Loading...
MISSION HILLS RAW WATER MAIN - 14-0038-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINAL• Administrative Change Order 1 & Final Date: April 12, 2016 PROJECT Mission Hills Raw Water Main CONTRACTOR: Castco Construction, Inc, 9001 126th Ave N Largo, F133773 PROJECT NUMBER: PO REFERENCE NO.: DATE COUNCIL APPROVED: DATE OF CONTRACT: 14- 0038 -UT ST112073 September 17, 2015 October 30, 2015 CODE: 0327 - 96741 - 563800 -533- 000 - 0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT decreasing and increasing items according to field conditions -see details attached. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Admin Change Order 1 - CM - NEW CONTRACT AMOUNT APPROVED S TO F Matthe mith, Attest: Rosemarie Call o Pr: 9 Date: ,J d Si -9494" $ 281,195.92 ($36,668.90) $244,527.02 Assistant City Attorney CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA ACCEPTED BY: Castco Construction Inc. B: Israel Castro, (Sta.') t9 President k Date: () r,1 1 1( 2,O1 ? L Witnesses: (two) (.12t4-44, & .. J. Recommended By: City of Clearwater Khan guyenl.)6‘."' Project Manager A. r William B. Horne, II City Manager Michael Quillen, City Engineer A) Page 2 of 2 Administrative Change Order 1 & Final: Mission Hills Raw Water Main ITEM DESCRIPTION UNIT Qty UNIT COST TOTAL COST Decreases: 4 F &I 8" HDPE Pipe by Horizontal LF 84 $ 59.88 ($5,029.92) Directional Drill 6 F &I 8" DI Pipe by Open Cut LF 50 $ 85.58 ($4,279.00) 7 F &I 8" HDPE Pipe by Open Cut LF 50 $ 100.06 ($5,003.00) 10 F &I 8 -inch Restrained Joints for DI Pipe EA 6 $ 190.11 ($1,140.66) 13 Root Pruning LF 83 $ 7.43 ($616.69) 17 Concrete Driveway Restoration as Directed SY 29.67 $ 62.77 ($1,862.39) by the Owner or the Owner's Authorized Project Representative 18 Concrete Sidewalk Restoration as Directed SY 46.89 $ 57.74 ($2,707.43) by the Owner or the Owner's Authorized Project Representative 19 Concrete Curb Restoration as Directed by LF 25 $ 45.16 ($1,129.00) the Owner or the Owner's Authorized Project Representative 20 Underdrain Restoration as Directed by the LF 50 $ 48.98 ($2,449.00) Owner or the Owner's Authorized Project Representative 22 Unsuitable Material Excavation Below CY 100 $ 14.69 ($1,469.00) Grade as Directed by the Owner or the Owner's Authorized Project Representative 23 Select Backfill Below Grade as Directed by CY 100 $ 14.69 ($1,469.00) the Owner or the Owner's Authorized Project Representative 24 Asphalt Overlay as Directed by the Owner SY 48.67 $ 18.37 ($894.07) or the Owner's Authorized Project Representative 25 Contingency LS 1 $ 25,563.27 ($25,563.27) Total (Decreases): ($53,612.42) Increases: 3 F &I 8" PVC Pipe by Horizontal Directional LF 2.00 129.210 258.42 5 F &I 8" PVC Pipe by Open Cut LF 100.00 53.010 5301 9 F &I 8 -inch Restrained Joints for PVC or HE EA 19.00 200.670 3812.73 11 F &I Compact DI Fittings LB 228 $ 9.17 2090.76 16 Sod Restoration as Directed by the Owner SY 433.3301887 $ 9.54 4133.97 or the Owner's Authorized Project Representative 21 Asphalt Paving Restoration as Directed by SY 24.44 $ 55.10 $1,346.64 the Owner or the Owner's Authorized Project Representative Total Increases: $16,943.52 Total Net (Decreases) /Increases: ($36,668.90)