POND SEDIMENT REMOVAL AT MOCCASIN PARK - 17-0014-EN - PROPOSAL LLC11 41 >,, rwater CERTIFICATE OF SIJBSTANTIAL COMPLETION 11rar ect' —Pond n ediment Removal at Moccasin Park Conti-actNumber: 17-0014-EN 1..,ocaataaara: __Northern houndary of tie Larl, east° dead end ofvve F Div Contract Wtcy 8/9/16 Notice to Proceed apt .n ,127./17 Substantial Completion 1Faaw 6/8/17 Warrant),, F xpiraation Date: 6/8/18 0/8/19 for the potential frarlrarct to the integrity of the existing berrrr underneath the existing concrete pad and the skirrraaaer° located at the far eastern portion of the pond. The \vork Iia -11HAareal Under tkais C' ratraact lavas been inspected by authorized representatives of the Owner, Contractor- and Consultant, and the Project (or- specified part of the Project, as indicated above) is hereby declared to be sub stanti ally completed on the above date, DEFINITION OF SUWrANTIAL COMPLETION S2db,.Iadr"vial c a"nkpletion is the stage in cd)n s°diF"uG'tion when a prf)iect or lues., I acted].7o1"Fion t'1C"r¢`of is sidl lici rrtlr c oniplete in accordance or{dance avith contract documents,so that the (.darner• can use the rva:ari err. por°tirrra iher°c?.,#t`car° its irrtemied use. keens that aaffec`t crPerational ince r•itj,atricl,,trrraction (,/,tiler r-tor•k tnusvt be cccrl,wlrlc clfcontiarr,rcrus use. lie Contractor accepts the above Certificate sof Substantial Completion and agrees to complete arra/ correct the items arra the tentative list within the time indicated. -._ _ w .w Ke.y tcarle Fxclav llor:s, Iraq;. Authorized Representative Date The t)wner 4:rcc epts the sl)ecifical area of the Project as Substantially Complete and will aasstrraac ball possesslon o�'ffie specified area of the Project on .lune 8, 2017. The responsibility fcor utilities, security, and iarawttr'aarac.11 Wilder the, (`taratrarct Documents shall be as set forth in the Contract Documents. llhuorw, Vo, 1)rarrr c tMam er= B t:'ity rrf0carrv%,aaer Authorized Representative Date 1 rClearwater Certificate of SubstantialCompletion, Vega J, 144)JECT' PUNCH LAST A punch list o, mbar-as to be coinpl.eted or corrected by error l June h, 2017i-4--a- Thisl�l� r l sl 1 list !1MV no" l're CxEatlsti9te. and the failure to include an item on It does not alter the responsibility of the ContnacLurs to Cs7mplete all the work in accordance with the Contract Doa;tzttictitxs. PROJECTONE YEAR WA.RRANTY Contract Section /I/, 13.5 WARRAN'o"'61CORRECTION PERIOD 11s rtlri a ar+ac z c3a,a'cafac£r the dwe of Subsiantrcrl C'c nipletion or st,rs h 1or7,ger j,)eriod ofrhne as maul%be 1..)re scrrbed'� bjt 1.M9's crr Regmlaatrarn.s, or b) the terms q,l.una v., sl3cci al�raa(a?-cinice ),echair°ed b. the (`onfraac°t' 1}caca-rrnews or b'v a n"y spec�/lc�pro vision a Contract ontr c°t.Dcac°trrttaynis°, case= 1,17or� r.s, apt.nd to be aaelx c�a��v , C'crratraa(tcrr shcd/lrrrprrrlrtlt° avithout cost to the Owner and in accordance ivith the Owner's svrriHe instructions tat c arrrec;t.sarc h d lcc`trs°c TT'crrk, crr, rl at 1'rca.s°lra'c ra rc t c`led lei tlrc (trs rr�°r, rc rr�cr�3c at' la"r�r]'a Harr arta and repiaace rt with Hlork that is mart cic,fcc trs c° and Plr1 sca'ta,lfaractcrrdy correct or remove carni replaace carat,c aniaage to a 1her• TFork air glrc s crrk a.afcrlhers resulting therc(�i�r�rrn..a TT"haare aic'k,cart'a' sf'm* (canna'(.lcarncaggc tap other T-Vork resulting therefi-orn) lavas been corrected, rcrracrved or replrac ed lmdc'r"his pure raa la the correction period hereunder ivith,respect' to saech TT'°trrk iviil be extend d'fin— vara addiliont'd period ref one t'c°car°c jlc'r such c°()rreratticrn or removal and rel-lcrcacrrnent has been.vwis'foc for ily c`(;tr')r1 pie ae d Substantial t<ornpletiarrr Date:te. 6/8/17 Warranty Expiration Date: /08/1 AND 6/8/2019 for lh3, polenti l impact to the integrity `the existing berm underneath the existing taarcrele pad aw the skimmer located at the far eastern portion of the pond. cop ( 'th's sao,rted 'and executed document should be provided to the following parties: 1 .xcavaalors, lnce (`itys l'l,"'ic t File KEYSTONE EXCAVATORS, INC. CUCO 56698 FPSCV 72520700011996 Date April 7, 2017 371 Scarlet Blvd. Oldsmar, FL 34677 Phone 813 - 854 -2342 Fax 813 - 854 -2993 Proposal for Pond Sediment Removal at Moccasin Park TO: Phuong Vo City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 200 Clearwater, FL 33756 RE: POND SEDIMENT REMOVAL at MOCCASIN PARK , CITY OF CLEARWATER ENGINEERING PROJECT # 17- 0014 -EN As requested, enclosed is the proposal for performance of Pond Sediment Removal at Moccasin Park submitted in accordance with technical specs /plans /study, for a Guaranteed Maximum Price of $ 77,91000. Scope of Work: Set up Erosion Control measures to comply with environmental standards. Bypass Dewatering of Pond, without creating turbid discharge of waters. Excavate and Stockpile Sediments until material is dry enough to be properly disposed of Clean up and leave area in same condition as originally found. Cost Detail: Description Amount 12 -01 Mobilization / Overhead during Design -Build process (Oct — Apr) EA 1 $ 11,250.00 $ 11,250.00 12 -02 EROSION CONTROL, FLOATING TURBIDITY BARRIER in Pond , and Downstream in Creek LS 1 $ 3,561.00 $ 3,561.00 12 -03 DEWATER Pond, BYPASS PUMPING for Excavation LS 1 $ 27,614.00 $ 27,614.00 12 -04 SEDIMENT REMOVAL, by Excavator /Crew CY 3,100 $ 7.00 $ 21,700.00 12 -05 LOAD Fill into Trucks /Containers, for hauling CY 3,100 $ 1.25 $ 3,875.00 12 -06 Cost for KEYSTONE to Dispose of Excavated material CY 3,100 $ 2.00 $ 6,200.00 12 -07 - - - - work Excluded , Not part of Present Scope of work - - - 12 -08 Re- Grading or Re- Sodding of * SLOPES* of Pond Is Excluded $ 0.00 12 -09 Excavation or Grading work in Inlet / Outlet CREEKS is Excluded $ 0.00 Subtotal $ 74,200.00 5 % Contingency LS 1 $ 3,710.00 $ 3,710.00 Guaranteed Maximum Price $ 77,910.00 Project Duration shall be 45 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 4, 2016, based on RFO #24 -16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required.) For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. KEYSTONE EXCAVATORS, INC. CITY OF CLEARWATER, FLORIDA By: 144-14w.d- pies, By: Robert C. Fornwalt William B. Home II President City Manager Au,o.