CERTIIFICA:I, OF SUBSTANTIAL TIAL COMPIrETIO
Project: Sand Key Parkin Lot Contract Number: 15-001 4-EN
Location: 8 371 Gulf Boulevard, Clearwater FL, 33767
Contract Date: 10/12/16 'notice to .Proceed Date:. a: 11117
Substantial Completion Date: 4/27/17 Warranty Expiration Date: 4!27%18
Consultant: Duelel & Associates
The work performed under this Contract has been inspected by authorized representatives of the{fix-vner,
Contractor, and Consultant, and the Project(or specified part of the Project, as indicated above) is hereby
declared to be substantially completed on the above date.
DEFINITION OF SUBSTANTIAL COMPLETION
tW
Suhstantial completion is the,stage in construction when aproject or designated portion 1herc}ofis
sas,ficiently complete in accordance with contract documenis seg that the Owner can use the work or
portion thereof for'° its intended use. Items that gffecl operational integrity,andfunction of 1he work must
he capable ref continuous use.
Duelel & Associates
Consultant Authorized Representative bate
The Contractor accepts the above Certificate of Substantial Completion and agrees to complete and
correct the items on the tentative list within the time indicated.
L
Keystone }excavators, Inc. ley. V�
Contractor J
Authorized Representative Wto
The Owner accepts the specified area of the Protect as Substantially Complete and will assume full
possession of the specified area of the Project on 4127!'2017. The responsibility for utilities, security, and
insurance under the Contract Documents shall be as set forth in the Contract. Documents.
Ivan Dimitrov ley mm t _i
City of Clearwater Authorized Representative Dae
371 S�,,,idet Blvd,
FAX3!Jff OIfrel Baia IF L 34677
F1w(813-8542993
Proposal fpr -5-AND KEY BEACH PARKING LOT
Date October 12,_2016
Revision (if needed)
TO: Daniel Simpson
City of Clearwater—Engineering Department
100 S. Myrtle Ave., Suite 200
Clearwater, FL 33756
RIE: SAND KEY BE PARKING LOT and CITY OF CLEARWATER
ENGINEERING DEPARTMENT PROJECT NUMBER 15-01014-EN
As requested, enclosed is the proposal for demolition of existing features and the
construction of new Asphalt Parking Lot with Landsc4pin , submitted in accordance
with technical specs/plans titled "SAND KEY BEACH PARKING LOT for a
Guaranteed Maximum Price of 187,20&00 .
Selope of'Worlu
Demolish existing curbs, strip grass, remove parking area Geo-Blocks and haul to City
Yard. Excavate/grade area for Curbs, Pavement Base and Asphalt parking Lot . Construct
Concrete Flumes and Skimmer at pond. Excavate and Re:-locate Phoenix Palm tree,
relocate/ adjust Irrigation system, install new Trees, Bushes and Sod .
Cosit t Detail:
F_ :�tion Amount
Fiffo' s,'i of ........................ 75_,1_34.'0
..............
Subtotal
General Conditions/Supervision/lnsur4!1c and .. 4,1400��
Construction Management Flee Included in first item
Continl'�ency jO 1/o $ 7,9l28.0'
Guaranteed Maximum Price $ 87,208.0"
ProjeciDtiration shall be 45 calendar days from the date of the Notice to Proceed.
Existing ('oiritract: This proposal is submitted in conjunction with the existing Construction
Manager at Risk Services Continuing Contract entered into with the City of Clear-water on August
4.1 H.6, based on L t.
. L_
If" GM111 1,"xceeds $150,000: Per Section 111, Article 5.1 of the Contract Specifications, the
contractor shall provide to the public entity a certified copy of the recorded bond. Once the City
receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the
attached bond form as well as the Power of Attorney. (Ij"GAIP i ss than $150,,000 a baura dkv not
required)
for work performed, invoices shall be submitted to the City of Clearwater, Engineering
Departyrient, Attn: Veronica Josef, Senior Staff Assistant, P. . lox 4748, Clearwater, Florida,
33758-4748. Contingency services may be billed only after written authorization is provided by
the City to proceed with those services.
KEYSTONE EXCAVATORS , INC.
By: 01
President
CITY OF CLEARWATER, FLORIDA
By:
MILE
William B. Horne 11
City Manager
2