Loading...
SR 60 HIGHLAND AVENUE TO DAMASCUS SANITARY SEWER REHABILITATION & WATER MAIN RELOCATIONS DEPARTMENT PROJECT NUMBER 2016037Date: 10/27/16 NQV 01 2.416 TO: Don Melone City of Clearwater — Engineering Department 100 S. Myrtle Ave., Suite 220 Clearwater, FL 33756 Wharton - Smith, Inc. CONSTRUCTION GROUP RE: SR 60 Highland Avenue to Damascus Sanitary Sewer Rehabilitation & Water Main Relocations DEPARTMENT PROJECT NUMBER: 2016037 Wharton- Smith, Inc. (WS!) is pleased to submit our proposal in response to the request to relocate the sewer and water utility lines on S Belcher Rd and Gulf -to -Bay Blvd in accordance with the plans prepared by the city of Clearwater engineering department dated 3/30/16 and the waterline drawing plan added on 9/27/16, for a Guaranteed Maximum Price of $696,868.70. Scope of Work: This proposal includes the work associated to off -set the water main on the northwest corner of Belcher Rd, the replacement of 20' of sewer line at seven (7) locations on SR -60, off -set 210 If of 8" water main and replace 20 If of 6" water main at northeast corner of Belcher Rd., and replace and relocate 215 If of 8" sewer main. The basis of our proposal shall include: • All traffic maintenance and MOT barricades. • Demolition of concrete and asphalt as necessary. • Temporary removal of street light poles and rewiring to keep other lights operational at night. • Demolition of existing pipe. • Excavation, dewatering, shoring and trench protection, installation of new pipe and valves, reverse deadman as necessary. • Installation of service laterals are by others. • Installation of line stops as necessary to complete work. • Pressure testing, disinfection and bactees of the water lines. • Soils testing to confirm compaction per FDOT requirements. • Asphalt patches as required for work on the water main off -set on Belcher. • Replacement of any sidewalk are by others. 4912 LaSalle Street • Tampa, Florida 33607 • (813) 288 -0068 • Fax: (813) 288 -0371 CG C032669 PC C048385 CU C056506 4i4) Wharton- Smith, Inc. CONSTRUCTION GROUP • TV inspection of sewer after work is completed. • As- builts of installed lines. • Landscaping & Irrigation are to be installed by others. • If contaminated or unsuitable soil is encountered during excavation. a negotiated fee will be established to remove and replace this material. • Signalization repair is provided by others. • No grade profile on the extra waterline work, assume depths are at max 5'. Anything over 5' deep will need to be renegotiate for extra time and dewatering. • Permits are by others. A detailed breakdown of the scope of work is provided in Attachment A. Working adjacent to a state road 60, WSI will be required to manage the project activities as well as coordination with FDOT and the FDOT contractor. WSI would provide a highly qualified team of professionals to successfully manage this project which has a short and concentrated scope and schedule. All work will be performed at night, during non -peak traffic hours. WSI will be attending all required meetings with the FDOT contractor. We will be coordinating and scheduling work and work zone impacts with the FDOT contractor and the city of Clearwater for the duration of the project. The logistics and the timing of the work will be critical so that there is little impact to traffic patterns and the work being performed by the FDOT contractor. WSI also intends to be part of any community meeting required to discuss the project impacts with the community. WSI will coordinate and verify that all work is in compliance with FDOT guidelines and regulations. This proposal includes a $25,000 allowance for soil testing activities and $10,000 allowance for relocation of street Tight poles. As these funds are an allowance, any funds that are not spent will be forfeited back to the City of Clearwater. 4912 LaSalle Street • Tampa, Florida 33607 • (813) 288 -0068 • Fax: (813) 288 -0371 CG C032669 PC C048385 CU C056506 Cost Detail: Wharton- Smith, Inc. CONSTRUCTION GROUP Description Amount Cost of Work Sanitary Sewer Rehabilitation $265,510.00 General Conditions (or General Conditions /Supervision /Insurance /Bond) $53,611.21 Construction Management Fee $25,529.59 Sewer Subtotal $344,650.80 10% Contingency $34,465.08 Sewer Total $379,115.88 Water Relocations $222,535.00 General Conditions (or General Conditions /Supervision /Insurance /Bond) $44,933.79 Construction Management Fee $21,397.41 Water Subtotal $288,866.20 10% Contingency $28,886.62 Water Total $317,752.82 Guaranteed Maximum Price $696,868.70 Project Duration shall be _85_ calendar days from the date of the Notice to Proceed. A breakdown of duration of each item is provided in attachment B. These line items will be performed concurrently so that the project is completed within 85 calendar days. 4912 LaSalle Street • Tampa, Florida 33607 • (813) 288 -0068 • Fax: (813) 288 -0371 CG C032669 PC C048385 CU C056506 Wharton- Smith, Inc. CONSTRUCTION GROUP Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on August 19, 2016, based on RFO #24 -16. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. For work performed, invoices shall be submitted to the City of Clearwater, Engineering Department, Attn: Veronica Josef, Senior Staff Assistant, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. We appreciate the opportunity and look forward to working with you to make this project a success for all stake - holders. Countersigned: ' qw C't tros George N. Cretekos Mayor Approve d as Ma hwM.S Assistant City Attorney CONTRACTOR COMPANY NAME B Todd O'Do Division Mana r CITY OF CLEARWATER, FLORIDA illiam B. Horne II City Manager Attest: t,<LLn2LCC2u. L.' ez.te Rosemarie Call City Clerk Page 2