BUDGETARY QUOTE FOR A TOTAL CONTAINMENT TRAPAction Target Inc. Box 636, Provo, UT 84603 -0636 801 - 377 -8033 FAX: 801 - 377 -8096
Clearwater Police Department
Clearwater, FL 33756 -5520
Quotation: 94641 By: Jeremy Hebdon Printed: 2016 - Jul -21
Included Items:
1 77'8" long Total Containment Trap (TCT) System to include: 356,000.00
-TCT 4D and 4/4 design -- Rated for Rifle use
- All ballistic Plates, Joint Strips, Chambers
-Legs, Supports and hardware under trap (concrete pad provided by others)
- Roof and Boom System
-Screw Conveyor Lead Collection System
-Full Factory Installation
- Shipping
1 Reinstallation of DTAPS Targetry Package to include: , .. . , , , , 17,000.00
-New wiring and air lines for 16 targets
-New Protective Raceway behind the keewall for air lines and wires
- Installation materials
-Full Factory Installation
- Shipping
ADDITIONAL NOTES:
- We will use the existing Air Compressor, Laptop Computer and SmartRange
Control Software, Air Command ULTRA hand held wireless remote, and Target
Control Module (TCM).
-Owner or Contractor responsible for the removal of the existing system. ATI will
reuse the existing 16 targets.
- Target system must be shipped and reinstalled at the same time as the bullet trap.
Price will go up if it is done at a separate time.
Quotation 94641
Page 2
1 Refrigerated Air Dryer and After Cooler Package 3,500.00
- Highly recommended with all turning target systems in the southeastern states.
- Connects to the air compressor and helps significantly lessen the amount of
moisture in the airlines that goes down range to the targetry.
- Helps prolong the functionality and life cycle of the target system and parts within
the targetry.
- Full Factory Installation
- Shipping
NOTE:
This will be connected to your existing air compressor.
-Must be shipped and installed at the same time as the Target System and Bullet Trap
for this price.
1 Dual Track Runner V2 System 13,000.00
- 70' long
- Motors, Rails, Legs, Trolleys
- Handheld controller w/ 15' harness and 100' harness
-Full Factory Installation
- Shipping
NOTE:
- Must be shipped and installed with the bullet trap and turning target system for
this price
1 Ceiling Baffle Package 27,000.00
-(1) row of 4' ceiling baffles that are 3/8" AR500 steel
- Ceiling Deflector in front of baffle row
-Full Factory Installation
- Shipping
NOTES:
-This package was added after design changed. Before the concrete baffle stopped
before the bullet trap and was low enough that no bullets could escape through
the space. Now the concrete baffle is over the trap and there is a gap where bullets
could escape.
-Must be shipped and installed at the same time as the bullet trap for this price.
Total 416,500,00
Payment Terms:
Schedule of Values
Quotation 94641
Page 3
Shipping Terms:
Delivered
Installation Terms:
Full Factory Installation
Terms and Conditions:
You must reference the Order Number above on your purchase order to secure best price. Price will be
honored for 60 days from the quotation date if no other date is specified herein. Action Target reserves
the right to adjust installation costs based upon the actual site conditions encountered. Unless explicitly
itemized, price does not include taxes, bonds, fees, assessments, licenses, mandatory wage requirements or
other regulatory costs which may be applicable to the job site.
Comments:
This is a Budgetary Quote for a Total Containment Trap (TCT) and additional targets for Clearwater Police
Department's outdoor range. This will be for the left side of the range (as you are looking down range
towards the bullet trap). This is based on the TCT being 77'8" wide, and rated for Rifle use.
Exemptions -- Owner or Contractor to provide the following:
1) Equipment off - loading of ATI materials upon delivery at job -site, and placement near the installation
area.
2) All dirt work (grading, leveling, drainage, etc).
3) All concrete slabs, footings or walls.
4) All electrical outlets, conduit, junction boxes or disconnects.
5) All buried conduit with pull strings (per Action Target plans)
6) A protective railroad tie kneewall in front of the turning target system per Action Target plans.
7) Control Room(s) for targetry controls and air compressor. Must be in direct line of site of targetry.
8) Any light fixtures and lighting, if needed.
9) Any covered areas, baffles or structures where shooters are shooting from.
10) Engineered or Stamped drawings.
11) Building permits, special licenses, additional saftey regulations or insurance requirements, bonds, or
any other special fees we are not aware of at this time.
12) Removal and disposal of any existing equipment.
13) Dumpster /Disposal costs. Dumpster provided by others.
Owner and Contractor MUST provide forklift and scissor lift access to the ranges for the entire time of the
installation of the shooting range equipment. Price will go up for longer install time if ATI installers can
not use a forklift or scissor lifts.
Items above must be provided prior to arrival of ATI installer(s) to avoid any delays in the installation and
any re- mobilization fees.
A complete review of scope and contracts needs to occur prior to accepting any order to make sure all items
Quotation 94641
Page 4
are fully understood and covered.
NOTE: Only Action Target standard products are quoted. Any customization will be an additional cost.
This (Proposal/Submittal /Document) and all drawings, specifications and other design documents contain
proprietary information and is submitted for evaluation purposes, and shall not be disclosed, duplicated
or reproduced, in whole or in part, without prior written consent of an authorized representative of Action
Target Inc.
Proposal price is based on Action Target's Full Install Terms and Conditions (See See Action Target's Terms
and Conditions).
Countersigned:
(\ Crt%1
George N. Cretekos
Mayor
City of Clearwater, Florida
William B. Home II
City Manager
Approved as to form:
at ew M. Smit
Assistant City A :rney
Attest:
)tt.d.thtilik; at.4
Rosemarie Call
City Clerk
Action Target Inc.
Sh ':ne Gibbons
Action Target -- Chief Financial Officer (CFO)