Loading...
ADMINISTRATIVE CHANGE ORDER #1 & FINAL - 16-0036-EN• ADMINISTRATIVE CHANGE ORDER 1 & Final PROJECT: Park Place Roadway Repairs CONTRACTOR: Keystone Excavators Inc. 371 Scarlet Blvd Oldsmar, F134677 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT January 26, 2017 16- 0036 -EN ST113312 October 5, 2016 October 5, 2016 CODE: 15- 92277 - 563700 -541- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT to decrease, increase and add items due to unforseen conditions - see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 & Final -City NEW CONTRACT AMOUNT APPROV D A T P' S R : Matthe Smith, $ 243,977.80 $ (4,121.70) $ 239,856.10 ACCEPTED BY: Keystone Excavators Inc. Robert C Fornwalt Date: Jc� Z(D, 2017 itnesses: ATTEST: Rosemarie Call, Assistant City Attorney Date: ,(M�chc,Q\ �e. ti � Lere c. ca..s �a rc, Sw w.eS Recommended By: City of Cle (SEAL) President &a/ CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager Nabil Bawany, ichael D Quillen, PE, oject Manager City Engineer RE: Administrative Change Order 1 & Final - Park Place Roadway Repairs ITE M DESCRIPTION UNIT QTY UNIT COST TOTAL COST Northern Park Place Decreases: 3.35 Point repair on leaking sewer pipe LS 1 $ 2,430.00 $ (2,430.00) 4.11 Milling of paving SY 226 $ 4.50 $ (1,017.00) 4.16 Type S -111 asphalt paving (figured as 2" TN 45 $ 140.00 $ (6,300.00) thick) Increases: 1.2 Maintenance of Traffic LS 3.2631 $ 4,123.50 $ 13,455.20 4.5 City modififed curb LF 30.5 $ 22.00 $ 671.00 5.06 Sod restoration (in kind) SF 100 $ 0.70 $ 70.00 9.03 Replace landscape plants EA 1 $ 250.00 $ 250.00 Total increases Northern Park Place: $ 14,446.20 Total (decreases) Northern Park Place: $ (9,747.00) Additions: 2.15 Irrigation Lines re -work replace LF 180 $ 4.50 $ 810.00 2.16 Adjust valve traffic control boxed EA 3 $ 325.00 $ 975.00 2.17 Pine bark mulch, for landscape BAGS 8 $ 20.00 $ 160.00 3.16 Concrete curb /wall 8" wide x 24" Tall LF 83 $ 57.50 $ 4,772.50 4.1 8" Road base (LBR 100) SY 521 $ 18.00 $ 9,378.00 4.2 12" Sstabilized subgrade (LBR 40) SY 521 $ 9.00 $ 4,689.00 4.3 Straight curb LF 23 $ 21.00 $ 483.00 4.6 City type I Curb LF 92 $ 22.00 $ 2,024.00 4.8 4" Concrete sidewalk SF 757 $ 6.00 $ 4,542.00 4.9 Concrete Driveway Restoration SF 20 $ 7.00 $ 140.00 4.10 Pedestrian ramps w /detectable warning EA 2 $ 950.00 $ 1,900.00 Total Additions: $ 29,873.50 Total net (decreases) /increases /additions Northern Park Place: $ 34,572.70 Southern Park Place: Decreases: 4.11 Milling Paving (usefor Concrete SY 263.6 $ 5.00 $ (1,318.00) and Brick Paver Demolition) 4.2 12" Stabilized subgrade(LBR40) SY 263.6 $ 9.00 $ (2,372.40) 4.1 8" Road base (LBR 100) SY 263.6 $ 18.00 $ (4,744.80) 4.16 Type S -111 Asphalt paving (Figured TN 45.21 $ 140.00 $ (6,329.40) as 2" thick) 5.6 Sod restoratin(in kind) SF 2500 $ 0.70 $ (1,750.00) Total (decreases) Southern Park Place: $ (16,514.60) 6 10% Contingency LS 1 $ 22,179.80 $ (22,179.80) Total net (decreases) /increases /additions Park Place Roadway Repairs: $ (4,121.70)