Loading...
RESTROOM - PRESS BOX BUILDING AT EDDIE C MOORE FIELDS 8 & 9 - 06-0028-PR-A - ADMINISTRATIVE CHANGE ORDER #1 & FINALPage 1 of 3 Administrative Change Order 1 & Final BR[G14 I AM) BI,AI:I II UL • BAY I( BC.ACI I Date: April 30, 2016 PROJECT PROJECT NUMBER: Restroom/Press Box Building @ Eddie C. Moore Fields 8 & 9. PO REFERENCE NO.: CONTRACTOR: Certus Builders 304 Westland Avenue Tampa, FL 33606 DATE OF CONTRACT: 06- 0028 -PR -A ST112152 September 10, 2015 CODE: 0315 - 93651 - 563500 -575- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases and adds items according to field conditions -see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT $ 598,210.00 Administrative Change Order 1 CM - ($92,843.91) NEW CONTRACT AMOUNT $ 505,366.09 APPROVED AS TO FO : Matthew Smith, Attest: Rosemarie Call Assistant City Attorney CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II ACCEPTED BY: Certus Builders By: Dean Sumner Date: Witnesses: (two) ecommended By: City of Clearwater Project Manager City Manager Kevin Dunbar Parks & Recreation Director Page 2 of 3 Administrative Change Order 1 & Final: Restroom/Press Box Building @ Eddie C. Moore Fields 8 & 9. f7 ANC) /WMrJ)IIJL BAY B) BrAct) ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Decreases: $0.00 Total (Decreases): $0.00 Additions: City of Clearwater After Hours 1 Inspection Fees LS 2 $ 106.00 $212.00 Subcontractor Overtime - #1 Cooling 2 & Heating LLC LS 30 $ 42.00 $1,260.00 Subcontractor Overtime - Painters on 3 Demand, LLC LS 31 $ 17.50 $542.50 4 Subcontractors Overtime - Rising Force LS 1 $ 1,500.00 $1,500.00 5 Trim -Tek LLC - 36" sweeps LS 6 23 1/3 $140.00 Axiom Power - Order, pick up and install new special order 15 amp fuses for elevator disconnect per Schindler 5 request LS 2 $ 90.00 $180.00 6 Axiom Power - 15 Amp Fuses LS 3 $ 17.65 $52.95 Axiom Power - Fuses reducer. Needed to install 15 amp fuses into 60 amp 7 disconnect LS 3 $ 28.25 $84.75 General Conditions - Only Applied to 5 Overtime Charges (10 %). LS 0.1885 $ 376.03 $70.88 Profit 5% - Only Applied to Overtime 6 Charges (5 %). LS 0.1885 $ 188.04 $35.45 Install sata Boxes from existing data location. Installed a chase nipple 7 between the two boxes. LS 1 $ 98.00 $98.00 Installed conduit with wire from H 8 panel to water heater location. LS 1 $534.75 $534.75 Installed wire for new circuit existing conduit for new fire alarm bell power 9 supply. LS 1 $447.20 $447.20 Install additional 2" pvc conduit under 10 2nd floor for projection tie in. LS 1 $1,179.10 $1,179.10 11 Install conduit from 120 volt elevator cab light box to switch on wall with lockable cover. Pull wire and installed switch. Remove previously requested SO cord for cab light and installed 1/2" metal flexible conduit. LS 1 $337.45 $337.45 Total Net (Decreases)/Increases /Additions: $6,675.03 Pages 3 of 3 Decrease for ODP's: T -3 Construction - Concrete & 4 Masonry. L5 -1 $17,810.00 ($17,810.00) Probuild - Rough Carpentry Materials. 6 L5 -1 $5,013.44 ($5,013.44) 7 Angle Truss - Trusses. L5 -1 $7,950.00 ($7,950.00) 12 Pinnacle Door - Doors & Hardware L5 -1 $25,359.71 ($25,359.71) 13 Largo Glass - Windows L5 -1 $8,200.00 ($8,200.00) 19 Mardale Specialties - Accessories. L5 -1 $ 12,618.87 ($12,618.87) 22 Ferguson - Plumbing L5 -1 $14,566.92 ($14,566.92) 24 Axiom Power - Electrical L5 -1 $8,000.00 ($8,000.00) Total (Decreases): ($99,518.94)