ADMINISTRATIVE CHANGE ORDER #1 & FINAL - 16-0036-EN•
ADMINISTRATIVE CHANGE ORDER 1 & Final
PROJECT:
Park Place Roadway Repairs
CONTRACTOR:
Keystone Excavators Inc.
371 Scarlet Blvd
Oldsmar, F134677
DATE:
PROJECT NUMBER:
PO REFERENCE:
COUNCIL AWARD:
DATE OF CONTRACT
January 26, 2017
16- 0036 -EN
ST113312
October 5, 2016
October 5, 2016
CODE: 15- 92277 - 563700 -541- 000 -0000
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
to decrease, increase and add items due to unforseen conditions - see details attached.
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Admin Change Order 1 & Final -City
NEW CONTRACT AMOUNT
APPROV D A T P' S R :
Matthe Smith,
$ 243,977.80
$ (4,121.70)
$ 239,856.10
ACCEPTED BY: Keystone Excavators Inc.
Robert C Fornwalt
Date: Jc� Z(D, 2017
itnesses:
ATTEST:
Rosemarie Call,
Assistant City Attorney
Date:
,(M�chc,Q\ �e. ti
� Lere
c. ca..s �a rc, Sw w.eS
Recommended By:
City of Cle
(SEAL)
President
&a/
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
William B. Horne, II
City Manager
Nabil Bawany,
ichael D Quillen, PE,
oject Manager
City Engineer
RE: Administrative Change Order 1 & Final - Park Place Roadway Repairs
ITE
M DESCRIPTION UNIT QTY UNIT COST TOTAL COST
Northern Park Place
Decreases:
3.35 Point repair on leaking sewer pipe LS 1 $ 2,430.00 $ (2,430.00)
4.11 Milling of paving SY 226 $ 4.50 $ (1,017.00)
4.16 Type S -111 asphalt paving (figured as 2" TN 45 $ 140.00 $ (6,300.00)
thick)
Increases:
1.2 Maintenance of Traffic LS 3.2631 $ 4,123.50 $ 13,455.20
4.5 City modififed curb LF 30.5 $ 22.00 $ 671.00
5.06 Sod restoration (in kind) SF 100 $ 0.70 $ 70.00
9.03 Replace landscape plants EA 1 $ 250.00 $ 250.00
Total increases Northern Park Place: $ 14,446.20
Total (decreases) Northern Park Place: $ (9,747.00)
Additions:
2.15 Irrigation Lines re -work replace LF 180 $ 4.50 $ 810.00
2.16 Adjust valve traffic control boxed EA 3 $ 325.00 $ 975.00
2.17 Pine bark mulch, for landscape BAGS 8 $ 20.00 $ 160.00
3.16 Concrete curb /wall 8" wide x 24" Tall LF 83 $ 57.50 $ 4,772.50
4.1 8" Road base (LBR 100) SY 521 $ 18.00 $ 9,378.00
4.2 12" Sstabilized subgrade (LBR 40) SY 521 $ 9.00 $ 4,689.00
4.3 Straight curb LF 23 $ 21.00 $ 483.00
4.6 City type I Curb LF 92 $ 22.00 $ 2,024.00
4.8 4" Concrete sidewalk SF 757 $ 6.00 $ 4,542.00
4.9 Concrete Driveway Restoration SF 20 $ 7.00 $ 140.00
4.10 Pedestrian ramps w /detectable warning EA 2 $ 950.00 $ 1,900.00
Total Additions: $ 29,873.50
Total net (decreases) /increases /additions Northern Park Place: $ 34,572.70
Southern Park Place:
Decreases:
4.11 Milling Paving (usefor Concrete SY 263.6 $ 5.00 $ (1,318.00)
and Brick Paver Demolition)
4.2 12" Stabilized subgrade(LBR40) SY 263.6 $ 9.00 $ (2,372.40)
4.1 8" Road base (LBR 100) SY 263.6 $ 18.00 $ (4,744.80)
4.16 Type S -111 Asphalt paving (Figured TN 45.21 $ 140.00 $ (6,329.40)
as 2" thick)
5.6 Sod restoratin(in kind) SF 2500 $ 0.70 $ (1,750.00)
Total (decreases) Southern Park Place: $ (16,514.60)
6 10% Contingency LS 1 $ 22,179.80 $ (22,179.80)
Total net (decreases) /increases /additions Park Place Roadway Repairs: $ (4,121.70)