POND SEDIMENT REMOVAL AT MOCCASIN PARK - 17-0014-EN - PROPOSAL LLC11 41
>,,
rwater
CERTIFICATE OF SIJBSTANTIAL COMPLETION
11rar ect' —Pond n ediment Removal at Moccasin Park Conti-actNumber: 17-0014-EN
1..,ocaataaara: __Northern houndary of tie Larl, east° dead end ofvve F Div
Contract Wtcy 8/9/16 Notice to Proceed apt .n ,127./17
Substantial Completion 1Faaw 6/8/17 Warrant),, F xpiraation Date: 6/8/18
0/8/19 for the potential frarlrarct to the integrity of the existing berrrr underneath the existing
concrete pad and the skirrraaaer° located at the far eastern portion of the pond.
The \vork Iia -11HAareal Under tkais C' ratraact lavas been inspected by authorized representatives of the Owner,
Contractor- and Consultant, and the Project (or- specified part of the Project, as indicated above) is hereby
declared to be sub stanti ally completed on the above date,
DEFINITION OF SUWrANTIAL COMPLETION
S2db,.Iadr"vial c a"nkpletion is the stage in cd)n s°diF"uG'tion when a prf)iect or lues., I acted].7o1"Fion t'1C"r¢`of is
sidl lici rrtlr c oniplete in accordance or{dance avith contract documents,so that the (.darner• can use the rva:ari err.
por°tirrra iher°c?.,#t`car° its irrtemied use. keens that aaffec`t crPerational ince r•itj,atricl,,trrraction (,/,tiler r-tor•k tnusvt
be cccrl,wlrlc clfcontiarr,rcrus use.
lie Contractor accepts the above Certificate sof Substantial Completion and agrees to complete arra/
correct the items arra the tentative list within the time indicated.
-._ _ w .w
Ke.y tcarle Fxclav llor:s, Iraq;. Authorized Representative Date
The t)wner 4:rcc epts the sl)ecifical area of the Project as Substantially Complete and will aasstrraac ball
possesslon o�'ffie specified area of the Project on .lune 8, 2017. The responsibility fcor utilities, security,
and iarawttr'aarac.11 Wilder the, (`taratrarct Documents shall be as set forth in the Contract Documents.
llhuorw, Vo, 1)rarrr c tMam er= B
t:'ity rrf0carrv%,aaer Authorized Representative Date
1
rClearwater Certificate of SubstantialCompletion, Vega
J,
144)JECT' PUNCH LAST
A punch list o, mbar-as to be coinpl.eted or corrected by error l June h, 2017i-4--a- Thisl�l� r l sl 1 list
!1MV no" l're CxEatlsti9te. and the failure to include an item on It does not alter the responsibility of the
ContnacLurs to Cs7mplete all the work in accordance with the Contract Doa;tzttictitxs.
PROJECTONE YEAR WA.RRANTY
Contract Section /I/,
13.5 WARRAN'o"'61CORRECTION PERIOD
11s rtlri a ar+ac z c3a,a'cafac£r the dwe of Subsiantrcrl C'c nipletion or st,rs h 1or7,ger j,)eriod ofrhne as maul%be 1..)re scrrbed'�
bjt 1.M9's crr Regmlaatrarn.s, or b) the terms q,l.una v., sl3cci al�raa(a?-cinice ),echair°ed b. the (`onfraac°t'
1}caca-rrnews or b'v a n"y spec�/lc�pro vision a Contract ontr c°t.Dcac°trrttaynis°, case= 1,17or� r.s, apt.nd to be aaelx c�a��v ,
C'crratraa(tcrr shcd/lrrrprrrlrtlt° avithout cost to the Owner and in accordance ivith the Owner's svrriHe
instructions tat c arrrec;t.sarc h d lcc`trs°c TT'crrk, crr, rl at 1'rca.s°lra'c ra rc t c`led lei tlrc (trs rr�°r, rc rr�cr�3c at' la"r�r]'a Harr arta
and repiaace rt with Hlork that is mart cic,fcc trs c° and Plr1 sca'ta,lfaractcrrdy correct or remove carni replaace carat,c aniaage
to a 1her• TFork air glrc s crrk a.afcrlhers resulting therc(�i�r�rrn..a
TT"haare aic'k,cart'a' sf'm* (canna'(.lcarncaggc tap other T-Vork resulting therefi-orn) lavas been corrected, rcrracrved or
replrac ed lmdc'r"his pure raa la the correction period hereunder ivith,respect' to saech TT'°trrk iviil be extend d'fin—
vara addiliont'd period ref one t'c°car°c jlc'r such c°()rreratticrn or removal and rel-lcrcacrrnent has been.vwis'foc for ily
c`(;tr')r1 pie ae d
Substantial t<ornpletiarrr Date:te. 6/8/17 Warranty Expiration Date: /08/1 AND
6/8/2019 for lh3, polenti l impact to the integrity `the existing berm underneath the existing
taarcrele pad aw the skimmer located at the far eastern portion of the pond.
cop ( 'th's sao,rted 'and executed document should be provided to the following parties:
1 .xcavaalors, lnce
(`itys l'l,"'ic t File
KEYSTONE EXCAVATORS, INC.
CUCO 56698
FPSCV 72520700011996
Date April 7, 2017
371 Scarlet Blvd.
Oldsmar, FL 34677
Phone 813 - 854 -2342 Fax 813 - 854 -2993
Proposal for Pond Sediment Removal at Moccasin Park
TO: Phuong Vo
City of Clearwater — Engineering Department
100 S. Myrtle Ave., Suite 200
Clearwater, FL 33756
RE: POND SEDIMENT REMOVAL at MOCCASIN PARK ,
CITY OF CLEARWATER ENGINEERING PROJECT # 17- 0014 -EN
As requested, enclosed is the proposal for performance of Pond Sediment Removal at Moccasin Park
submitted in accordance with technical specs /plans /study, for a Guaranteed Maximum Price of
$ 77,91000.
Scope of Work:
Set up Erosion Control measures to comply with environmental standards. Bypass Dewatering of Pond,
without creating turbid discharge of waters. Excavate and Stockpile Sediments until material is dry
enough to be properly disposed of Clean up and leave area in same condition as originally found.
Cost Detail:
Description Amount
12 -01
Mobilization / Overhead during
Design -Build process (Oct — Apr)
EA
1
$ 11,250.00
$ 11,250.00
12 -02
EROSION CONTROL, FLOATING
TURBIDITY BARRIER in Pond ,
and Downstream in Creek
LS
1
$ 3,561.00
$ 3,561.00
12 -03
DEWATER Pond, BYPASS PUMPING
for Excavation
LS
1
$ 27,614.00
$ 27,614.00
12 -04
SEDIMENT REMOVAL, by
Excavator /Crew
CY
3,100
$ 7.00
$ 21,700.00
12 -05
LOAD Fill into Trucks /Containers,
for hauling
CY
3,100
$ 1.25
$ 3,875.00
12 -06
Cost for KEYSTONE to Dispose of
Excavated material
CY
3,100
$ 2.00
$ 6,200.00
12 -07
- - - - work Excluded , Not part
of Present Scope of work - - -
12 -08
Re- Grading or Re- Sodding of
* SLOPES* of Pond Is Excluded
$ 0.00
12 -09
Excavation or Grading work in
Inlet / Outlet CREEKS is Excluded
$ 0.00
Subtotal
$ 74,200.00
5 % Contingency
LS
1
$ 3,710.00
$ 3,710.00
Guaranteed Maximum Price
$ 77,910.00
Project Duration shall be 45 calendar days from the date of the Notice to Proceed.
Existing Contract:
This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing
Contract entered into with the City of Clearwater on August 4, 2016, based on RFO #24 -16.
If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall
provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the
recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of
Attorney. (If GMP is less than $150,000 a bond is not required.)
For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn:
Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services
may be billed only after written authorization is provided by the City to proceed with those services.
KEYSTONE EXCAVATORS, INC. CITY OF CLEARWATER, FLORIDA
By:
144-14w.d- pies,
By:
Robert C. Fornwalt William B. Home II
President City Manager
Au,o.