Loading...
CR 193 - GROVE CIRCLE AND BELCHER AREA SANITARY SEWER SYSTEMS - 13-0049-UT - ADMINISTRATIVE CHANGE ORDERAdministrative Change Order 1 & Final PROJECT: CR 193, Grove Circle and Belcher Area Sanitary Sewer Systems CONTRACTOR: Dallas 1 Construction and Development 10328 Main Street Date: PROJECT NUMBER: PO REFERENCE: AWARD DATE: CONTRACT DATE: August 31, 2016 13- 0049 -UT ST111763 May 21, 2015 June 4, 2015 Thonotosassa, Fl 33592 CODE: 0315- 96630 - 563800 -535- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT Decreases unused bid items - see attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 &Final - CM NEW CONTRACT AMOUNT APPROVED AS ACCEPTED BY: $ 3,048,809.50 $ (731,031.20) By. $ 2,317,778.30 Bart Azzarelli, J Poole & Kent Co ofFlorida Matthew Smit ATTEST: Rosemarie Call, Assistant City Attorney Date: S-31-14, CEO, AFC' esses: Date: ecommended By: City of Clearwater CITY OF CLEARWATER, IN PINELLAS COUNTY, FLORIDA 4 a William B. Horne, II, z�r City Manager Michael D. Quillen, P Project Manager City Engineer Page 2 of 3: Administrative Change Order 1 &Final CR193, Grove Circle and Belcher Area Sanitary Sewer Systems (13- 0019 -UT) ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST Decreases: 4 Furnish and Install 8" PVC SDR -26 Gravity LF 262 $ 200.00 $ (52,400.00) Sewer Pipe 5 Furnish and Install 8" Ductile Iron Gravity LF 20 $ 130.00 $ (2,600.00) Sewer Pipe 6 Remove Existing Vitrified Clay Pipe (VCP) LF 212 $ 2.30 $ (487.60) Pipe 7 Furnish and Install Relocated Water Main - 4" LF 100 $ 140.00 $ (14,000.00) DIP 8 Furnish and Install Relocated Water Main - 6" LF 91 $ 140.00 $ (12,740.00) DIP 9 Furnish and Install Ductile Iron Fittings TON 1.5 $ 9,560.00 $ (14,340.00) 10 Replace Water Service Lateral Pipe EA 25 $ 300.00 $ (7,500.00) 11 4" MJ RWGV EA 4 $ 850.00 $ (3,400.00) 12 6" MJ RWGV EA 4 $ 1,030.00 $ (4,120.00) 13 Furnish and Install 4" Line Stop EA 4 $ 2,790.00 $ (11,160.00) 14 Furnish and Install 6" Line Stop EA 4 $ 3,290.00 $ (13,160.00) 20 Furnish and Install Sewer Street Lateral and EA 2 $ 1,880.00 $ (3,760.00) Cleanout 21 Furnish and Install Sewer Service Lateral EA 14 $ 4,630.00 $ (64,820.00) 22 Abandon Existing Septic Tank EA 3 $ 770.00 $ (2,310.00) 24 Furnish and Install Flowable Fill CYD 37 $ 140.00 $ (5,180.00) 25 Export Unsuitable Materials CYD 2980 $ 11.00 $ (32,780.00) 26 Import of Select Fill Material CYD 4050 $ 23.00 $ (93,150.00) 28 Mill and Resurface Asphalt (Phase 2 Restoratic SY 433 $ 11.00 $ (4,763.00) 31 As- Requested Concrete Curb and Gutter LF 100 $ 36.00 $ (3,600.00) Replacement 32 Private Property Root Pruning LF 2,957 $ 9.70 $ (28,682.90) 33 Public Right -of -Way Root Pruning LF 1,818 $ 8.80 $ (15,998.40) 34 Private Property Tree Removal Trunk EA 13 $ 320.00 $ (4,160.00) Diameter 4 -inch to 12 -inch 35 Private Property Tree Removal Trunk EA 8 $ 2,080.00 $ (16,640.00) Diameter 13 -inch to 24 -inch 37 Private Property Tree Removal Trunk EA 1 $ 5,800.00 $ (5,800.00) Diameter 37 -inch to 48 -inch 38 Private Property Tree Removal Trunk EA 1 $ 7,400.00 $ (7,400.00) Diameter 49 -inch or Greater 39 Right -of -Way Tree Removal Trunk Diameter EA 10 $ 200.00 $ (2,000.00) 4 -inch to 12 -inch 40 Right -of -Way Tree Removal Trunk Diameter EA 9 $ 1,700.00 $ (15,300.00) 13 -inch to 24 -inch 41 Right -of -Way Tree Removal Trunk Diameter EA 5 $ 3,200.00 $ (16,000.00) 25 -inch to 36 -inch 42 Right -of -Way Tree Removal Trunk Diameter EA 5 $ 4,975.00 $ (24,875.00) 37 -inch to 48 -inch 43 Right -of -Way Tree Removal Trunk Diameter EA 2 $ 6,600.00 $ (13,200.00) 49 -inch or Greater 44 Pinellas County Sewer Lateral Connection LS 1 $ 7,500.00 $ (7,500.00) Building Permit Fee Allowance Page 2 of 3: Administrative Change Order 1 &Final- CR193, Grove Circle and Belcher Area Sanitary Sewer Systems (13- 0019 -UT) ITEM DESCRIPTION UNIT QTY 45 Sewer 10% Contingency LS 1 $ 46 Stormwater System 10% Contingency LS 1 $ Increases: 3 Furnish and Install 8" PVC SDR -35 Gravity LF Sewer Pipe 36 Private Property Tree Removal Trunk EA Diameter 25 -inch to 36 -inch Additions: 47 Sewer Conflict and Piezometer Installation 48 Regrade Swale 49 Pleasant Parkway Asphalt Elevations 50 Mill and Resurface Bell Drive 51 Gravel Installation at Bell Drive EA EA LS SY SY UNIT COST TOTAL COST 276,484.50 $ (276,484.50) 680.00 $ (680.00) Total (Decreases): $ (780,991.40) 21 $ 120.00 $ 3 $ 3,600.00 Total Increases: $ 1 $ 3,449.70 $ 1 $ 3,565.50 $ 1 $ 20,535.00 $ 539 $ 11.00 $ 109 $ 29.00 $ Total Additions: $ 2,520.00 $10,800.00 13,320.00 3,449.70 3,565.50 20,535.00 5,929.00 3,161.00 36,640.20 Total Net (Decreases)/Increases /Additions: $ (731,031.20)