CLEARWATER HIGH SCHOOL LOCKER ROOM RENOVATIONS AT JACK RUSSELL STADIUMCONSTRUCTION, INC.
CGC1508668
April 18, 2017
TO: Leroy Chin
City of Clearwater — Park, Planning & Project Manger
Parks and Recreation
100 S. Myrtle Ave., Suite 120
Clearwater, FL 33756
RE: CLEARWATER HIGH SCHOOL LOCKER ROOM RENOVATIONS AT JACK
RUSSELL STADIUM
Dear Mr. Chin:
I am pleased to submit the following proposal for the Construction Management of the Clearwater
High School Locker room Renovation at Jack Russell Stadium located at 801 N. Dr. Martin Luther
King Avenue, Clearwater, FL 33755.
Scope of Work
This proposal is complete in accordance with two sets of drawings provided by Plisko
Architecture, P.A. AIA, License # AA C 00813 of 800 Drew St., Clearwater FL 33755 with
consultant Griner Engineering, Inc., Cert. of Auth. 3173. Drawing set 1 originally produced
January 25, 2017 with revisions as noted *, on February 14, 2017. A -1 Title Sheet, A -2 *
Demolition and Floor Plans, A -3 Structural Plans and Specifications, A-4 * Exterior Elevations, A-
5 Interior Elevations, A -6 Reflective Ceiling and Door Schedule, A -6.1 Specifications. And:
Drawing set 2 originally produced January 25, 2017 with revisions as noted *, on February 22,
2017. M -1 Mechanical Plans, M -2 * Mechanical Details & Schedules, M -3 Mechanical
Specifications, E -1 Electrical Schedules and Notes, E -2 * Electrical Plans, E -3 Electrical
Specifications, P4 Plumbing Coversheet, P -2 * Plumbing Plans, P -3 *Plumbing Schedules and
Details.
Specific Exclusions:
Permitting fees or fees paid to utility companies.
Dumpsters or debris haul -off.
Builder's Risk Insurance.
Sodding/Import Fill Materials.
Fencing temporary of permanent.
1
Spike proof carpeting, is an approved method to be used in place of synthetic turf We propose to
perform the aforementioned base scope for the sum of two hundred, twenty -eight thousand and
001100 dollars).
Cost Detail:
4/18/17
LOCKER ROOM RENOVATIONS @ JACK RUSSELL STADIUM
801 N. Drive Martin Luther King Avenue, Clearwater Florida
33755
CSI CODE
Div Summary inci hard bid items
GENERAL REQUIREMENTS
$29,841.50
DEMOLITION
$8,455.00
CONCRETE
$15,720.00
MASONRY
inci
STRUCTURAL STEEL
$839.90
METAL FABRICATIONS
$6,000.00
ROUGH CARPENTRY
$2,117.79
THERMAL AND MOISTURE PROTECTION
$3,426.75
DOORS
$17,708.00
FINISHES
$34,105.91
SPECIALTIES
$3,387.99
MECHANICAL
$19,600.00
PLUMBING
$21,500.00
ELECTRICAL
$22,969.00
TOTAL
$185,671.83
Owner Contingency 5%
Sub -total
$9,283.59
$194,955.42
OH &P
$28,112.57
Bond
$4,932.00
GMP
$228,000.00
Project Duration shall be 120 calendar days from the date of the Notice to Proceed.
2
CONSTRUCTION, INC.
CGC1508668
Existing Contract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clearwater on June 15,
2016, based on RFQ #24 -16.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once the City
receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the
attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not
required)
For work performed, invoices shall be submitted to the City of Clearwater, Engineering
Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida,
33758 -4748. Contingency services may be billed only after written authorization is provided by the
City to proceed with those services.
Countersigned:
Cl €ort( "Cr •At
George N. Cretekos
Mayor
hew M. ith
Assistant City Attorney
Khors Cons
By:
on Khorsandi
President
CITY OF CLEARWATER, FLORIDA
By: -
William B. Horne II
City Manager
Attest:
.v: Rosemarie Ca 1
City Clerk
3
Bond No.:
PUBLIC CONSTRUCTION BOND
(1)
This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for
payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10).
Pursuant to § 255.05(1)(b), Florida Statutes, `Before commencing the work or before recommencing the work after a
default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond.
Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the
public entity may not make a payment to the contractor until the contractor has complied with this paragraph."
CONTRACTOR
Khors Construction, Inc.
12222 Anne Kenia Drive
Thonotosassa, FL 33592
813- 728 -3689
SURETY
FCCI Insurance Group Surety
6300 University Parkway
Sarasota, FL 3424o
OWNER
City of Clearwater
Engineering Department
100 S. Myrtle Avenue
Clearwater, FL 33756
(727) 562-4747
RE: CLEARWATER HIGH SCHOOL LOCKER ROOM RENOVATIONS AT JACK RUSSELL
STADIUM
PROJECT DESCRIPTION: construct a gravity sewer system including approximately 250 LF of gravity sewer piping, 3
precast manholes, and other appurtenances
BY THIS BOND, We Khors Construction, Inc., as Contractor, and FCCI Insurance Group Surety, a corporation, as
Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of $228,000.00, for payment of
which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally.
THE CONDITION OF THIS BOND is that if Contractor:
1. Performs the proposal dated April 18, 2017, between Contractor and Owner for construction of he Clearwater
High School Locker Room the contract documents being made a part of this bond by reference (which include the
Advertisement for Bids, Proposal, Contract, Surety Bond, Instructions to Bidders, General Conditions, Plans, Technical
Specifications and Appendix, and such alterations as may be made in said Plans and Specifications as therein provided
for), at the times and in the manner prescribed in the contract; and
2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor
with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in
the contract; and
3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner
sustains because of a default by Contractor under the contract; and
Bond No.:
PUBLIC CONSTRUCTION BOND
(2)
4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and
employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the
extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or
utilized by Contractor in the performance of the construction contract; and
5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the
contract, then this bond is void; otherwise it remains in full force.
6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time
limitation provisions in Section 255.05(2), Florida Statutes.
7. Any changes in or under the contract documents and compliance or noncompliance with any formalities
connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby
waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to
the specifications.
IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this day of
, 20
(If sole Ownership or Partnership, two (2) Wimesses required).
(If Corporation, Secretary only will attest and affix seal).
WITNESS:
Khors Construction, Inc.
By:
Title: Print Name:
WITNESS:
Corporate Secretary or Witness Print Name:
Print Name:
(affix corporate seal) FCCIInsurance Company
(Power ofAttorney must be attached)
By:
ATTORNEY -IN -FACT
Print Name:
( affix corporate seal)