AQUATIC CENTER RENOVATIONS - 16-0035-PR-A - DEMOLITION OF BATH HOUSE, RACQUETBALL STRUCTURE, BASKETBALL COURT AND OTHER MISCELLANEOUS WORKrs CONSTRUCTION, INC. CGC1508668 February 27, 2017 TO: Leroy Chin City of Clearwater — Park, Planning & Project Manger Parks and Recreation 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RECEIVED MAR 0 2 20!? Parks & Recreation RE: PROJECT NO: 16- 00035 -PR - -A A - AQUATIC CENTER RENOVATIONS B DEMOLITION OF BATH HOUSE, RACQUETBALL STRUCTURE, BASKETBALL COURT & OTHER MISCELLANEOUS WORK Dear Mr. Chin: I am pleased to submit the following proposal for the Construction Management of the Morningside Recreation Center Project as listed above. This proposal is complete in accordance with the Scope of Work provided by City of Clearwater and dated January 2, 2017, which includes: for 16- 0035 -PR -A; technical specifications of pool work renovations provided by GB Collins Engineering PA, plans by Griner Engineer, Inc. and Wannamaker Jensen Architects, Inc. And for 16- 00035 -PR -B Technical specification of demolition and other miscellaneous work as shown on drawings developed by Deuel & Associates and the Report of Neshap Demolition Survey, Sampling and Evaluation of Asbestos - Containing Materials for Eastern Building in Pool Complex by Greenfield Environmental on April 5, 2016, and Existing Conditions Overall Survey provided by Deuel Associates dated April 11, 2106. Wannemacher Jansen Architects, Inc. for Basketball Court Retaining Wall January 9, 2017, Specific Exclusions: Permitting fees or fees paid to utility companies. Dumpsters or debris haul -off. Builder's Risk Insurance. Sodding/Import Fill Materials. Fencing temporary of permanent. We propose to perform the aforementioned base scope for the sum of $564,095.08 five hundred sixty -four thousand, ninety -five, and 08/100 dollars). 1 Cost Detail: Description Amount Cost of Work $420,050.35 Subtotal $420,050.35 General Conditions (or General Conditions/Supervision/Insurance/Bond) $ 48,905.09 Construction Management Fee $ 68,277.97 Contingency 5% $ 26,861.67 Guaranteed Maximum Price $564,095.08 Project Duration shall be 75 calendar days from the date of the Notice to Proceed. Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on June 15, 2016, based on RFQ #24 -16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not require(L) For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Countersigned: 4t,P0 r LQnCr 04O5 George N. Cretekos Mayor Appr ved . s � form a i ew M. ''th Assistant City • ttorney Khors Consti netlen�n BY: CKori Khorsandian President CITY OF CLEARWATER, FLORIDA By: W :a William B. Horne II City Manager 2 Attest: Rosemarie Call City Clerk