408.75 Subtotal $129,408.75 General Conditions (or General Conditions /Supervision/Insurance /Bond) $11,794.33 Construction Management Fee $9307.15 Contingency 10% $14,886.22 Guaranteed Maximum Price $165,396.45 If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, 1 CONSTRUCT: AIN 0 MAILING ADDtt68a: P 13107 ExICO •SEACH, FL 32410 PHYSICAL ADDRESS: 103 N 30TH STREET N16x1 COS EACH, FL 32456 TOLL -FREE 844-6 PHONE 850.648.51 FAX 850.648.510 CENTRAL , ORU A OFF1C MAILING ADDRESS: P 0 sox 86 INDIAN ROCK$• FL 3370 FL: "CGCO6 t 971 CI 91 UCI24896 AL: 4341& a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Thank you for the opportunity. We value great relationships with our clients. Cathey Construction and Development, LLC By: P Countersigned: FLORIDA _ ct (er\er eft kas George N. Cretekos Mayor 'emy Easen itle: Vice President CITY OF CLEARWATER, By: William B. Horne II City Manager Attest: (1 (,U Ma ew M. •` th -I=tir = Rosemari Call Assistant City Attorney 2 Clearwater Municipal Services Building Renovations Municipal Services Building Casework and Transaction Window Replacement GMP Narrative March 31, 2017 BRIGHT AND lir ki Tlrll. • RAY TO REACI I CATHEY CONSTRUCTION The following Project Narrative outlines our GMP considerations and approach to the renovation of the second of the MSB office renovation as detailed in the provided Construction Documents. Our estimate is based upon the Construction Documents prepared by Fowler Architects Associates and includes only documents A- 1.1.1, A- 1.1.2, A- 1.1.3, and CS -1.1, all labeled preliminary October 31, 2016. The additional proposal for the storefront system in the lobby is based on drawing A- 1.1.3.1 labeled Preliminary September 1, 2016. No specifications were provided beyond those listed on the above sheets. GENERAL CLARIFICATIONS 1. Comprehensive General Liability and Umbrella Excess Liability Insurances are included. 2. Builder's Risk Insurance and deductibles are excluded. General Risk coverage is provided by Owner and Permit is assumed to be a zero fee. 3. A Payment and Performance Bond is included 4. We have not included consumption charges for any temporary utilities (water, electric, etc). This is to be provided by Owner. All sales tax is included. 5. Warranties shall commence on the date of project substantial completion, this includes any extended warranties as stated in the project specifications. 6. Asbestos survey to be provided by Owner prior to commencement. 1 CONSTRUCTION GENERAL CONDITIONS & REQUIREMENTS 1. Items included in General Conditions are as follows: a. Competent project management and supervision including after normal working hours if required. b. Experienced and competent construction support staff and management of shop drawings /submittals and invoice /payment processing. c. Staff necessary to monitor quality control and safety. d. Document plotting and reproduction e. Future plan submission and receipt of required permits. f. Vehicles, vehicle insurance, maintenance and fuel required 2. Items included in the General Requirements are as follows: a. Protection of existing surfaces, finishes and structures. Additional budgeting has been allotted for extra care of the computer equipment and personal effects in the work area. Owner to remove all personal and business belongings from casework to be replaced and to allow for removal of existing glazing. b. Required safety equipment for OSHA compliance. c. Secure storage of materials and equipment d. Dust control measures, protection of surrounding work spaces, and prevention e. Removal of debris DEMOLITION 1. Interior selective demolition included per the contract documents to include existing casework, countertops and glass systems. 2. Modification of gypsum wall systems as indicated on drawings. 3. All work to be in accordance with applicable codes and regulatory agencies. 4. Any specialty trade demolition to be performed by contracted firms performing installation scopes. CONCRETE 1. None included MASONRY 1. None included 2 STRUCTURAL STEEL & MISCELLANEOUS METALS 1. None included. WOOD /PLASTICS /COMPOSITES 1. As required for installation of casework or door frames. 2. Casework as shown in documents. Laminate tops on all in business area, quartz tops at transaction counters. THERMAL & MOISTURE PROTECTION 1. None included DOORS & WINDOWS 1. Base bid includes upgrades to a smart glass system, proposed as LC privacy glass as shown on the drawings. No specifications were provided listing approved products. 2. Installation of new hollow metal welded frame, door and hardware in conference room. Door and frame to be rated for one hour protection and match wood finish and hardware to the best effort. FINISHES 1. Framing and drywall modifications as indicated. 2. Minor touch up of incidental damaged drywall and replacement of cove base where indicated. MISCELLANEOUS SPECIALTIES 1. Counter mounted transaction deal trays located in quartz tops. EQUIPMENT 1. A total of 18 wireless headsets by Norcon Communications are included. We have included in this price an upgrade from the Construction Documents for the Norcon TTU -1DJ which is a rechargeable speaker unit that does not have the visible wire raceway. The user charges both it and the headset at the end of each shift. FURNISHINGS 1. None included. SPECIAL CONSTRUCTION 1. None included. CONVEYING SYSTEMS 1. None included. FIRE PROTECTION 1. None 3 PLUMBING 1. None included. HVAC 1. None included. ELECTRICAL 1. It is understood that the current electrical service is in a suitable location and of sufficient power for the speakers and headset charging requirements. 2. We have included the cost of adding switching to the smart glass panels to be controlled by a master switch. As this is not shown on the drawings, the details are to be agreed upon prior to construction. EXCLUSIONS 1. Cost of permit. 2. Asbestos study. 3. Fire sprinkler or life safety systems. 4. Unforeseen repairs or mold remediation caused by others. 5. It is understood that the nature of the required Work is both invasive and disruptive, including induced construction noise and space use interruptions. We have planned for after -hours work for the entire scope. It is understood that if possible, with the owner's permission, we may schedule Tess disruptive work during regular working hours as this can expedite the schedule. It is understood that Cathey Construction will schedule delivery of materials and commence work so as to minimize the amount of time City employees are displaced. END OF PROJECT NARRATIVE 4 item Description 1 General Requirements Value 2 Smart Glass and Glazing System $ 3 Casework/Tops Complete $ 4 Framing /DrywalUPainting/Electrica $ Allowance br one 1 hour doors $ 5 Lobby Storefront $ Allowance br Headsets /Speakers $ 11 Owner's Contingency $ 6 Direct Construction Cost Total $ 7 General Conditions $ 8 Payment and Performance Bond $ g General & Excess Libility lnsuranc $ 10 Builders Risk Coverage $ 12 CM Fee 6% $ 13 Management Costs Subtotal $ 14 Construction Subtotal 165,386.445 JOB COST SUMMARY 9,118.75 44,300.00 34,801.00 10,500.00 1,600.00 15,164.00 13,925.00 14,886.21 144,294.96 7,220.00 2,951.18 1,623.15 9,307.15 21,101.48 Grand Total Comments/Notes Sub 5.51% Protection of space, safety, allowances 26.78% Includes Demo 21.04% Includes Tops & Demo & Allowance for Add 6.35% Material, labor, installation 0.97% Material, labor, installation, paint 9.17% 8.42% 9.00% Unused Portion Returned to Owner 87.24% 4.37% Supervision, burden, office staff, vehicles 1.78% 0.98% 0.00% NIC 5.63% 12.76% 100.00% Glass Distinc Self Pr Self Pr 5