Loading...
04/25/2017 - SpecialTuesday, April 25, 2017 9:00 AM City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 Council Chambers City Council Special Meeting Agenda Special Council Meeting April 25, 2017City Council Special Meeting Agenda Welcome. We are glad to have you join us. If you wish to speak, please wait to be recognized, then state your name and address. Persons speaking before the City Council shall be limited to three (3) minutes unless otherwise noted under Public Hearings. For other than Citizens to be heard regarding items not on the Agenda, a spokesperson for a group may speak for three (3) minutes plus an additional minute for each person in the audience that waives their right to speak, up to a maximum of ten (10) minutes. Prior to the item being presented, please obtain the needed form to designate a spokesperson from the City Clerk (right-hand side of dais). Up to sixty minutes of public comment will be allowed for an agenda item. No person shall speak more than once on the same subject unless granted permission by the City Council. The City of Clearwater strongly supports and fully complies with the Americans with Disabilities Act (ADA). Please advise us at least 48 hours prior to the meeting if you require special accommodations at 727-562-4090. Assisted Listening Devices are available . Kindly refrain from using cell phones and other electronic devices during the meeting. 1. Call to Order 2. Citizens to be heard re items not on the agenda 3. City Manager Reports 3.1 Annual Strategic Planning Session 3.2 Financial Overview 3.3 Approve establishment of new Water and Sewer Fund capital projects and transfers to provide project funding. 3.4 Discussion of Department of Economic Opportunity pilot study on vulnerability analysis and adaptation planning. 3.5 Support the proposed extension of the one-cent local government infrastructure surtax, otherwise known as the Penny for Pinellas, and adopt Resolution 17-17. 3.6 Provide an update on the status of the Imagine Clearwater Plan and establish capital improvement project 315-94892, Imagine Clearwater Implementation, to be funded with $500,000 of General Fund revenues. 3.7 Council discussion topics 4. City Attorney Reports 5. Closing comments by Councilmembers (limited to 3 minutes) 6. Closing Comments by Mayor 7. Adjourn Page 2 City of Clearwater Printed on 4/21/2017 April 25, 2017City Council Special Meeting Agenda Page 3 City of Clearwater Printed on 4/21/2017 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3397 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: ReportIn Control: City Council Agenda Number: 3.1 SUBJECT/RECOMMENDATION: Annual Strategic Planning Session SUMMARY: City Council Policy “M” states: “Prior to June 1st of each year and prior to the development of the City Manager’s proposed budget, the City Council shall meet in a strategic planning session(s) to review the five-year financial forecast and update as necessary, the City’s Vision, Mission and Strategic Direction (Goals). From these documents a five-year strategic plan will be updated.” In October 2016, City Council clarified the above policy to complete the strategic planning session as a pre-budget exercise. Consistent with same, staff is providing a proposed 2018-2023 Strategic Plan for coming Fiscal Year 2017-18 as will eventually be published in the newly adopted budget in October. Staff has modified the proposed Strategic Plan from the Fiscal Year 2016-17 Fiscal Year version as described below. Deleted items as complete or that will be complete by FY 2017-18 Budget adoption, modified items that have changed focus or been re-titled and added items that are new: Completed/Deleted Items Strategic Objective Pelican Walk Garage Increase Economic Opportunity Branding Rollout - Sparxoo Develop and Promote our Brand New Website Develop and Promote our Brand Moccasin Lake Master Plan Foster Community Engagement Island Estates Bridges Quality Police Firing Range - Penny III Public Safety P25 Radio Program Public Safety Original Item with Proposed Re-Title Strategic Objective Brighthouse Spectrum Complex Diversify the Economic Base Airpark Master Plan and Terminal Building Increase Economic Opportunity East Gateway Vision Plan Foster Community Engagement Neighborhoods Engagement Public Spaces Strategy Placemaking Manual Foster Community Engagement Performance Measurement Management Quality ERP/Financial System Replacement Financial Responsibility Page 1 City of Clearwater Printed on 4/21/2017 File Number: ID#17-3397 Proposed New Items Strategic Objective Separate Box for Second Century Priorities Diversify the Economic Base CRA Incentives to increase occupancy rates Diversify the Economic Base Hercules/Belcher Industrial Area Diversify the Economic Base Clearwater Business SPARK Increase Economic Opportunity Support Co-Working Business Incubator Increase Economic Opportunity Tourism Contract Develop and Promote our Brand Regional ED Marketing Develop and Promote our Brand New Website DowntownClearwater.com Develop and Promote our Brand Internal Service Survey Quality Staff seeks any direction to modify or identify additional priorities within the five-year strategic plan for the upcoming annual budget process. APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 2 City of Clearwater Printed on 4/21/2017 Clearwater will be a uniquely beautiful and vibrant community:  That is socially and economically diverse;  That invests for the future; and  That is a wonderful place to live, learn, work, visit and play  Foster Industry Sectors  Maintain a business-friendly environment  Recognize transit oriented development  Engage neighborhoods and the business community to: o Create our economic development identity o Communicate that identity effectively  Ensure that our residents and visitors are familiar with the whole offering of community amenities  Optimize use of employees, assets and resources  Encourage teamwork across departments  Access public-private organizations and resources  Proactively maintain and reinvest in our infrastructure  Continuously measure and improve our performance  Reinforce standing as a safe community  Continue community policing  Ensure timely emergency preparation, response and recovery  Continue responsible financial management  Evaluate additional funding options  Set priorities and spend money aligned with Strategic Direction  Develop Downtown and US 19  Housing stock that matches need  Expand nonresidential tax base  Fulfill Beach by Design  Maintain tourism commitment, including Sports Tourism  ED Strategic Plan •  Airpark Master Plan*  PSTA – Times Property Plan  Downtown Parking Garage  Co-Working Business Incubator  Library Maker Spaces •  Clearwater Business SPARK •  Encourage neighborhood identity programs  Prevent blight and support property values through code enforcement  Preserve community history and culture  Support community events  Support healthy community initiatives  Tourism Contract  My Clearwater Magazine *  New Downtown Clearwater Website  Regional ED Marketing • City of Clearwater – Strategic Plan (2018-2023) Vision The Mission of the City of Clearwater is to:  To provide cost effective municipal services and infrastructure; and;  Facilitate development of the economy; To support a high quality of life and experience Mission Increase Economic Opportunity Develop and Promote our Brand Quality Efficiency Financial Responsibility Safety Facilitate Development of the Economy: Strategic Direction Provide Cost Effective Municipal Services and Infrastructure: Diversify the Economic Base  US 19 Corridor Plan •  2nd Century Clearwater  Spectrum Complex  CRA Incentives – Occupancy Rates  Hercules/Belcher Industrial Area • Priorities Priorities Priorities Priorities  New Fire Stations – Penny III  DEO Grant – Resiliency Pilot  Comprehensive Emergency Management Plan Update  PD District 3 Substation  Budget and CAFR *  Penny IV CIP *  BP Funding  Financial System Replacement  Rate Studies *  Performance Management *  Morningside Rec Center  Beach Marina Reconstruction  New City Hall  IT Strategic Plan *  Gas – Pinellas Campus  Groundwater Replenishment  Citizens Survey *  Placemaking Manual  Bicycle Paths & Trails * Priorities Priorities Priorities NOTE: The priorities listed are in addition to the on-going repair, maintenance and replacement of equipment, facilities and properties that support day -to-day operations and infrastructure. The priorities listed are in addition to day-to-day operations, services and programming throughout the City. Projects listed are identified because of the resources requir ed or because they are generally not expected to recur over a minimum, five-year planning horizon unless otherwise noted by an asterisk, in which instance they are on-going initiatives or have components that will continue through the planning period. Foster Community Engagement Priorities 2nd Century Clearwater  N. Marina Master Plan  Imagine Clearwater  Gateway Vision Plan *  Boating Plan • ED Strategic Plan Items * Recurring Work Items Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3415 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: ReportIn Control: City Council Agenda Number: 3.2 SUBJECT/RECOMMENDATION: Financial Overview SUMMARY: Review of General Fund and Utility Fund forecasts. Page 1 City of Clearwater Printed on 4/21/2017 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Property tax revenues 44,384,830$ 47,269,844$ 50,106,035$ 52,611,336$ 54,978,846$ 57,178,000$ Other revenues: Utility taxes 14,717,600 15,059,300 15,410,400 15,771,100 16,141,800 16,522,700 Communications svcs taxes 4,965,400 4,965,400 4,965,400 4,965,400 4,965,400 4,965,400 Other taxes 2,135,000 2,135,000 2,135,000 2,135,000 2,135,000 2,135,000 Licenses, permits, & fees 2,372,250 2,442,000 2,513,900 2,587,900 2,664,100 2,742,600 Franchise fees 10,280,100 10,376,600 10,474,100 10,572,500 10,671,900 10,772,300 Intergovernmental - state 13,952,700 14,236,400 14,526,200 14,822,400 15,125,100 15,434,400 Intergovernmental - local 7,987,120 8,066,100 8,145,900 8,226,500 8,307,800 8,390,000 Charges for services 15,988,040 16,513,112 16,936,684 17,315,300 17,706,200 18,109,900 Fines 950,400 968,200 986,300 1,005,000 1,023,900 1,043,300 Investment earnings 525,000 560,504 688,391 861,898 957,126 1,025,193 Miscellaneous revenues 1,461,180 1,499,000 1,537,800 1,577,700 1,618,900 1,661,200 Total other revenues 75,334,790 76,821,616 78,320,075 79,840,698 81,317,226 82,801,993 Total General Fund revenues 119,719,620 124,091,460 128,426,110 132,452,034 136,296,072 139,979,993 General Fund expenditures: Salaries & benefits 83,891,596 87,296,051 90,646,842 94,044,523 97,599,865 101,324,062 Operating expenditures 35,174,895 36,211,136 37,165,543 38,089,562 39,036,144 40,006,344 Non-operating expenditures 9,010,400 8,434,293 6,537,180 5,877,806 6,070,459 6,739,626 Total General Fund expenditures 128,076,891 131,941,480 134,349,565 138,011,891 142,706,468 148,070,032 General Fund transfer in 10,276,910 10,491,900 10,713,200 10,941,100 11,175,800 11,417,400 General Fund transfers out (1,061,069) (1,116,895) (1,174,771) (1,234,720) (1,293,698) (1,353,706) Net Income 858,570$ 1,524,985$ 3,614,974$ 4,146,523$ 3,471,706$ 1,973,655$ Unrestricted reserves 34,101,159$ 35,626,144$ 39,241,118$ 43,387,641$ 46,859,347$ 48,833,002$ Less required reserves (8.5% of total exp)11,198,901 11,538,840 11,752,624 12,075,370 12,487,566 12,957,874 Reserves in excess of policy minimum 22,902,258$ 24,087,304$ 27,488,494$ 31,312,271$ 34,371,781$ 35,875,128$ General Fund Pro Forma Projections Per Rate Study Updated for Actual Reserve Balances as of 9/30/2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Water & Sewer rate revenues 74,757,442$ 77,354,679$ 80,043,972$ 82,828,637$ 85,712,112$ 88,697,959$ Other operating revenues 2,133,183 2,133,183 2,133,183 2,133,183 2,133,183 2,133,183 Total operating revenues 76,890,625 79,487,862 82,177,155 84,961,820 87,845,295 90,831,142 Less: Personal services (13,502,502) (13,821,945) (14,111,515) (14,453,732) (14,749,866) (15,124,633) Less: Purchased water (4,287,346) (4,378,969) (2,262,711) (2,302,309) (2,342,599) (2,383,595) Less: O&M expenses (28,133,247) (29,033,561) (31,216,045) (33,409,267) (34,874,166) (35,626,267) Net Operating Income 30,967,530 32,253,387 34,586,884 34,796,512 35,878,664 37,696,647 Non-Operating Income/(Expense): Interest earnings 483,994 789,288 608,162 1,129,326 1,144,696 1,239,590 Debt service (13,616,020) (17,698,880) (18,687,632) (18,145,262) (18,938,701) (19,849,114) Capital outlay - projects (5,945,307) (7,077,185) (8,213,705) (9,355,035) (10,501,348) (11,652,822) Transfers in/(out)(4,228,984) (4,371,832) (4,519,744) (4,672,900) (4,831,491) (4,995,713) Net cash flow 7,661,213 3,894,778 3,773,965 3,752,641 2,751,820 2,438,588 Unrestricted reserves 42,538,610$ 43,194,300$ 43,372,199$ 44,659,717$ 45,560,379$ 46,144,310$ Less required reserves (3 months O&M)14,884,779 16,233,339 16,569,476 17,077,643 17,726,333 18,245,902 Reserves in excess of policy minimum 27,653,831$ 26,960,961$ 26,802,723$ 27,582,075$ 27,834,046$ 27,898,408$ Water & Sewer Utility Fund Pro Forma Projections Per Rate Study Updated for Actual Reserve Balances as of 9/30/2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Stormwater fees 17,597,131$ 17,817,095$ 18,039,809$ 18,265,307$ 18,493,623$ 18,724,793$ Other operating revenues 147,890 147,890 147,890 147,890 147,890 147,890 Total operating revenues 17,745,021 17,964,985 18,187,699 18,413,197 18,641,513 18,872,683 Less: Personal services (3,531,285) (3,651,588) (3,777,433) (3,909,161) (4,047,137) (4,191,754) Less: O&M expenses (5,056,254) (5,207,941) (5,364,180) (5,525,105) (5,690,858) (5,861,584) Net Operating Income 9,157,482 9,105,456 9,046,086 8,978,931 8,903,518 8,819,345 Non-Operating Income/(Expense): Interest earnings 701,265 594,997 491,392 438,121 390,798 341,898 Debt payments - Interest Expense (1,112,166) (1,061,209) (1,004,536) (957,192) (904,150) (904,150) Capital outlay - projects (10,424,431) (10,746,223) (7,148,355) (7,799,409) (7,515,036) (7,515,036) Transfers in/(out)(964,027) (975,976) (988,074) (1,000,323) (1,012,726) (1,012,726) Net cash flow (2,641,877)$ (3,082,955)$ 396,513$ (339,872)$ (137,596)$ (270,669)$ Unrestricted reserves 29,631,383$ 24,974,273$ 23,732,824$ 21,695,960$ 19,885,671$ 19,885,671$ Less required reserves (3 months O&M)2,424,926 2,480,185 2,536,537 2,597,865 2,660,536 2,739,372 Reserves in excess of policy minimum 27,206,457$ 22,494,089$ 21,196,287$ 19,098,096$ 17,225,135$ 17,146,299$ Stormwater Utility Fund Pro Forma Projections Per Rate Study Updated for Actual Reserve Balances as of 9/30/2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 Solid Waste fees 20,043,286$ 20,794,909$ 21,574,718$ 22,383,770$ 23,223,162$ 24,094,031$ Recycling fees 1,957,810 2,031,228 2,107,399 2,186,426 2,268,417 2,353,483 Sales of recyclables 1,316,911 1,316,911 1,316,911 1,316,911 1,316,911 1,316,911 Other operating revenues 553,000 553,000 553,000 553,000 553,000 553,000 Total operating revenues 23,871,007 24,696,048 25,552,028 26,440,107 27,361,490 28,317,425 Less: Personal services (8,031,290) (8,222,573) (8,408,371) (8,610,069) (8,862,505) (9,123,002) Less: O&M expenses (13,915,746) (14,185,861) (14,464,029) (14,750,493) (15,045,498) (15,349,300) Net Operating Income 1,923,971 2,287,614 2,679,628 3,079,545 3,453,487 3,845,123 Non-Operating Income/(Expense): Interest earnings 421,198 288,006 311,181 334,616 366,634 407,279 Other non-operating income (expense)305,100 305,100 305,100 305,100 305,100 305,100 Debt payments - (344,826) (431,380) (431,380) (431,380) (431,380) Capital outlay - projects (12,404,139) (269,232) - Transfers in/(out)(1,969,553) (2,035,963) (2,103,973) (2,173,704) (2,246,519) (2,321,838) Net cash flow (11,723,423)$ 230,699$ 760,556$ 1,114,177$ 1,447,322$ 1,804,284$ Unrestricted reserves 24,564,906$ 24,795,605$ 25,556,161$ 26,670,339$ 28,117,663$ 29,921,947$ Less required reserves (6 months O&M)10,973,518 11,376,630 11,651,890 11,895,971 12,169,692 12,451,841 Reserves in excess of policy minimum 13,591,388$ 13,418,975$ 13,904,271$ 14,774,368$ 15,947,972$ 17,470,106$ Solid Waste and Recycling Fund Pro Forma Projections Per Rate Study Updated for Actual Reserve Balances as of 9/30/2016 FY2017 FY2018 FY2019 Gas operating revenues 37,378,600$ 37,866,000$ 37,950,900$ Less: Gas purchased (15,501,100) (15,567,300) (15,639,300) Less: Operating expenses (11,313,000) (12,593,000) (12,867,700) Net Operating Income 10,564,500 9,705,700 9,443,900 Non-Operating Income/(Expense): Interest earnings 450,000 450,000 450,000 Other non-operating income 165,400 165,400 165,400 Debt payments (1,372,100) (991,500) (985,100) Capital outlay - projects (4,000,000) (4,000,000) (4,000,000) Transfers in/(out)(2,960,100) (2,972,000) (2,492,000) Net cash flow 2,847,700$ 2,357,600$ 2,582,200$ Unrestricted reserves 50,449,891$ 55,433,791$ 60,532,291$ Less required reserves (3 months O&M)7,046,550 7,287,950 7,373,025 Reserves in excess of policy minimum 43,403,341$ 48,145,841$ 53,159,266$ Gas Utility Fund Pro Forma Projections Per Rate Study Updated for Actual Reserve Balances as of 9/30/2016 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3332 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: Action ItemIn Control: Public Utilities Agenda Number: 3.3 SUBJECT/RECOMMENDATION: Approve establishment of new Water and Sewer Fund capital projects and transfers to provide project funding. SUMMARY: Based upon review of the existing capital project budget, and in conjunction with an upcoming rate study and proposed future bond issue, the Public Utilities department proposes to reorganize the capital project budget titles and fund projects for upgrades and improvements separate from repair and replacement (R&R) projects. In preparation for the upcoming rate study, staff would like to establish and fund these new projects as soon as possible. Staff has provided a Water and Sewer Fund Capital Project summary worksheet that lists all newly proposed projects and proposed funding transfers. The proposed changes have a net zero effect on the capital improvement fund, utilizing funding available in existing projects to create the budget for the newly established projects. The worksheet also details the establishment of funding for bond construction projects. All proposed funding changes will be detailed as part of mid-year budget amendments. Resolution 17-10 was approved by Council on March 16, 2017, authorizing expenditures which total $77,560,763 in fiscal year 2017 ($24,825,763) and fiscal year 2018 ($52,735,000) to be reimbursed by the proceeds of the bond issue in 2018. The fiscal year 2017 adopted capital improvement budget included bond funding of $4,631,700 in one project. This approved budget is being reallocated based on the new project structure and the remaining budget available for bond reimbursement based on the resolution ($20,194,063). One reprioritization that is being made is the reallocation of Sanitary Sewer Extension account funds (previously targeted for Septic to Sewer projects) to increase funding of higher priority projects (such as Sanitary Sewer Upgrades, Pump Station R&R, WPC R&R, Sanitary Sewer R&R, etc.). The Septic to Sewer program has been demoted in priority for a number of reasons. The original feasibility study that was completed for the project, completed in January 2011, was based on a number of assumptions that over time have been shown to no longer apply. Page 1 City of Clearwater Printed on 4/21/2017 File Number: ID#17-3332 Firstly, the feasibility study anticipated that the USEPA Numeric Nutrient Criteria (NNC) rules would be implemented. These rules would have greatly increased the level of treatment that would have been required at our wastewater treatment plants so as to remove far greater quantities of nutrients than our plants were designed to remove currently. The feasibility study anticipated that part of the increased need to reduce nutrients at our plants could be offset by credits for removing the nutrients discharged by septic tanks located in the watershed. However, subsequently, the NNC rules were never implemented due to legal challenges and the science used to justify the rules was updated such that implementation of the rules in the future is very unlikely. Staff has recently renewed the FDEP Operating Permits at all three wastewater plants and the level of nutrient removal has remained as it has been for many years. These permits will not expire for five years and staff does not anticipate any change in the nutrient removal requirements at the time of the next renewal. Therefore, one of the most compelling reasons to undertake the Septic to Sewer program is no longer valid. Secondly, the feasibility study anticipated that at some point in time 100% of all septic tanks within a project area would annex into the City and connect to the sewer system. It was believed many residents of the unincorporated area to be served by the new sewer line would initially take advantage of the low cost to connect to the new city system (a small fraction of the actual cost of each connection) and that the remainder would connect as their septic tanks failed in the future. This would result in 100% annexation of all potential customers and the reduction of all the septic tanks (and their associated nutrient loads on the environment). This turned out to be an incorrect assumption. Only approximately 350 of the potential 500 residents in the unincorporated project area annexed (or agreed to annex when their property became contiguous) initially. Since that time, few others have annexed and requested service from the city. The Pinellas County Health Department (PCHD) is issuing permits for residents in that area to repair or replace their failing septic systems instead of requiring them to connect to the new city sewer. Staff has met with the PCHD and learned that it is Florida Health Department policy to not require those with failing septic tanks to connect to city sewer systems if the City requires the property owner to annex into the city as a condition of service. This policy creates a situation where the actual cost per connection is much higher than it was estimated to be when the feasibility study was completed. It also creates a situation where we have areas where some residents are within the city, some are not and some who now receive service are not annexed into the city because they are not contiguous even though they receive city services. These higher costs per unit served, inconsistent annexation potential and the PCHD policies regarding septic tank repair and replacement make the conclusions of the feasibility study invalid. Staff has recently completed a phase one review of the infrastructure age, repair and replacement needs in preparation to complete formal Utility System Master Plans. The phase one review indicated that funding priorities must be shifted going forward from new facility projects to repair and replacement of aging infrastructure. This is consistent with what many other utilities in our area and across our country are finding as they also complete similar analyses. The shift or repair, renewal and replacement is consistent with systems that have components that are still serviceable but are approaching the end of their useful life. The changes in the budget accounts presented here today reflect those changing priorities. Page 2 City of Clearwater Printed on 4/21/2017 File Number: ID#17-3332 APPROPRIATION CODE AND AMOUNT: N/A USE OF RESERVE FUNDS: N/A Page 3 City of Clearwater Printed on 4/21/2017 Project Current Proposed Changes Proposed Revised Expenditures Open Available Number Project Title Budget Existing Funds Bond Funded Budget To Date Encumbrance Balance Notes Water System 96721 System R&R -Maintenance 4,606,799 362,199 4,968,998 2,610,053 337,917 2,021,028 96722 Line Relocation - Maintenance - 505,000 505,000 - - 505,000 Proposed new project 96739 Reclaimed Water Dist Sys 63,071,459 200,000 400,000 63,671,459 62,037,360 999,845 634,254 96740 Water Supply/Treatment 5,870,431 (406,267)5,464,164 5,350,733 113,431 - Combined with other water projects 96741 System R&R - Capitalized 10,836,995 (2,031,559)8,805,436 8,798,233 7,203 - Combined with other water projects 96742 Line Relocation - Capital 15,964,486 (1,109,439)620,000 15,475,048 11,478,334 3,254,906 741,808 96743 Mtr/Bklow Pre Dev/Change 4,184,046 (244,584)3,939,462 3,939,462 - - Combined with other water projects 96744 System Expansion 2,633,673 0 2,633,673 2,373,278 71,925 188,470 96752 Water Service Lines 4,742,119 (1,075,441)3,666,678 3,658,152 8,526 0 Combined with other water projects 96764 PO Plant Exp-Res #1 16,865,751 931,590 1,350,000 19,147,341 16,090,801 665,131 2,391,409 96766 Water Quality Monitoring Devices 600,000 (591,745)8,255 8,255 - - Combined with other water projects 96767 RO Plant @ Res 2 44,701,876 591,745 1,000,000 46,293,621 43,594,811 227,875 2,470,935 96768 Rebate-Well,Lk,PDIRR Abandonment 275,000 (162,000)113,000 111,488 - 1,512 96773 Groundwater Replenishment Facility 8,177,867 6,729,301 3,208,000 18,115,168 4,113,529 1,751,334 12,250,305 96774 Automated Meter Reading 2,300,000 (2,129,301)170,699 170,699 - - Combined with other water projects 96775 Arsenic Treatment WTP#3 133,202 0 133,202 133,202 - - Combined with other water projects 96780 Valve Turner Maint Trailer 57,884 0 57,884 57,884 - - Project closed at 1Q FY17 96781 Compact Track Loader 62,000 0 62,000 48,523 - 13,477 96782 Reverse Osmosis Plant @ WTP#3 1,226,218 (226,218)1,000,000 2,000,000 - 862,100 1,137,900 96783 Water System Upgrades/Improvements - 0 - - - - Proposed new project 96784 Reclaimed Water Dist System R&R - 200,000 200,000 - - 200,000 Proposed new project 96785 Feasibility Studies/Evaluations - Water - 925,000 925,000 - - 925,000 Proposed new project 96786 Devices/Equipment - Water System - 0 - - - - Proposed new project Total Water System 186,309,806 2,468,282 7,578,000 196,356,088 164,574,797 8,300,193 23,481,097 Sewer System 96202 WWTP Screw Pump Replacement 4,803,480 (541,604)4,261,876 4,261,876 - - Combined with other sewer projects 96204 WWTP UV Disinfections System 1,567,586 (700,042)867,544 867,544 - - Combined with other sewer projects 96209 Maintenance Vehicle 94,002 0 94,002 94,002 - - Project closed at 1Q FY17 96211 Godwin Diesel Pump 72,000 0 72,000 69,833 - 2,167 96212 Sanitary Sewer Upgrades/Improvements - 750,000 3,690,000 4,440,000 - - 4,440,000 Proposed new project 96213 Marshall Street Upgrades/Improvements - 400,000 1,875,000 2,275,000 - - 2,275,000 Proposed new project 96214 East Plant Upgrades/Improvements - 100,000 100,000 - - 100,000 Proposed new project 96215 Northeast Plant Upgrades/Improvements - 113,449 7,212,763 7,326,212 - - 7,326,212 Proposed new project 96216 Laboratory R&R - 0 120,000 120,000 - - 120,000 Proposed new project 96217 Pump Station R&R - 1,405,192 1,405,192 - - 1,405,192 Proposed new project 96218 Feasibility Studies/Evaluations - Sewer - 1,078,598 1,078,598 - - 1,078,598 Proposed new project 96219 Devices/Equipment - Sewer System - 485,000 200,000 685,000 - - 685,000 Proposed new project 96611 Bio Solids Treatment 9,227,732 (747,302)8,480,430 7,856,853 49,510 574,067 96615 Odor Control 2,567,094 (37,872)2,529,222 1,971,665 134,486 423,071 96619 WWTP Generator Replacements 4,411,383 0 4,411,383 4,176,257 - 235,126 96621 WWTP New Presses 3,402,580 (1,449)3,401,131 3,388,052 - 13,079 96630 Sanitary Sewer Extention 16,179,556 (3,070,836)3,750,000 16,858,720 10,707,499 975,185 5,176,036 96634 Sanitary Utility Relo Acco 11,533,916 (584,427)10,949,489 4,779,214 5,782,462 387,813 96645 Laboratory Up-Grade 2,104,959 (114,057)1,990,902 1,878,283 14,310 98,309 96654 Facilities Upgrade&Improv 27,839,479 (1,875,419)( 4,331,700 ) 21,632,360 17,794,893 1,297,245 2,540,222 96664 Wpc R&R 29,154,544 809,300 29,963,844 22,842,657 2,037,359 5,083,828 96665 Sanitar Sewer R&R 33,085,286 2,363,252 35,448,538 27,517,155 3,162,620 4,768,763 96666 WWTP East Bypass & NE Pump 2,325,971 0 2,325,971 2,325,971 - - Project closed at 1Q FY17 96686 Pump Station Replacement 19,776,977 (2,200,065)17,576,912 16,201,749 1,113,255 261,908 Total Sewer System 168,146,545 (2,468,282)12,616,063 178,294,326 126,733,503 14,566,432 36,994,391 Water and Sewer Fund Capital Project Summary Project Current Proposed Changes Proposed Revised Expenditures Open Available Number Project Title Budget Existing Funds Bond Funded Budget To Date Encumbrance Balance Notes Net Budget Change - W&S Projects:0 20,194,063 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3411 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: ReportIn Control: City Council Agenda Number: 3.4 SUBJECT/RECOMMENDATION: Discussion of Department of Economic Opportunity pilot study on vulnerability analysis and adaptation planning. SUMMARY: Page 1 City of Clearwater Printed on 4/21/2017 1 DEO Coastal Resilience Vulnerability and Adaptation Pilot Study and Other Related City Initiatives Background In September 2015 the City was selected by the Florida Department of Economic Opportunity (DEO) to be one of three communities participating in a DEO pilot study on vulnerability analysis and adaptation planning. The DEO contracted with Dewberry Consultants LLC (Dewberry) to work with the selected communities (City of St. Augustine, Escambia County and City of Clearwater) to complete two tasks related to local conditions, and a third task based on the cumulative work and experience of the overall initiative: 1. Develop coastal hazard vulnerability analyses and scenarios for the three pilot communities; 2. Use those vulnerability analyses and scenarios to complete coastal hazard adaptation plans for each of the three communities; and 3. Prepare a number of guidance tools, presentation materials, and case studies that clearly identify and explain all the information and resources needed and available to Florida communities for the completion of these same analyses, scenarios and adaptation plans for their own communities. DEO and Dewberry recognized that there was no predetermined tool, problem, process or solution, so Dewberry’s role was to work with the pilot communities to identify issues to address related to sea level rise and/or coastal flooding, and obtain the necessary data to evaluate those issues. The pilot communities would have input into the project’s recommendations, and should incorporate aspects of the final plan’s recommendations into their local comprehensive or hazard mitigation plans. The overall project is managed by DEO, and the City’s role is to identify goals, provide local data and information, review work products and provide input on the recommendations to the consultant. A known limitation of the project was the finite budget, which limited the overall scope and level of detailed analysis and reporting possible, and the project schedule, which was originally set by DEO to be complete by mid-December 2016. Dewberry’s deadline was later extended due to the complexity of the project and time required for work product review. Locally, these constraints meant that the number of scenarios evaluated in Task One were limited in an effort to balance thoroughness and detail, as was the anticipated work product (Adaptation Plan) for Task Two. However, this does provide the City with an initial study and some localized data which can guide future projects and possible policy changes. 2 Task One: Vulnerability Assessment Task One of the project started in late October 2015. At a brief “kick-off” meeting held online, City staff and Dewberry set the overall goals of the project, discussed the project vision, and reviewed the project timeline. Prior to this meeting, City staff completed a survey which provided a baseline understanding of what the City was looking to achieve through the project, and the areas (i.e., geographical, infrastructure, etc.) that the City wished to focus on, which was also discussed at this meeting. In mid-January 2016, Dewberry and DEO staff visited Clearwater for an all day meeting to develop an understanding of the City’s priorities and future vision which would affect the scope of the Vulnerability Assessment (Assessment). Representatives from the Planning and Development, Engineering, Public Utilities, Emergency Management, and Clearwater Gas Departments participated. Dewberry provided an overview of sea level rise science and context, best sources of sea level rise information, short and long term scenarios, and their initial sea level rise mapping for the City. Through a facilitated discussion, City staff established key problems based on their individual expertise and experience, and produced action items on which the vulnerability report would be based. After this meeting, the consultants prepared the Assessment based on City data and conditions. This is a highly technical report, which utilized GIS identify the City’s baseline conditions for nuisance flooding, a 100-year storm event, and a 500-year storm event, and compares those results to the same events with a sea level rise of one, two, and three feet (excerpt of results below; complete results contained in Chapter 3 of Assessment). 3 These conditions were overlaid onto other City data to provide seven high-level data points later used in Task 2 (Chapters 4 and 5 of Assessment). Those were: 1. Flooding “Hotspots”: Identified hotspots are Clearwater Beach, Sand Key, Island Estates, and areas around Stevenson and Allen Creeks, as well as Cooper Bayou, which were confirmed and were anticipated by staff. 2. Additional Flooding Expected: Nuisance flooding is expected to increase the most over all levels of sea level rise, whereas the 100-year and 500-year storms are also expected to increase but not as exponentially as nuisance flooding. 3. Road Vulnerability: The road network’s vulnerability to flooding increases the most for nuisance flooding, while the increases for the 100-year and 500-year storms are relatively low. 4. Building Vulnerability: Since finished floor elevation data is not available, this only indicates when a building lies within one of the areas impacted by nuisance, 100-year and 500-year flooding at each level of sea level rise. 5. Bridge Vulnerability: Bridges will start to see impacts reducing passability during nuisance flooding events with 2 feet of sea level rise, while others may experience impacts during 100- and 500-year storm events with 1 foot of sea level rise. 4 6. Affected Essential Facilities: Two fire stations and two wastewater treatment facilities were found to be vulnerable to flooding in several of the scenarios, but no schools are vulnerable. 7. Shoreline Change: The shoreline on Clearwater Beach is expected to remain stable, with the potential for slight rates of growth, whereas the shoreline on Sand Key will likely see increased rates of erosion. Additionally, the Assessment touched briefly on two additional factors known to also affect flooding: changes in heavy precipitation and anticipated changes to the water table (Chapter 6 of Assessment). However, due to the limited scope and issues with downscaling national data to a local level, the level of detail is limited. Task Two: Adaptation Plan Task Two, Adaptation Planning, is currently underway. For this task, the consultant team also includes representatives from the Sabin Center for Climate Change Law at Columbia Law School and the St. Thomas School of Law. In October 2016, City staff from the Planning and Development, Engineering (Environmental, Stormwater Engineering and Stormwater Maintenance), Parks and Recreation, and Economic Development and Housing Departments met with DEO and the consultant team to discuss: the findings in the Assessment; policy context and how the City’s efforts fit into state-wide efforts; options for adaptation and how the law enables or constrains their implementation; and possible local strategies and issue priorities. The final work product will be a standalone document that will guide future comprehensive or mitigation plan goals, objectives, and/or policies. City staff received a first draft of the Adaptation Plan in mid-February, is currently reviewing a second draft. The Adaptation Plan includes the following: description of basic goals for adaptation; categories of adaptation measures; legal considerations for Florida localities looking to implement such measures; vulnerabilities particular to Clearwater; features of the Clearwater community and economy that will likely enable and/or constrain ambitions for local adaptation and priority setting. Additionally, the Plan includes potential responses to identified vulnerabilities based on local context, most of which are recommendations for policy changes, keeping in mind the legal context. For example, if the City were to implement Option A, the legal ramifications could be these. The Plan does not identify specific Capital Improvement Projects, but rather identifies policy changes that could lead to specific Capital Improvement Projects, and includes general guidance on the types of projects that may be implemented. For example, based on recommendations in the Plan, the City might adopt a policy that says City infrastructure projects with anticipated life spans of 50 years (example only) should incorporate an evaluation of possible impacts from sea level rise or other coastal flooding events to determine what additional design upgrades should be incorporated. 5 A copy of the draft Executive Summary of the Plan is attached, which summarized potential responses described within the plan. The DEO Coastal Vulnerability Assessment and Adaptation Plan project will be completed no later than June 30, 2017 (per the updated agreement). The consultants anticipate the final Adaptation Plan will be complete in late April or early May. Related City Projects/Tasks In addition to the work Planning and Development Department staff is involved in described above, two additional projects are in process that are related. The Adaptation Plan, the DEO Peril of Flood Technical Assistance Grant (accepted in January 2017), and updates to the city’s floodplain management regulations contained within the Community Development Code all address flood risks and mitigation to differing degrees. Work completed as part of the Peril of Flood grant examines the City’s Comprehensive Plan and how to appropriately address the new statutory requirements signed into law in May 2015 through Florida Senate Bill 1094, “An Act relating to the peril of flood.” This act requires specific components be included in cities’ Coastal Management Elements, including the addition of a coastal redevelopment component addresses how to eliminate inappropriate and unsafe development in the coastal areas when opportunities arise. Additionally, cities must include redevelopment principles, strategies, and engineering solutions that reduce the flood risk in coastal areas which results from high-tide events, storm surge, flash floods, stormwater runoff, and the related impacts of sea-level rise. The City has contracted with HDR, Inc. to assist in the completion of the technical analysis and to draft amendments to the Comprehensive Plan to address these new requirements. These are anticipated to be presented to City Council in early summer. Additionally, amendments are required to the City’s floodplain management regulations to better coordinate with the Florida Building Code, which was amended to include flood provisions several years ago. There may be opportunities to incorporate language that also increases points earned towards the City’s CRS score. Staff is currently drafting policy language on which Council direction will be requested prior to proceeding with public hearings on the Ordinance. There may be recommendations in the Peril of Flood project that could be integrated into changes to the floodplain management regulations. And, since the Peril of Flood project is utilizing the results of the Assessment as part of its analysis, there is the likelihood that recommendations for policies in the Comprehensive Plan may also need to be codified within City Codes. Florida Community Resiliency Initiative Pilot Project Adaptation Plan for Clearwater, Florida DRAFT DATE MARCH 27, 2017 Clearwater, Fla. Adaptation Plan | iii The City of Clearwater is one of the three communities involved in the pilot phase of the Community Resiliency Initiative being conducted by the Florida Department of Economic Opportunity (DEO) and funded by the National Oceanic and Atmospheric Administration (NOAA). The Initiative seeks to assess vulnerabilities to projected increases in coastal flooding and develop strategies to make affected areas more resilient. This document builds on the Coastal Vulnerability Assessment developed by Dewberry Consultants, LLC as part of Task 1. It describes key legal and policy constraints and supports for responses to vulnerabilities identified by Dewberry and identifies possible ways for Clearwater to respond to those vulnerabilities. Although it presents an array of potential responses and suggests steps for integrating them into the City’s project planning and budgeting process, this document does not examine the feasibility, costs or benefits of particular responses, nor does it select or prioritize responses. The adaptation planning process The National Oceanic and Atmospheric Administration’s U.S. Climate Toolkit describes adaptation planning as proceeding in five steps: 1) Identify climate-related changes and risks; 2) Assess vulnerabilities; 3) Investigate possible responses; 4) Prioritize responses to achieve near- and longer-term adaptation goals; and 5) Execute and evaluate outcomes.1 Clearwater completed steps 1 and 2 with Dewberry’s help and is currently engaged in step 3. For Clearwater to complete steps 4 and 5, it should use the recommendations in this report to develop plans for specific projects, which can be assessed and prioritized based on analyses that consider their feasibility, costs, benefits, and cost-effectiveness relative to alternatives. Key features in adaptation planning After describing sea level rise (SLR) in Florida and the Community Resiliency Initiative, this document describes key features of the context in which Clearwater will adapt, including:  General information about adaptation planning;  The City’s legal context; 1 U.S. Climate Resilience Toolkit, Overview: Steps to Resilience, https://perma.cc/PAA4-3BMP (last updated Nov. 16, 2016); see also Katherine Jacobs, Tom Wilbanks, et al., National Academies of Sciences, Adapting to the Impacts of Climate Change 135 fig. 4.1 (2010) (suggesting similar process), https://perma.cc/D3DX-G3RR. The Centers for Disease Control and Prevention (CDC) has developed a similar framework for improving community resilience. See Centers for Disease Control and Prevention, CDC's Building Resilience Against Climate Effects (BRACE) Framework, https://perma.cc/E6PG-538W, (last updated Oct. 22, 2015). Clearwater, Fla. Adaptation Plan | iv  Summaries of key vulnerabilities identified by Dewberry;  Key features of Clearwater that will inform and limit adaptation decisions; and  Potential responses to Clearwater’s vulnerabilities. Recommendations The following list summarizes the potential responses described at greater length in section 5 of the report: Stormwater and Wastewater Management  Making reference to SLR scenarios in Dewberry’s Vulnerability Assessment, examine the full array of options for hardening vulnerable wastewater treatment plants to storms and flooding, comparing net present value of short-term engineering solutions (e.g., erecting flood barriers around key structures, elevating electrical components) with more extensive redesign options (e.g., elevating an entire plant);  Address CSX activity that promotes erosion, either informally or by asking the City’s legal staff to develop a challenge to dumping that requires a Clean Water Act section 404 permit;  Request funding for a study to establish a “business as usual” baseline for comprehensive system maintenance budgets that assume no design changes under high and highest SLR scenarios on a 30-year time horizon; then explore design changes in areas vulnerable to flooding (currently or foreseeably) and compare their expected cost- effectiveness with “business as usual”;  Adopt a Capital Improvements Element policy that only permits additional maintenance spending on facilities or components repeatedly subject to SLR-driven impacts if the responsible department has examined alternative design standards and found that they would yield no net benefit over a 5, 10, or 20 year timeframe;  Evaluate the costs and benefits of installing green infrastructure / low impact development in rights of way as a means of reducing strain on stormwater system and improving compliance with water quality standards;  Explore possible acquisitions of land—including land that is partly or fully developed—for restoration of floodplain; evaluate cost of acquisitions against costs avoided in “business as usual scenario” (see above);  Explore areas where imposition of setbacks in advance of further development could avoid strain on stormwater management system; Clearwater, Fla. Adaptation Plan | v  Coordinate with Pinellas County regarding enforcing compliance with MS4 permit on parcels of the county that are surrounded by the City;  In collaboration with Pinellas County and other localities in SWFWMD’s jurisdiction, propose that SWFWMD revise its current approach to assessing funding proposals, which only credits outcomes relating either to quality or quantity, but not both. Flood Insurance and Freeboard  Impose freeboard requirements in all FEMA-designated flood zones and consider imposing them in areas expected to become vulnerable to storm surge over the next 25 years according to Dewberry’s Vulnerability Assessment;  Explore options for applying FEMA Hazard Mitigation funds to buyouts of properties that are especially vulnerable to repeated and severe flooding;  Revise the local criteria for “substantial damage” and “substantial improvement” to pertain to damage or improvements occurring over a period of five or ten years; Coastal Management and Development  Make freeboard a condition of permits for installation, modification, or maintenance of sea walls and other forms of coastal hard armoring;  Require sellers of private property in Clearwater to provide buyers with a summary description of expected SLR-related flooding impacts on property and infrastructure servicing that property;  Make conduct of analysis of SLR and flooding impacts on planned structures a condition of permits for development or redevelopment of coastal property;  Commission or conduct an inventory of all sea walls that assesses their expected useful life under the SLR scenarios described in Dewberry’s Vulnerability Assessment;  Commission or conduct an assessment of existing or planned infrastructure and buildings to determine whether they can accommodate expected flooding under the SLR scenarios described in Dewberry’s Vulnerability Assessment as likely to occur within their useful life. Roads and Bridges Clearwater, Fla. Adaptation Plan | vi  Adopt ordinance authorizing reduced maintenance of roads and bridges under particular environmental and budgetary circumstances;  Link adoption of ordinance to establishment of AAA that encompasses portions of barrier islands and other coastal areas of Clearwater where roads are identified as vulnerable to nuisance flooding in a 2-foot SLR scenario. Disaster Recovery  Impose restrictions on post-disaster rebuilding in areas expected to become more vulnerable to coastal flooding, whether in the form of setbacks, design requirements (e.g., base flood elevation and freeboard), or simple prohibitions;  Condition permission to rebuild after a disaster on demolition of or agreement not to install sea walls or other forms of hard armoring;  Condition permission to develop or rebuild post-disaster on a covenant to abandon or remove the structures following a subsequent, similar natural disaster;  Promote the dedication of conservation easements in areas vulnerable to repeat flooding. Conclusion This Adaptation Plan serves several purposes. It describes key features of the policy and legal frameworks that underlie adaptation efforts in Florida, highlights key vulnerabilities and circumstances relevant to any effort to address those vulnerabilities. Finally, it recommends various means of better adapting Clearwater to rising seas. Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: Resolution 17-17 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: ResolutionIn Control: City Council Agenda Number: 3.5 SUBJECT/RECOMMENDATION: Support the proposed extension of the one-cent local government infrastructure surtax, otherwise known as the Penny for Pinellas, and adopt Resolution 17-17. SUMMARY: Adoption of this resolution includes approval of the proposed project list and the execution of the Interlocal agreement with Pinellas County. The Penny IV Interlocal Agreement is nearly identical to the agreement currently in place with updated distribution percentages for the period from January 1, 2020 through December 31, 2029. The methodology for the distribution percentages mirrors each of the three previous agreements by following the population-based statutory formula. Pinellas County has provided revenue projections for a renewed Penny with a comparison of current and proposed distributions. Page 1 City of Clearwater Printed on 4/21/2017 Resolution No. 17-17 RESOLUTION 17-17 A RESOLUTION OF THE CITY OF CLEARWATER, FLORIDA, REGARDING THE PROPOSED EXTENSION OF THE ONE-CENT LOCAL GOVERNMENT INFRASTRUCTURE SURTAX OTHERWISE KNOWN AS THE PENNY FOR PINELLAS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Penny for Pinellas program was initiated by a referendum held in 1989 for a 10-year period beginning in 1990 and included many important county and municipal infrastructure improvements; and WHEREAS, the program was extended by a referendumheld in 1997 with the program being extended from 2000 to 2010; and WHEREAS, the program was extended by a referendum held in 2007 with the program being extended from 2010 to 2020; and WHEREAS, the program has provided funding for many critical community projects as well as provided funding for key countywide facilities; and WHEREAS, Pinellas County in cooperation with the municipalities of the county is now developing a program of projects for a Penny program for the time period 2020 to 2030; and WHEREAS, Pinellas county plans to hold a referendum for the extension of the Penny for Pinellas another 10 years from 2020 to 2030 in November of 2017 to fund that program of projects; and WHEREAS, the City wishes to go on record indicating its support for a referendum and the extension of the Penny program due to the considerable public benefit that it provides; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CLEARWATER, FLORIDA; Section 1.That the City of Clearwater goes on record as supporting the Board of County Commissioners scheduling of a referendum, and of the extension of the Penny for Pinellas program for 2020 to 2030. Section 2. The proposed project list, a copy of which is attached hereto as Exhibit A is hereby approved. Resolution No. 17-17 Section 3. The Interlocal Agreement with Pinellas County, a copy of which is attached hereto as Exhibit B is hereby approved. Section 4. That this resolution shall become effective immediately upon passage and adoption. ________________________________ George N. Cretekos Mayor Approved as to form: Attest: ______________________________________________________________ Pamela K. Akin Rosemarie Call City Attorney City Clerk Project Title Budget Utilities Infrastructure 20,000,000 Major League Baseball Facilities 7,500,000 Waterfront/Bluff Masterplan 8,000,000 Fire Engines/Ladder Trucks 8,560,000 Police Vehicles 1,750,000 Police District III (Countryside Sub Station)5,500,000 Neighborhood and Community Parks Renovations 3,500,000 Youth Sports Fields Renovations 5,000,000 Recreation Trails 2,500,000 McMullen Tennis Complex Expansion 2,000,000 Environmental Park Upgrades 1,500,000 Beach Marina Upgrades 15,000,000 Public Works Complex 12,300,000 City Hall 6,300,000 Downtown Parking Garage 10,500,000 Sand Key Bridge Replacement Fund 30,000,000 Total Proposed Penny IV Projects 139,910,000 Penny for Pinellas Extension City of Clearwater Proposed Projects 2020-2030 Resolution No. 17-17 Exhibit A INTERLOCAL AGREEMENT THIS INTERLOCAL AGREEMENT ("Agreement") is made and entered into as of this of , 20 , by and between Pinellas County, a political subdivision of the State of Florida, hereinafter referred to as the "County," and the municipalities within Pinellas County as set forth on the signature pages attached hereto, hereinafter referred to as the "Cities." RECITALS: WHEREAS, Section 212.055(2), Florida Statutes, authorizes the County to levy a local government infrastructure sales surtax of one percent (1%) throughout Pinellas County, Florida ("Infrastructure Sales Surtax"), subject to referendum approval; and WHEREAS, as provided by Section 212.055(2)(c)1, Florida Statutes, the net proceeds of the surtax may be distributed as provided in an interlocal agreement; and WHEREAS, the County and the Cities recognize a continuing need to fund critical infrastructure improvements, and the County intends to adopt an ordinance calling for a referendum on the question of extending the Infrastructure Sales Surtax for an additional ten (10) year period at an election to be held on November 7, 2017 (“Extension”); and WHEREAS, the parties further recognize that it is in the best interest of the County and the Cities to enter into an interlocal agreement that will run concurrently with the Extension of the Infrastructure Sales Surtax, if approved by the electorate, for the purpose of providing for the distribution among the County and the Cities as provided herein. NOW, THEREFORE, in consideration of the covenants herein contained, and other good and valuable consideration, the County and the Cities agree as follows: Section 1. CONDITIONS PRECEDENT This Agreement shall become effective on the Commencement Date set forth in Section 4, so long as the following conditions precedent have been satisfied: Resolution No. 17-17 Exhibit B A. Approval by Pinellas County voters of the Extension of the Infrastructure Sales Surtax; and B. Execution of the Interlocal Agreement by the County and the governing bodies of the municipalities representing a majority of the County’s municipal population as required by § 212.055(2)(c)1, Florida Statutes. Section 2. DISTRIBUTION OF INFRASTRUCTURE SALES SURTAX A. "Net Proceeds" shall mean the amount of the Infrastructure Sales Surtax collected in Pinellas County by the Florida Department of Revenue, less the Department's administrative costs, as provided by law. B. As provided by law, the Infrastructure Sales Surtax shall be collected by the Florida Department of Revenue and the Net Proceeds shall be distributed monthly to the County. C. The Net Proceeds shall be distributed by the County in accordance with the terms of this Agreement within a reasonable time after receipt as follows: (1) Countywide Investments will be funded in the total amount of 11.3% of the Net Proceeds collected over the ten (10) year term of this Agreement. Therefore, before the County distributes the Net Proceeds received by it pursuant to the distribution set forth in subsection (2) below, it shall apply 11.3% of Net Proceeds to fund Countywide Investments in the following project categories: a. “Economic Development Capital Projects” as authorized in Section 212.055(2)(d)3., Florida Statutes and “Housing” (Land Acquisition in support of residential housing as authorized in Section 212.055(2)(d)1.e., Florida Statutes) 8.3% of Net Proceeds b. Jail and Courts Facilities 3.0% of Net Proceeds TOTAL COUNTYWIDE INVESTMENTS 11.3% OF NET PROCEEDS Net Proceeds dedicated to Economic Development Capital Projects and Housing shall be used in accordance with guidelines set forth by a joint review committee established by resolution Resolution No. 17-17 Exhibit B of the Board of County Commissioners. The committee shall consist of representatives from parties to this Agreement. The committee may impose reporting requirements to ensure compliance with Section 212.055(2)(d)3., Florida Statutes, that allows allocation of up to 15 percent of Net Proceeds for funding economic development projects. Economic Development Capital Projects shall be limited to capital projects that support job retention and creation. (2) The remainder of the Net Proceeds will be distributed as follows: Pinellas County 51.7523% Belleair 0.2783% Belleair Beach 0.1112% Belleair Bluffs 0.1463% Belleair Shore 0.0079% Clearwater 7.9957% Dunedin 2.5651% Gulfport 0.8761% Indian Rocks Beach 0.3111% Indian Shores 0.1020% Kenneth City 0.3589% Largo 5.8044% Madeira Beach 0.3098% N. Redington Beach 0.1027% Oldsmar 1.0124% Pinellas Park 3.7349% Redington Beach 0.1030% Redington Shores 0.1559% Safety Harbor 1.2282% St. Pete Beach 0.6725% St. Petersburg 18.4607% Seminole 1.3119% South Pasadena 0.3619% Tarpon Springs 1.7528% Treasure Island 0.4841% D. In the event any municipality in Pinellas County does not sign this Agreement, or notifies the County in writing after signing this Agreement that it does not wish to receive any undistributed Net Proceeds to which it is entitled, its percentage of proceeds shall be distributed pro-rata to the other parties in accordance with the formula set forth in Section 2(C)(2) (after excluding such City's percentage). Resolution No. 17-17 Exhibit B Section 3. EXECUTION This Agreement may be signed in counterparts by the parties hereto. Section 4. TERM OF AGREEMENT The term of this Agreement shall run concurrently with the levy of the Infrastructure Sales Surtax, with said levy proposed for a ten (10) year period, commencing on January 1, 2020 (“Commencement Date”) and ending December 31, 2029. Section 5. ANNUAL REPORTING REQUIREMENTS A. Each City signing this Agreement shall annually post on its official website in the same manner as required by Section 166.241(3), Florida Statutes, its Capital Improvement Plan and shall identify therein any material changes in the projects funded by the Infrastructure Sales Surtax. If the City does not operate an official website, the City shall transmit its Capital Improvement Plan and identify therein any materials changes in the projects funded by the Infrastructure Sales Surtax to the County who shall post said plan on the County’s website. B. The County shall annually post on its official website in the same manner as required by Section 129.03(c), Florida Statutes, its Capital Improvement Plan and shall identify therein any material changes in the projects funded by the Infrastructure Sales Surtax. Section 6. PRIOR INTERLOCAL SUPERSEDED. The distribution terms of this Agreement shall supersede the distribution formula contained in the prior interlocals between the parties hereto, and the distribution of the Infrastructure Sales Surtax shall be governed specifically by the terms of this Agreement as of the Commencement Date. During the period between when this Agreement is approved by the parties hereto and the Commencement Date, the Infrastructure Sales Surtax shall be distributed in accordance with the Interlocal Agreement dated April 29, 2008, which terminates on December 31, 2019. Resolution No. 17-17 Exhibit B Section 7. SEVERABILITY If any provision of this Interlocal Agreement is held invalid, the invalidity shall not affect other provisions of the Interlocal Agreement which can be given effect without the invalid provision or application, and to this end, the provisions of this Interlocal Agreement are severable. Section 8. AMENDMENTS TO AGREEMENT This Agreement may be amended, in writing, upon the express written approval of the governing bodies of all the parties. Section 9. FILING OF AGREEMENT This Agreement shall be filed with the Clerk of the Circuit Court as provided in Section 163.01(11), Florida Statutes. IN WITNESS WHEREOF, the parties to this Agreement have caused their names to be affixed hereto by the proper officers thereof, as of the day and year first above written. ATTEST: PINELLAS COUNTY, FLORIDA, by and KEN BURKE, CLERK through its Board of County Commissioners By: By: Deputy Clerk Chair [SEAL] APPROVED AS TO FORM By: Office of the County Attorney ProLaw 83181 Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF BELLEAIR By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF BELLEAIR BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF BELLEAIR BLUFFS By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF BELLEAIR SHORE By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF CLEARWATER By: By: City Clerk City Manager COUNTERSIGNED: By: Mayor APPROVED AS TO FORM By: City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF DUNEDIN By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. CITY OF GULFPORT, FLORIDA By: City Manager APPROVED AS TO FORM AND ATTEST: CORRECTNESS By: By: City Clerk City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF INDIAN ROCKS BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF INDIAN SHORES By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF KENNETH CITY By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF LARGO By: By: City Manager Mayor [SEAL] REVIEWED AND APPROVED: By: City Attorney ATTEST: By: City Clerk Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF MADEIRA BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF NORTH REDINGTON BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF OLDSMAR By: By: City Clerk Mayor APPROVED AS TO FORM By: City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF PINELLAS PARK By: By: City Clerk Mayor APPROVED AS TO FORM AND CONTENT By: City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF REDINGTON BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: TOWN OF REDINGTON SHORES By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF SAFETY HARBOR By: By: City Clerk Mayor APPROVED AS TO FORM By: City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF ST. PETE BEACH By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF ST. PETERSBURG By: By: City Clerk Mayor APPROVED AS TO FORM AND CONTENT: By: City Attorney (designee) Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF SEMINOLE By: By: City Clerk Mayor APPROVED AS TO FORM: By: City Attorney Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF SOUTH PASADENA By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF TARPON SPRINGS By: By: City Clerk Mayor Resolution No. 17-17 Exhibit B IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be executed as of the day and year first written above. ATTEST: CITY OF TREASURE ISLAND By: By: City Manager Mayor Resolution No. 17-17 Exhibit B $ April 1, 2004 Population Estimate %$ April 1, 2016 Population Estimate %$% Economic Development Capital Projects and Housing 165,362$ 8.3000%165,362$ Jail & Court Facilities 225,000$ 15.4223%59,769$ 3.0000%(165,231)$ Countywide Investments Total 225,000$ 15.4223%225,131$ 11.3000%131$ 0% Pinellas County 645,557$ 284,306 52.3326%914,555$ 275,316 51.7523%268,999$ 42% Pinellas County Total 870,557$ 1,139,686$ 269,130 31% Belleair 3,664$ 4,1070.2969%4,918$ 3,9120.2783%1,255$ 34% Belleair Beach 1,456$ 1,6320.1180%1,965$ 1,5630.1112%509$ 35% Belleair Bluffs 2,000$ 2,2400.1619%2,585$ 2,0560.1463%585$ 29% Belleair Shore 64$ 720.0052%140$ 1110.0079%76$ 120% Clearwater 98,451$ 110,3257.9761%141,298$ 112,3877.9957%42,847$ 44% Dunedin 33,214$ 37,2172.6907%45,330$ 36,0552.5651%12,116$ 36% Gulfport 11,475$ 12,8600.9297%15,483$ 12,3150.8761%4,008$ 35% Indian Rocks Beach 4,718$ 5,2880.3823%5,498$ 4,3730.3111%780$ 17% Indian Shores 1,602$ 1,7960.1298%1,803$ 1,4340.1020%201$ 13% Kenneth City 4,050$ 4,5390.3282%6,342$ 5,0440.3589%2,291$ 57% Largo 64,980$ 72,8175.2644%102,575$ 81,5875.8044%37,594$ 58% Madeira Beach 4,020$ 4,5040.3256%5,474$ 4,3540.3098%1,454$ 36% N. Redington Beach 1,377$ 1,5430.1116%1,815$ 1,4440.1027%438$ 32% Oldsmar 12,252$ 13,7370.9931%17,891$ 14,2301.0124%5,638$ 46% Pinellas Park 42,452$ 47,5723.4393%66,002$ 52,4973.7349%23,549$ 55% Redington Beach 1,421$ 1,5920.1151%1,820$ 1,4480.1030%400$ 28% Redington Shores 2,088$ 2,3410.1692%2,756$ 2,1920.1559%667$ 32% Safety Harbor 15,884$ 17,8001.2869%21,704$ 17,2631.2282%5,820$ 37% St. Pete Beach 8,928$ 10,0040.7233%11,883$ 9,4520.6725%2,956$ 33% St. Petersburg 225,793$ 253,01018.2917%326,233$ 259,48318.4607%100,441$ 44% Seminole 15,875$ 17,7991.2868%23,184$ 18,4401.3119%7,308$ 46% South Pasadena 5,210$ 5,8370.4220%6,396$ 5,0870.3619%1,186$ 23% Tarpon Springs 20,674$ 23,1701.6751%30,975$ 24,6371.7528%10,301$ 50% Treasure Island 6,721$ 7,5320.5445%8,556$ 6,8050.4841%1,835$ 27% Municipalities Total 588,370$ 659,334 47.6674%852,624$ 678,169 48.2477%264,253$ 45% Total 1,458,927$ 943,640 100.0000%1,992,310$ 953,485100.0000%533,383$ 37% Calculation of the Ordinary Distribution to Eligible County and Municipal Governments (218.62 Florida Statutes): Penny IIIPenny IVVariance Penny for Pinellas, Local Infrastructure Sales Surtax Estimated Total Distributions to Pinellas County and Municipalities Penny III and IV (Dollar Amounts in Thousands, 000's omitted) Projected Allocations Note: the Countywide Investments distribution is prior to the County & Municipalities distribution and is shown as a percent of total estimated revenue. The population distribution formula for the County & Municipalities is 100% after the Countywide Investments distribution. Dollar amounts are based on growth assumptions of 3.5% in FY17, 3.0% in FY18-19 and 2.5% in FY20-30. 2016 Population Estimates from University of Florida, Bureau of Economic and Business Research, 10/31/2016. 2004 Population Estimates served as basis of Penny III Distribution among County and Municipalities. The allocation factor for each county government is computed by dividing the sum of the county’s unincorporated area population plus two-thirds of the county’s incorporated area population by the sum of the county’s total population plus two-thirds of the county’s incorporated area population. Each county’s distribution is determined by multiplying the allocation factor by the sales tax monies earmarked for distribution within that county. The allocation factor for each municipal government is computed by dividing the municipality’s total population by the sum of the county’s total population plus two-thirds of the county’s incorporated population. Each municipality’s distribution is determined by multiplying the allocation factor by the sales tax monies earmarked for distribution within its respective county. H:\USERS\Capital\PENNY IV\Distribution_Revenue_Population\Penny Estimated Annual Distribution Co and Munic\ Penny IV 3_28_17 Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3416 Agenda Date: 4/25/2017 Status: Approval ReviewVersion: 1 File Type: ReportIn Control: City Council Agenda Number: 3.6 SUBJECT/RECOMMENDATION: Provide an update on the status of the Imagine Clearwater Plan and establish capital improvement project 315-94892, Imagine Clearwater Implementation, to be funded with $500,000 of General Fund revenues. SUMMARY: A team of city staff are now meeting weekly and have developed a timeline for various actions and phases of Imagine Clearwater implementation. Key elements of the schedule are planned for discussion. A capital project is being established to fund various studies and expenditures that will be incurred during the remainder of the current fiscal year. At this point, staff is unable to identify the total budget need for all phases of the plan. As part of the capital budget submission for fiscal year 2018, the planned Penny III funding for Coachman Park will be moved forward from Fiscal Year 2020 to Fiscal Year 2018. Based on input from Council, other potential funding (i.e., B.P. settlement, General Fund reserves, bonding, and internal financing) can be programmed into the six year capital plan. APPROPRIATION CODE AND AMOUNT: A mid-year budget amendment will establish capital improvement project 315-94892, Imagine Clearwater Implementation , recognizing a budget increase of General Fund revenue in the amount of $500,000. USE OF RESERVE FUNDS: Funding for this contract will be provided by a mid-year budget amendment allocating General Fund reserves in the amount of $500,000 to capital improvement project 315-94892, Imagine Clearwater Implementation. Inclusive of this item if approved, a net total of $7,110,031 of General Fund reserves has been appropriated by Council to fund expenditures in the 2016/17 operating budget. The remaining balance in General Fund reserves after the 8.5% reserve requirement is approximately $14.4 million, or 11.4 % of the current General Fund operating budget. Page 1 City of Clearwater Printed on 4/21/2017 ID Task Mode Task NameDurationStartFinish 1 Imagine Clearwater 1233 days 3/27/17 12/15/21 2 Immediate Actions 495 days 3/27/17 2/15/19 3 First Referendum 106 days 6/12/17 11/7/17 12 Special Act Amendment 192 days 6/15/17 3/10/18 19 Update Downtown Plan 190 days 3/27/17 12/15/17 21 Activate Main Library 394 days 5/15/17 11/15/18 25 Water Front Connection 371 days 9/15/17 2/15/19 28 Second Century Storefront 110 days 7/15/17 12/15/17 30 Phase 1 849 days 6/15/17 9/15/20 31 Bluff Walk north of Cleveland Street 717 days 6/15/17 3/15/20 37 Coachman Garden & the Green (Bandshell & Restrooms) 654 days 3/15/18 9/15/20 40 Phase 2 1153 days 7/15/17 12/15/21 41 Bluff Walk south of Cleveland Street 762 days 1/15/19 12/15/21 44 Harborview Redevelopment 283 days 7/15/17 8/15/18 F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J Half 1, 2017 Half 2, 2017 Half 1, 2018 Half 2, 2018 Half 1, 2019 Half 2, 2019 Half 1, 2020 Half 2, 2020 Half 1, 2021 Half 2, 2021 Half 1, 2022 2017 2018 2019 2020 2021 2022 Tentative Imagine Clearwater Implementation Schedule Project: Imagine Clearwater.mpp Page 1 of 1 Updated: 4/14/17 , 10:41 AM CITY OF CLEARWATER AN OVERVIEW OF PARK CONSERVANCIES April 25, 2017 2 Imagine Clearwater Community Vision The Downtown Clearwater waterfront will be an active, authentic, iconic civic and open space that celebrates Clearwater’s history, natural beauty, culture, and diversity and anchors an economically vibrant downtown. 3 4 5 What is a City Park Conservancy? •Private, non-profit park benefit organization. •Raises money independent of the city. •Spends money under a plan of action mutually agreed upon with government. •Impetus for their creation comes from combination of users and residents, but the political receptivity of mayor, council and city government is a de facto requirement. 6 “There was a time when urban parks were firmly considered the pride, joy and responsibility of taxpayers. Once a park was in the public domain, all agreed that its weight was to be carried on the shoulders of city government. No Longer. While many places still hew to the traditional model, a growing number of cities now utilize private donations to rebuild, refurbish, and even maintain some of their most iconic parks. Today’s favored revitalization structure is the conservancy.” - The Trust for Public Land, 2015. 7 IMAGINE CLEARWATER MASTER PLAN KEY NEXT STEPS 8 Park Conservancy Roles & Responsibilities •Fundraising •Organizing Volunteers •Design, Planning & Construction of Capital Projects •Outreach & Marketing •Programming •Advocacy •Maintenance & Security 9 Park Conservancy Case Studies •Bryant Park Corporation, NYC •Discovery Green Conservancy, Houston, TX •Railroad Park Foundation, Birmingham, AL •Civic Center Conservancy, Denver, CO •Friends of the Riverwalk, Tampa, FL Bryant Park Corporation New York City 501 (c) (3) Founded in 1988 17 Board Members 40 Full-Time Admin Staff $12 mm operating budget (2015) 9.6 acres 10 CITY OF CLEARWATER 11 12 Discovery Green Conservancy Houston, TX 501 (c) (3) Founded in 2004 19 Board Members 37 Full-Time Staff $5.4 mm operating budget (2014) 12 acre urban park 13 The conservancy manages all aspect’s of the park’s operations. Funds are raised through sponsorships, concessions, private donations and government grants. 14 Railroad Park Foundation Birmingham, AL 501 (c) (3) Founded in 2010 18 Board Members 9 Full-Time Staff $5.6 mm operating budget (2015) 19 acre urban park 15 The foundation manages all aspect’s of the park’s operations. Funds are raised through sponsorships, concessions, private donations and government grants. 16 Civic Center Conservancy Denver, CO 501 (c) (3) Founded in 2004 17 Board Members 2 Full-Time Staff $440k operating budget (2014) 12 acre urban park 17 The conservancy’s primary role is advocacy, events and fundraising. Funds are raised mainly through government grants, as well as private donations. Friends of the Riverwalk Tampa, FL 501 (c) (3) Founded in 2005 24 Board Members 1 Full-Time Staff $330k operating budget (2015) 2.4 mile waterfront park 18 19 The friend’s group fundraises on behalf of the city of Tampa to help design and construct, maintain, and program the Riverwalk. Since 2005, Friends of the Riverwalk have raised over $3mm in cash; and transferred half of that amount to the city. 20 HR & A Recommendations Advocacy| Fundraising| Events •Support the referendum •Fundraise for capital costs •Programming & Events Background The City is actively looking to increase the event offerings in Downtown Clearwater, specifically in Station Square Park, Coachman Park and East Gateway area. There are currently several new events planned in 2017/18 and discussions for pursuing more. The strategy for events in Coachman Park is to improve the park through the Imagine Clearwater project a varied strategy of events both traditional (band shell) and active activities. The new space will promote the project opening as a “Grand Opening” to kickoff many new dates for people to place on their calendars as recurring events. The idea is that each day of the week there will be planned activities as well as the opportunity for passive recreation. Then on the weekends, staff proposes to have multiple events taking place within neighboring footprints. The City will schedule weekly and daily events, and then event partners will help fill out the calendar. Below is a listing of our current activities in the Downtown and Coachman Park areas as well as some discussions in anticipation of a completed Imagine Clearwater project. The CRA and Parks & Recreation (Special Events) are restructuring a position that will assist in creating, facilitating, and managing special events from the East Gateway downtown to Coachman Park, specifically with an emphasis on Station Square Park. New Events / Activities currently being planned for 17/18 with current resources: • Clearwater Sea-Blues Festival growing to host multiple stages and performance areas including a stage in Downtown as well as a stage at the Station Square Park. • Bay2Beach Festival is taking over the space currently filled by Fun ‘n Sun. This new festival will showcase our Downtown with multiple stages (SSP, Downtown Blast Friday setup, and Coachman Park). The festival will include live music, art exhibits, crafters and vendors, and much more. • Working with event partners to produce concert events such as Kenny G, John Legend, Third Eye Blind and more, soon to be announced in the future at Coachman Park. The concert size is 3,000 – 6,000 people with a shorter duration. This significantly shifts from the “festival” plan of 13,000 and an entire day of performances. These will still be held, but introduced in a different way to program. • Expansion of the Pierce Street Market concept to include a “Morning Yoga” component to that event that happens every other week at Coachman Park as well as partnering or collaborating with other events that are in the area . Additional events in discussion: • Movie Nights under the Stars (weekly - $500 cost to produce) $26,000 • Expanding the “Arts in the Park” program that will rotate between downtown locations (SSP and CP - $250 cost to produce) $13,000 • Monthly Event featuring local music and food and beverage themed events: ($750 cost to produce) o Featuring local food trucks, breweries, musicians, etc….$39,000 • Cultural event for the fall- Florida Orchestra --- $31,000 • Weekly Exercise Led Class (Zumba, yoga, tai chi, etc….) $10,000 Resources Needed in Order to begin additional events prior to Imagine Clearwater Project: • 1 FTE for event administrator at Coachman Park. Event administrator would collect insurances, contact vendors, place marketing materials, hire contractors, etc…..$60,000 • Prior to the renovation we would need to do the following for each of these events: o Bring in portalets daily ($20,000) o Add in dumpsters and trash service ($1,000) o Electrician Services to set up events ($8,000) o Cost of all Events Listed Above ($119,000) o Fire Dept / PD Services provided (TBD / week) o Event Staff and Equipment Provided to ensure safety (TBD – week) o Close down the Drew to Cleveland Loop to vehicular traffic Estimated Cost including staff and all listed activities above (with exception of Fire & PD services and event staff per week): $208,000 IMAGINE CLEARWATER THE FUTURE OF OUR WATERFRONT The Estuary: A lush respite for visitors in search of a quiet waterfront experience a short walk from the rest of downtown, the Estuary will also provide a safe and convenient natural experience for Clearwater's young people to enjoy and study for generations to come. The Estuary will replace the previous stormwater pond in Coachman Park and serve as a water quality control device for stormwater runoff. T, ESTUARY The Green: Proceeding down an iconic staircase, visitors will be greeted by the sweeping Green, lined with native shade trees and anchored by a state -of- the -art new bandshell that will dramatically improve the event -going experience at the park. VAY Coachman Garden: Featuring a , modern new playground, with play equipment designed in collaboration with local artists, Coachman Garden will be located steps from the Main Library, providing families with another reason to visit and spend time downtown. 1 The Civic Gateway: A grand entry gateway at the site of the existing Harborview Center will invite pedestrians into the waterfront from Cleveland Street downtown's 'main street.' The Bluff Walk: Tying these sets of diverse experiences together will be the park's Bluff Walk, an active linear promenade that utilizes Clearwater's unique 1 topography, provides unparalleled views, and stitches together the waterfront and downtown. rrag nec earwc3tor.co 0 OSCEOLA AVENLI CLEARWATER BRIGHT AND BEAUTIFUL • BAY TO BEACH IMAGINE CLEARWATER TIMELINE & STATS First Referendum Text to City Council for Vote acres of park space, a 110 increase in what is currently in Coachman Park O Election on First Referendum Fall 2017 O Delegation Hearings on Special Act Amendment Nov. 7, 2017 acres for flexible event use, a 25 % increase when a referendum would come before the residents O Design of Park Elements Complete Solicit Redevelopment Proposals for Harborview site. O miles of new walkway along the Intracoastal million total plan investment miles of new Bluff Walk area the number of years to complete the proposed project Cover Memo City of Clearwater City Hall 112 S. Osceola Avenue Clearwater, FL 33756 File Number: ID#17-3428 Agenda Date: 4/25/2017 Status: City Manager ReportVersion: 1 File Type: ReportIn Control: City Council Agenda Number: 3.7 SUBJECT/RECOMMENDATION: Council discussion topics SUMMARY: ·Councilmember Jonson topics - attached file ·Other Council topics Page 1 City of Clearwater Printed on 4/21/2017 Strategic Plan 1.Report on Strategic Plan Completions 2.Open Items of the Strategic Plan: i.Increase Economic Opportunity: Economic Development Plan Review and Update (Sanderson) –The presentation is scheduled for 4/17 Work Session only. ii.Safety: Coastal Vulnerability Model –What are next steps? (Delk) –Staff is preparing a white paper for future discussion that I have asked them to provide for the upcoming Strategic Planning Council Meeting on April 25th. iii.Foster Community Engagement: Neighborhood Vitality and Health Neighborhood generally The Strategic Plan item proposes Placemaking as a new priority title under the Objective for “Foster Community Engagement” a.Slow conversion to more rentals and less owner occupied b.Need to attract younger families as residents and workers c.Safe neighborhoods (sidewalks, traffic, crime minimization) d.Child friendly neighborhoods 2.Community Health a.Trails b.Walkable City c.Bicycle Friendly City 3.Neighborhoods in “need” –will this be part of the neighborhood placemaking? iv.Diversify our Economic Base: ULI and Imagine Clearwater 1.Implementation plan 2.Funding Strategy (Call/Silverboard) -Staff has an agenda item scheduled for the April 25th Strategic Planning Meeting on Imagine Clearwater, including funding. 3.Partnerships for implementation –P3’s and nonprofits (REH, Chambers, Downtown Partnership, Realtors, property owners) 4.Community communication v.Develop and Promote our Brand [“CLEARWATER” and “BRIGHT AND BEAUTIFUL”, family friendly, tech savvy ]: 1.Septic to Sewer Abeyance [On City Manager’s List] Water Quality of Clearwater Harbor (ULI Report Recommendation) 2.How do we address the attractiveness of our City for our future a.Examples: Countryside Boulevard becoming walled off by fences instead of a landscaped boulevard. 3.Litter and dumping in North Greenwood 4.Community Gateway Enhancement b.Consider for scheduling at a later meeting: i.Working relationship with Scientology –Implementing the ULI model ii.Transportation 1.Alternative transportation modes –ride sharing, autonomous vehicles, elevated alternatives 2.Regional Transportation impact on Clearwater Economy – Premium Transit Corridors Project 3.Beach Access alternatives and SR 60 Corridor [Forward Pinellas efforts] iii.Strategic Plan Communication and Implementing our Plan (Governance) 1.Visibility to the Strategic Plan to the Public –today our strategic plan isn’t readily visible on the web site. 2.John Carver Servant Leadership Model 3.Doing our best & getting things done 4.Beach Access alternatives and SR 60 Corridor [Forward Pinellas efforts] BACKPAGE Bike lanes and other infrastructure draw more cyclists and spur rising property values. pW41 P T. MeM AHO N WHAT IS THE FASTEST-GROWING means of transportation in the United States? The bicycle, according to the U.S. Census Bureau. People bike for many reasons — better health, recreation, transportation, to save money, to run errands. But the biggest reason that bicycling is booming in the United States is the growth in bicycle infrastructure. In 1992, there were only so federally funded bicycle infrastructure projects; last year, there were about 2,500. The Rails - to- Trails Conservancy says there now are more than 1,900 rails -to- trails projects totaling almost 31,00o miles (50,00o km) of safe, off -road bike trails. Bicycle infrastructure also includes many additional miles of grade - separated bike trails, protected bike lanes, and a growing system of bike boulevards (low- traffic streets optimized for cycling). Bicycling is part of a larger shift toward "shared -use mobility," which emphasizes the availability of multiple, shared ways of moving around a city rather than vehicle ownership. Ride shar- ing, car sharing, bike sharing, Uber, Lyft, and autonomous vehicles are all part ofthis larger evolution. Today, for example, there are almost 120 urban bike -share systems in the United States and over 75o worldwide. Just as investments in roads and highways led to automobile - oriented development and public transportation investments led to transit - oriented devel- opment, investments in bicycle infra- structure are now leading to trail- oriented development. This trend is likely to grow because bicycle infrastructure is relatively inexpensive and it provides high levels of return on investment. For instance, Port- land, Oregon —the U.S. city with the high- est percentage of bicycle commuters —has developed a 300 -mile (483 km) network of bike trails, lanes, and boulevards for about EDWARD T. MCMAROM is a sake raided tellew ad Ill Cada rasa Oar for SaaWaaWekvetopmeat ad fwanaeral Mg. We new M oat Arlin Transportation asi lei1st*:lireM9dhater tan use studies ettiryde- 220 URBAN LAND MARCH /APRIL 2017 6o million —about the same cost as one mile (1.6 km) of urban freeway. San Francisco reports that one mile of protected bikeway in the heart of the city cost $445,000. This seems expensive until one considers that reconstruction of a one -mile segment of Doyle Drive cost $571 million and a new one -mile refurbishment of the Bay Bridge cost $2.o7 billion. Pare County, North Carolina, which includes the Outer Banks, reports that a one -time expenditure of $6.7 million to build a bike trail parallel to the beach resulted in a nine -to -one annual return on investment. Bicycling is good for health and the envi- ronment, but it is very good for business, too. Numerous studies show that bike trails increase the value of nearby properties. A study of Indianapolis's Cultural Trail, for example, found that property values within one block of the trail rose 148 percent between 2008 and 2014 —far more than in the city as a whole. Studies of the Minute- man Bikeway in Massachusetts and the Katy Trail in Dallas found that homes near the trails sold faster and for more money than homes farther away. In 2002, the National Association of Realtors reported that walking trails and bike paths were the top neighbor- hood amenity sought by homebuyers. Bicycling can also have a positive impact on retail sales. The New York City Depart- ment of Transportation, for instance, found that installing a mile -long protected bike lane on Ninth Avenue in Manhattan resulted in an estimated 49 percent increase in retail sales for merchants along the route. Another business advantage is that bicycles take up much less space than cars. Ten to 12 bicycles can be parked in the same space as one car. This is sig- nificant when one considers that surface parking spaces cost $3,000 to $4,000 per space; structured parking costs $15,000 to 20,000 per space; and underground park- ing can cost up to $5o,000 per space. The transportation landscape is chang- ing. Bicycle infrastructure is catalyzing real L-7 more competitive. What's not to like? LL j' \' estate investment, and cities that give com- muters more transportation options will be r,")) Bridges, rail corridors find new life as urban trails https: / /www.usatoday.com /story /travel /destinations /IOgreatplaces /20... Bridges, rail corridors find new life as urban trails Larry Bleiberg, Special for USA TODAY 7:54 a.m. ET April 21, 2017 Photo Julienne Schaer, N YCgo. corn) Once seen as urban blight, abandoned industrial corridors and rail lines have been transformed into some of the country's most popular parks and trails. "They've been reborn as places for people," says EchlkIVIIINn of the Washington -based Urban Land Institute. "It's amazing how many cities are embracing their industrial past." He shares some favorite examples with Larry Bleiberg folWbiesiun1 abandoned rail lines into popular parks BeltLine Atlanta Sprawling Atlanta is now home to one of the largest bicycle- and pedestrian - friendly projects in the nation, McMahon says. The BeltLine, a former rail line circling the city, has already has attracted billions of dollars of investment, including Ponce City Market. The former Sears warehouse now houses a food hall, offices and an amusement park on its roof, and even has valet parking for bikes. Eventually reaching 22 miles, the trail already features art displays, yoga sessions and tours. "It's really transforming the city." beltline.orq (http: / /beltline.orq) 606 Trail Chicago When it opened in 2015, this elevated rail line brought badly needed park space to Logan Square and other neighborhoods near downtown Chicago. "It was really kind of neglected," McMahon says. Now it serves bike commuters, runners, dog - walkers and families out for a stroll. "It has had a pretty significant impact there." the606.orq (http: / /the606.orq) Walkway Over the Hudson Poughkeepsie, N.Y. This partially burned railroad trestle had been an eyesore since the 1970s until a local group had the vision to transform it into a park. Stretching more than 1.25 miles, the state of New York calls it the longest elevated pedestrian bridge in the world. "It's not only a great project, but it has led to the redevelopment of downtown Poughkeepsie," McMahon says. walkwavorq (http: / /walkway.orq) Three Rivers Heritage Trail Pittsburgh For decades, the former steel- making giant turned its back on its rivers, reserving its banks for transportation and industry. But in recent years, the city has reclaimed its greenspace with a 24 -mile system of trails. "Pittsburgh has an incredible natural setting, but you really couldn't access the water until it started turning all these rail spurs into trails," McMahon says. friendsoftheriverfront.orq ( http : / /friendsoftheriverfront.orq) Promenade Plantee Paris The world's first elevated park inspired many of the projects on McMahon's list. The nearly 3 -mile esplanade opened in 1988 on a former rail line that passes above neighborhoods and dips through tunnels and trenches. Visitors come for the galleries and shops that have opened in the viaduct's arches, and for the gardens and landscaping, which includes lime and hazelnut trees. en.parisinfo.com (http: / /en.parisinfo.com) Rotary Trail Birmingham, Ala. While many municipalities have found space for trails by looking up to bridges and trestles, this Alabama city looked down and created a linear park in a former railroad cut. The short path includes extensive landscaping, seating and even solar - powered phone charging stations. It connects an award - winning park fashioned from a former railyard with an idled steel plant, preserved as an open -air industrial museum. birminahamal.prq Ihttp: / /birminahamal.org) HighLine New York One of New York's biggest tourist attractions was long slated for demolition. The former West Side rail spur, which opened as an elevated linear park in 2009, has transformed once - scruffy neighborhoods, bringing millions of visitors to places like Chelsea, Hell's Kitchen and the Meatpacking District. "It has leveraged billions of dollars in investments," McMahon says. "It also has gotten the attention of cities big and small that want to replicate it." thehighline.orq (http: / /thehighline.orq) Dequindre Cut Detroit 1 of 2 4/24/17, 10:55 PM Bridges, rail corridors find new life as urban trails https: / /www.usatoday.com /story /travel/ destinations /I Ogreatplaces /20... Motor City does its runners, walkers and bikers proud on this 2 -mile below -grade path once used by the Grand Trunk Western Railroad. During its transformation, builders purposely left the street art and graffiti in place on underpasses, turning it into an urban art gallery. The trail's particularly popular with group bike rides, McMahon says. visitdetroit.com (http: / /visitdetroit.com) Walnut Street Bridge Chattanooga, Tenn. Chattanooga is known internationally for revitalizing its downtown with a riverfront park, an aquarium — and this repurposed 19th - century bridge, McMahon says. The span sat unused for more than a decade before opening to pedestrian traffic in the 1990s. Now the dog - friendly walkway welcomes runners and walkers, and hosts an annual fall wine - tasting that attracts thousands. chattanoogafun.com (http://chattanooqafun.com) Midtown Greenway Minneapolis McMahon calls this trail system "America's first bicycle freeway." Reclaimed from rail lines, it has separate lanes for cyclists and pedestrians. "You can tour the entire city with this network. It has rest stops. They plow it in the winter. It has become a real part of the transportation network." midtownoreenway.orq ( http: // midtownqreenwav .orq %C2 %AD %C2 %AD) Read or Share this story: http: / /usat.ly /2p219fR 2 of 2 4/24/17, 10:55 PM