CR 193 - GROVE CIRCLE AND BELCHER AREA SANITARY SEWER SYSTEMS - 13-0049-UT - ADMINISTRATIVE CHANGE ORDERAdministrative Change Order 1 & Final
PROJECT:
CR 193, Grove Circle and Belcher Area
Sanitary Sewer Systems
CONTRACTOR:
Dallas 1 Construction and Development
10328 Main Street
Date:
PROJECT NUMBER:
PO REFERENCE:
AWARD DATE:
CONTRACT DATE:
August 31, 2016
13- 0049 -UT
ST111763
May 21, 2015
June 4, 2015
Thonotosassa, Fl 33592 CODE: 0315- 96630 - 563800 -535- 000 -0000
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
Decreases unused bid items - see attached.
STATEMENT OF CONTRACT AMOUNT
ORIGINAL CONTRACT AMOUNT
Admin Change Order 1 &Final - CM
NEW CONTRACT AMOUNT
APPROVED AS
ACCEPTED BY:
$ 3,048,809.50
$ (731,031.20) By.
$ 2,317,778.30 Bart Azzarelli, J
Poole & Kent Co ofFlorida
Matthew Smit
ATTEST:
Rosemarie Call,
Assistant City Attorney
Date: S-31-14,
CEO, AFC'
esses:
Date:
ecommended By: City of Clearwater
CITY OF CLEARWATER, IN
PINELLAS COUNTY, FLORIDA
4 a
William B. Horne, II,
z�r
City Manager
Michael D. Quillen, P
Project Manager
City Engineer
Page 2 of 3: Administrative Change Order 1 &Final CR193, Grove Circle and Belcher Area Sanitary
Sewer Systems (13- 0019 -UT)
ITEM DESCRIPTION UNIT OTY UNIT COST TOTAL COST
Decreases:
4 Furnish and Install 8" PVC SDR -26 Gravity LF 262 $ 200.00 $ (52,400.00)
Sewer Pipe
5 Furnish and Install 8" Ductile Iron Gravity LF 20 $ 130.00 $ (2,600.00)
Sewer Pipe
6 Remove Existing Vitrified Clay Pipe (VCP) LF 212 $ 2.30 $ (487.60)
Pipe
7 Furnish and Install Relocated Water Main - 4" LF 100 $ 140.00 $ (14,000.00)
DIP
8 Furnish and Install Relocated Water Main - 6" LF 91 $ 140.00 $ (12,740.00)
DIP
9 Furnish and Install Ductile Iron Fittings TON 1.5 $ 9,560.00 $ (14,340.00)
10 Replace Water Service Lateral Pipe EA 25 $ 300.00 $ (7,500.00)
11 4" MJ RWGV EA 4 $ 850.00 $ (3,400.00)
12 6" MJ RWGV EA 4 $ 1,030.00 $ (4,120.00)
13 Furnish and Install 4" Line Stop EA 4 $ 2,790.00 $ (11,160.00)
14 Furnish and Install 6" Line Stop EA 4 $ 3,290.00 $ (13,160.00)
20 Furnish and Install Sewer Street Lateral and EA 2 $ 1,880.00 $ (3,760.00)
Cleanout
21 Furnish and Install Sewer Service Lateral EA 14 $ 4,630.00 $ (64,820.00)
22 Abandon Existing Septic Tank EA 3 $ 770.00 $ (2,310.00)
24 Furnish and Install Flowable Fill CYD 37 $ 140.00 $ (5,180.00)
25 Export Unsuitable Materials CYD 2980 $ 11.00 $ (32,780.00)
26 Import of Select Fill Material CYD 4050 $ 23.00 $ (93,150.00)
28 Mill and Resurface Asphalt (Phase 2 Restoratic SY 433 $ 11.00 $ (4,763.00)
31 As- Requested Concrete Curb and Gutter LF 100 $ 36.00 $ (3,600.00)
Replacement
32 Private Property Root Pruning LF 2,957 $ 9.70 $ (28,682.90)
33 Public Right -of -Way Root Pruning LF 1,818 $ 8.80 $ (15,998.40)
34 Private Property Tree Removal Trunk EA 13 $ 320.00 $ (4,160.00)
Diameter 4 -inch to 12 -inch
35 Private Property Tree Removal Trunk EA 8 $ 2,080.00 $ (16,640.00)
Diameter 13 -inch to 24 -inch
37 Private Property Tree Removal Trunk EA 1 $ 5,800.00 $ (5,800.00)
Diameter 37 -inch to 48 -inch
38 Private Property Tree Removal Trunk EA 1 $ 7,400.00 $ (7,400.00)
Diameter 49 -inch or Greater
39 Right -of -Way Tree Removal Trunk Diameter EA 10 $ 200.00 $ (2,000.00)
4 -inch to 12 -inch
40 Right -of -Way Tree Removal Trunk Diameter EA 9 $ 1,700.00 $ (15,300.00)
13 -inch to 24 -inch
41 Right -of -Way Tree Removal Trunk Diameter EA 5 $ 3,200.00 $ (16,000.00)
25 -inch to 36 -inch
42 Right -of -Way Tree Removal Trunk Diameter EA 5 $ 4,975.00 $ (24,875.00)
37 -inch to 48 -inch
43 Right -of -Way Tree Removal Trunk Diameter EA 2 $ 6,600.00 $ (13,200.00)
49 -inch or Greater
44 Pinellas County Sewer Lateral Connection LS 1 $ 7,500.00 $ (7,500.00)
Building Permit Fee Allowance
Page 2 of 3: Administrative Change Order 1 &Final- CR193, Grove Circle
and Belcher Area Sanitary Sewer Systems (13- 0019 -UT)
ITEM DESCRIPTION UNIT QTY
45 Sewer 10% Contingency LS 1 $
46 Stormwater System 10% Contingency LS 1 $
Increases:
3 Furnish and Install 8" PVC SDR -35 Gravity LF
Sewer Pipe
36 Private Property Tree Removal Trunk EA
Diameter 25 -inch to 36 -inch
Additions:
47 Sewer Conflict and Piezometer Installation
48 Regrade Swale
49 Pleasant Parkway Asphalt Elevations
50 Mill and Resurface Bell Drive
51 Gravel Installation at Bell Drive
EA
EA
LS
SY
SY
UNIT COST TOTAL COST
276,484.50 $ (276,484.50)
680.00 $ (680.00)
Total (Decreases): $ (780,991.40)
21 $ 120.00 $
3 $ 3,600.00
Total Increases: $
1 $ 3,449.70 $
1 $ 3,565.50 $
1 $ 20,535.00 $
539 $ 11.00 $
109 $ 29.00 $
Total Additions: $
2,520.00
$10,800.00
13,320.00
3,449.70
3,565.50
20,535.00
5,929.00
3,161.00
36,640.20
Total Net (Decreases)/Increases /Additions: $
(731,031.20)