Loading...
BUDGETARY QUOTE FOR A TOTAL CONTAINMENT TRAPAction Target Inc. Box 636, Provo, UT 84603 -0636 801 - 377 -8033 FAX: 801 - 377 -8096 Clearwater Police Department Clearwater, FL 33756 -5520 Quotation: 94641 By: Jeremy Hebdon Printed: 2016 - Jul -21 Included Items: 1 77'8" long Total Containment Trap (TCT) System to include: 356,000.00 -TCT 4D and 4/4 design -- Rated for Rifle use - All ballistic Plates, Joint Strips, Chambers -Legs, Supports and hardware under trap (concrete pad provided by others) - Roof and Boom System -Screw Conveyor Lead Collection System -Full Factory Installation - Shipping 1 Reinstallation of DTAPS Targetry Package to include: , .. . , , , , 17,000.00 -New wiring and air lines for 16 targets -New Protective Raceway behind the keewall for air lines and wires - Installation materials -Full Factory Installation - Shipping ADDITIONAL NOTES: - We will use the existing Air Compressor, Laptop Computer and SmartRange Control Software, Air Command ULTRA hand held wireless remote, and Target Control Module (TCM). -Owner or Contractor responsible for the removal of the existing system. ATI will reuse the existing 16 targets. - Target system must be shipped and reinstalled at the same time as the bullet trap. Price will go up if it is done at a separate time. Quotation 94641 Page 2 1 Refrigerated Air Dryer and After Cooler Package 3,500.00 - Highly recommended with all turning target systems in the southeastern states. - Connects to the air compressor and helps significantly lessen the amount of moisture in the airlines that goes down range to the targetry. - Helps prolong the functionality and life cycle of the target system and parts within the targetry. - Full Factory Installation - Shipping NOTE: This will be connected to your existing air compressor. -Must be shipped and installed at the same time as the Target System and Bullet Trap for this price. 1 Dual Track Runner V2 System 13,000.00 - 70' long - Motors, Rails, Legs, Trolleys - Handheld controller w/ 15' harness and 100' harness -Full Factory Installation - Shipping NOTE: - Must be shipped and installed with the bullet trap and turning target system for this price 1 Ceiling Baffle Package 27,000.00 -(1) row of 4' ceiling baffles that are 3/8" AR500 steel - Ceiling Deflector in front of baffle row -Full Factory Installation - Shipping NOTES: -This package was added after design changed. Before the concrete baffle stopped before the bullet trap and was low enough that no bullets could escape through the space. Now the concrete baffle is over the trap and there is a gap where bullets could escape. -Must be shipped and installed at the same time as the bullet trap for this price. Total 416,500,00 Payment Terms: Schedule of Values Quotation 94641 Page 3 Shipping Terms: Delivered Installation Terms: Full Factory Installation Terms and Conditions: You must reference the Order Number above on your purchase order to secure best price. Price will be honored for 60 days from the quotation date if no other date is specified herein. Action Target reserves the right to adjust installation costs based upon the actual site conditions encountered. Unless explicitly itemized, price does not include taxes, bonds, fees, assessments, licenses, mandatory wage requirements or other regulatory costs which may be applicable to the job site. Comments: This is a Budgetary Quote for a Total Containment Trap (TCT) and additional targets for Clearwater Police Department's outdoor range. This will be for the left side of the range (as you are looking down range towards the bullet trap). This is based on the TCT being 77'8" wide, and rated for Rifle use. Exemptions -- Owner or Contractor to provide the following: 1) Equipment off - loading of ATI materials upon delivery at job -site, and placement near the installation area. 2) All dirt work (grading, leveling, drainage, etc). 3) All concrete slabs, footings or walls. 4) All electrical outlets, conduit, junction boxes or disconnects. 5) All buried conduit with pull strings (per Action Target plans) 6) A protective railroad tie kneewall in front of the turning target system per Action Target plans. 7) Control Room(s) for targetry controls and air compressor. Must be in direct line of site of targetry. 8) Any light fixtures and lighting, if needed. 9) Any covered areas, baffles or structures where shooters are shooting from. 10) Engineered or Stamped drawings. 11) Building permits, special licenses, additional saftey regulations or insurance requirements, bonds, or any other special fees we are not aware of at this time. 12) Removal and disposal of any existing equipment. 13) Dumpster /Disposal costs. Dumpster provided by others. Owner and Contractor MUST provide forklift and scissor lift access to the ranges for the entire time of the installation of the shooting range equipment. Price will go up for longer install time if ATI installers can not use a forklift or scissor lifts. Items above must be provided prior to arrival of ATI installer(s) to avoid any delays in the installation and any re- mobilization fees. A complete review of scope and contracts needs to occur prior to accepting any order to make sure all items Quotation 94641 Page 4 are fully understood and covered. NOTE: Only Action Target standard products are quoted. Any customization will be an additional cost. This (Proposal/Submittal /Document) and all drawings, specifications and other design documents contain proprietary information and is submitted for evaluation purposes, and shall not be disclosed, duplicated or reproduced, in whole or in part, without prior written consent of an authorized representative of Action Target Inc. Proposal price is based on Action Target's Full Install Terms and Conditions (See See Action Target's Terms and Conditions). Countersigned: (\ Crt%1 George N. Cretekos Mayor City of Clearwater, Florida William B. Home II City Manager Approved as to form: at ew M. Smit Assistant City A :rney Attest: )tt.d.thtilik; at.4 Rosemarie Call City Clerk Action Target Inc. Sh ':ne Gibbons Action Target -- Chief Financial Officer (CFO)