Loading...
2015 SIDEWALK CONSTRUCTION PROJECT - 14-0044-EN - ADMINISTRATIVE CHANGE ORDER #2 & FINALAdministrative Change Order 2 & Final PROJECT 2015 Sidewalk Construction Project CONTRACTOR: Central Florida Contractors P.O. Box 3987 Seminole, Florida 33775 Date: PROJECT NUMBER: PO REFERENCE NO.: COUNCIL AWARD: SCOPE OF CHANGE: DATE OF CONTRACT: December 15, 2016 14- 0044 -EN ST112030 September 3, 2015 September 25, 2015 CODE A. )315- 92339 - 563700 -541- 000 -0000 CODE B: 0315- 92277 - 563700 -541- 000 -0000 THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing unused, increasing and adding items according to field conditions - See details attached STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council 4/7/2016 Administrative Change Order 2 - City Manager NEW CONTRACT AMOUNT t.. tyt Rosemarie Call Date: $237,644.11 $ 138,327.20 $6,582.19 $382,553.50 CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA tiO-c&A, 414-A4u--21.. A4k William B. Horne, II APPROVED AS TO FORM: City Manager atthew Smith, Assistant City Attorney ACCEPTED BY B lorida Contractors, Ifli. George omes Date: /A/at./fi, Witnesses: (two) (Seal) Presid i Recommended By: City of Clearwater Tara Kivett Construction Manager Michael D Quillen, PE, City Engineer Page 2 of 3 AdministrativeChange Order 2 - 2015 Sidewalk Contract ITEM DESCRIPTION UNIT (qty UNIT COST TOTAL COST Code A: 0315-92339-563700-541-000-0000 Decreases: 1.1 Maintenance of Traffic LS 0.13 $6,000.00 ($800.00) 1.5 Root Pruning LF 55 $5.00 ($275.00) 1.6 Sprinklers (Yard Frontage) (Sec. IVa) LF 400 $8.00 ($3,200.00) 1.9 Tree Protection (Modification to LF 58 $10.00 ($580.00) Proposed Sidewalk Construction) 1.12 Relocate Wooden Bollards EA 24 $150.00 ($3,600.00) 1.13 Compacted Fill CY 221 $25.00 ($5,525.00) 1.14 Gravel Fill CY 5.9 $60.00 ($354.00) 1.15 Rip Rap (6" nominal diameter) CY 4 $150.00 ($600.00) 1.16 15" RCP LF 90 $90.00 ($8,100.00) 1.19 Getextile Fabric SF 300 $1.00 ($300.00) 2.3 6" Thick Concrete Driveway (3000 psi SF 2 $4.50 ($9.00) w /fiber mesh reinforcing) 2.6 FDOT Gravity Wall (Max Height 24 ") LF 173 $60.00 ($10,380.00) 2.8 Construct Concrete Pad & ADA EA 3 $850.00 ($2,550.00) Warning Mat (Cleveland St.) 2.9 Modify Rollen Road Inlet Tops (See EA 3 $1,400.00 ($4,200.00) Detail) 3.1 School Crossing Striping removal and LS 1 $2,000.00 ($2,000.00) re- installation 3.2 6" White Thermoplastic Walkway LF 1110 $5.00 ($5,550.00) Striping on existing asphalt 3.3 Pedestrian marking on walkways every EA 14 $100.00 ($1,400.00) 50 LF 3.4 New Sidewalks Contingeny 10% LS 1 $33,008.50 ($33,008.50) Total (Decreases) Code A: ($82,431.50) Increases: 1.7 Sod SF 8936 $0.50 $4,468.00 1.11 Silt Fence LF 15 $5.00 $75.00 2.1 4" Thick Concrete Sidewalk (3000psi SF 6305 $4.00 $25,220.00 w /fiber mesh reinforcing & wwf) 2.2 6" Thick Concrete Sidewalk (3000 psi SF 315 $4.50 $1,417.50 w /fiber mesh reinforcing & wwf) 2.4 Install Detectable Warning Mats on EA 12.5 $800.00 $10,000.00 existing sidewalk ramps 2.5 Construction ADA Ramp with EA 40 $1,000.00 $40,000.00 Detectable Warning Mats 2.7 Remove and Construct Transition curb LF 101 $18.00 $1,818.00 as required (ADA Ramps) Total Increases Code A: $82,998.50 Additions: 2.1 6 "x12" straight curb LF 626 $18.00 $11,268.00 2.11 Pipe under drain LF 33 $70.00 $2,310.00 2.12 Footing for handrail LF 17 $10.00 $170.00 2.13 42" FDOT Guardrail LF 30 $80.00 $2,400.00 2.14 2'x6" landscape wall LF 61 $45.00 $2,745.00 Total Additions Code A: $18,893.00 Total Net (Decreases)/Increases /Additions Code A: $19,460.00 Code VB:0315- 92277 - 563700 -541- 000 -0000 Decreases: 4.1 Root Pruning LF 79 $8.00 ($632.00) 4.2 Sod SF 2150 $0.50 ($1,075.00) 5.1 4" Thick Concrete Sidewalk (3000psi SF 1600 $5.00 ($8,000.00) w /fiber mesh reinforcing & wwf) 5.2 6" Thick Concrete Sidewalk (3000 psi SF 200 $5.90 ($1,180.00) w /fiber mesh reinforcing & wwf) 5.3 6" Thick Concrete Driveway (3000 psi SF 139 $5.90 ($820.10) w /fiber mesh reinforcing) 5.4 Sidewalks Remove and Replace LS 1 $1,170.71 ($1,170.71) Contingency 10% Total (Decreases) Code B: ($12,877.81) Total Net (Decreases) Code B: ($12,877.81) Total Net (Decrease)/Increase /Additions to the Contract: $6,582.19