2013-14 SANITARY SEWER AND MANHOLE REHABILITATION - 14-0025-UT - CHANGE ORDER #2
CHANGE ORDER 2 PROJECT: 2013 -14 Sanitary Sewer and Manhole Rehabilitation - Sanitary Sewer Emergency Repair CONTRACTOR: Rowland Incorporated 6855- 102nd Avenue North Pinellas Park, F1 33782 DATE: PROJECT NUMBER: PO REFERENCE: COUNCIL AWARD: DATE OF CONTRACT: December 30, 2016 14- 0025 -UT ST111380 February 5, 2015 February 27, 2015 CODE A: 0315- 96665 - 563800 -535- 000 -0000 CODE B: 0315- 96664 - 563800 -535- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT to increase and add items for Emergency Repair at Sand Key - see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1- City Council- 10/31/2016 Change Order 2 - City Council 1/17/2017 NEW CONTRACT AMOUNT $1,000,000.00 $ 750,000.00 $ 339,757.89 $2,089,757.89 Assistant City Attorney George N Cretekos, ATTEST: Pik (t t. 4..L Rosemarie Call, or ACCEPTED BY: Rowland Incorpor B Witnesses: • ll Re •mm ni,• y: Date: _auttLaA J-617 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager City of Clearwater (4)resi Lan -Anh Nguyen, PE, 1 _ L Michael D Quillen, PE, c Project Manager City Engineer w • Page 2 of 2 RE: Change Order 2 2013 -14 Sanitary Sewer and Manhole Rehabilitation Sanitary Sewer Emergency Repair ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Code A: Increases: C. SEWER PIPE, FORCE MAIN, AND MANHOLE EMERGENCY REPAIR 1 Mobilization LS 1 $ 225.00 $ 225.00 3 Labor Hour Foreman - regular time PH 116 $ 66.00 $ 7,656.00 Foreman - overtime PH 38.5 $ 76.00 $ 2,926.00 Operator - regular time PH 201.5 $ 53.00 $ 10,679.50 Operator - overtime PH 27.5 $ 63.00 $ 1,732.50 Truck Driver - regular time PH 70 $ 43.00 $ 3,010.00 Truck Driver - overtime PH 12 $ 53.00 $ 636.00 Pipe Layer - reguar time PH 228.5 $ 46.00 $ 10,511.00 Pipe Layer - overtime PH 33 $ 56.00 $ 1,848.00 Laborer - regular time PH 225 $ 41.00 $ 9,225.00 Laborer - overtime PH 29 $ 51.00 $ 1,479.00 4 Equipment Foreman P/U with hand tools PH 154.5 $ 28.00 $ 4,326.00 Job truck with tools PH 183 $ 36.00 $ 6,588.00 Tractor & Trailer (Transport) PH 7 $ 25.00 $ 175.00 Track Hole (to 100 HP) PH 70 $ 95.00 $ 6,650.00 Track Hole (101 HP to 170 HP) PH 27 $ 130.00 $ 3,510.00 Wheel Loader (to 150 HP) PH 199.5 $ 65.00 $ 12,967.50 Track Type Tractors (to 100 HP) PH 14 $ 22.00 $ 308.00 Dump Truck (Tandem Axle) PH 37 $ 72.00 $ 2,664.00 Plate Tamp PH 13 $ 6.00 $ 78.00 3" Trash Pump PH 26 $ 6.00 $ 156.00 Well Point Pump Per Day 4 $ 100.00 $ 400.00 Well Point LF 160 $ 26.00 $ 4,160.00 5 Materials Off Site Selected Fill CY 90 $ 4.00 $ 360.00 Limerock Base Material TN 54.74 $ 25.00 $ 1,368.50 #57 Washed Stone TN 32.7 $ 40.00 $ 1,308.00 Bahia Sod SF 8650 $ 0.60 $ 5,190.00 Total Increases: $ 100,137.00 Additions: 6 Tanker Trucks LS 1 $ 131,055.00 $ 131,055.00 7 18" HDPE By -Pass LS 1 $ 44,497.15 $ 44,497.15 8 16" DI pipe LS 1 $ 5,980.91 $ 5,980.91 9 Concrete DW &Curb LS 1 $ 3,779.86 $ 3,779.86 10 Asphalt Paving & Markings LS 1 $ 18,200.00 $ 18,200.00 11 MOT & Flagman LS 1 $ 7,181.51 $ 7,181.51 12 16" MJ Sleeve & Megalugs LS 1 $ 2,343.31 $ 2,343.31 13 2" Air Release Assembly LS 1 $ 1,369.80 $ 1,369.80 14 Pump out Lift Station LS 1 $ 1,662.50 $ 1,662.50 11 Miscellaneous & Markup LS 1 $ 23,550.85 $ 23,550.85 Total Additions $ 239,620.89 Total Increases /Additions Code A: $ 339,757.89