LONG CENTER NATATORIUM LIGHTING RENOVATIONS - 16-0054-PR - PROPOSALProposal Project 16- 0054PR February 14, 2017 TO: Leroy Chin City of Clearwater — Park, Planning & Project Manger Parks and Recreation 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RE: LONG CENTER NATATORIUM LIGHTING RENOVATIONS PROJECT NUMBER 16- 0054PR I am pleased to submit the following proposal for the Construction Management of the Long Center Natatorium Lighting Renovations complete in accordance with the Scope of Work provided by City of Clearwater and dated 12/01/16, plans by Griner Engineer, Inc. dated August 18, 2016 and Revised 11/14/2016 and Plans and Specifications by Griner Engineering, Inc on 08/05/2016. Griner Engineering, Inc drawings : 1 of 6 Cover Sheet & Index, 2 of 6 E101 Electrical Schedules and Notes 3 of 6 E201 Electrical Plans, 4 of 6 E202 Existing Conditions & Proposed Photometric of Pools, 5 of 6 E301 Electrical Details, 6 of 6 E302 System Details; Specific Exclusions: Permitting fees. Dumpsters or debris haul -off. Builder's Risk Insurance. Painting of conduits or raceways. Removal of existing conduits or J- boxes. We propose to perform the aforementioned base scope for the sum of $148,907.56 (one hundred forty -eight thousand, nine hundred, seven and 56/100 dollars). Project Duration shall be 60 calendar days from the date of the Notice to Proceed 1 Cost Detail: Description Amount Cost of Work $104,277.00 Subtotal $104,277.00 General Conditions (or General Conditions/Supervision/Insurance/Bond) $ 9,384.93 Construction Management Fee $ 24,817.93 Contingency 10 % $ 10,427.70 Guaranteed Maximum Price $148,907.56 Project Duration shall be 60 calendar Existing Contract: This proposal Manager at Risk Services Continuing 2016, based on RFO #24 -16. days from the date of the Notice to Proceed. is submitted in conjunction with the existing Construction Contract entered into with the City of Clearwater on June 17, If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Countersigned: a,eorICACre.\405 George N. Cretekos Mayor Assistant City Attorney KHORS CONSTRUCTION, INC. By: KORI KHORSAl4DIAN PRESIDENT CITY OF CLEARWATER, FLORIDA By: William B. Horne II City Manager R Attest: r n a-Lind/91A, ,tie 2 Rosemarie Call City Clearwater