Loading...
2013-14 SANITARY SEWER AND MANHOLE REHABILITATION - SANITARY SEWER CIPP REHABILITATION - 14-0025-UT - CHANGE ORDER #1• CHANGE ORDER 1 DATE: PROJECT: PROJECT NUMBER: 2013 -14 Sanitary Sewer & Manhole - Sanitary Sewer CIPP Rehabilitation PO REFERENCE: CONTRACTOR: COUNCIL AWARD: Hinterland Group, Inc. 5401 N Haverhill Road, Unit 6 114 DATE OF CONTRACT: West Palm Beach, Fl 33407 March 14, 2016 14- 0025 -UT ST111382 February 5, 2015 February 27, 2015 CODE: 0315- 96665 - 563800 -535- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT to increase funding with all unit prices, terms and conditions remaining the same -see attached for details. ,,, w . p` STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: Hinterland Group, Inc. ORIGINAL CONTRACT AMOUNT Change Order 1 - City Council - 4/7/2016 NEW CONTRACT AMOUNT APPRO D A 0 FORM: Matth -w Smith • $ 360,000.00 $ 360,000.00 $ 720,000.00 Assistant City Attorney George N Cretekos, ATTEST: flit i LQ.t lx 04,1-(_ Mayor CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA W II,� William B. Horne, II City Manager B Daniel uke, Date: (, lal) resiltent Witnesses (2): Recommended By: City of Clearwater Lan -Anh Nguyen, PE, Project Manager f�. chael D Quillen, PE, City Engineer A • Page 2 of 3 RE: Change Order 1 - 2013 -14 -10 Sanitary Sewer and Manhole Rehabilitation Cured in Place Pipe Lining ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL COST Increases: 1.0 CIPP a 8" Dia. Sanitary Sewer Mains 6.0 mm LF 4000 $ 25.00 $ 100,000.00 Normal Thickness b 10" Dia. Sanitary Sewer Mains 7 5 LF 2500 $ 30.00 $ 75,000.00 mm Normal Thickness c 12" Dia. Sanitary Sewer Mains 7 5 LF 1000 $ 35.00 $ 35,000.00 mm Normal Thickness d 15" Dia. Sanitary Sewer Mains 7.5 LF 300 $ 40.00 $ 12,000.00 mm Normal Thickness e 18" Dia. Sanitary Sewer Mains 9 0 LF 100 $ 51.00 $ 5,100.00 mm Normal Thickness f 21" Dia. Sanitary Sewer Mains9 0 mm LF 100 $ 56.00 $ 5,600.00 Normal Thickness g 24" Dia. Sanitary Sewer Mains9.0 mm LF 100 $ 66.00 $ 6,600.00 Normal Thickness 2.0 CIPP Sectional Repair a 6" Dia. Sanitary Sewer Mains 2' -10' EA 1 $ 1,000.00 $ 1,000.00 10.1' -20' EA 1 $ 1,600.00 $ 1,600.00 20.1' -30' EA 1 $ 2,200.00 $ 2,200.00 b 8" Dia. Sanitary Sewer Mains 2' -10' EA 1 $ 1,100.00 $ 1,100.00 10.1' -20' EA 1 $ 1,700.00 $ 1,700.00 20.1' -30' EA 1 $ 2,200.00 $ 2,200.00 c 10" Dia. Sanitary Sewer Mains 2' -10' EA 1 $ 1,200.00 $ 1,200.00 10.1' -20' EA 1 $ 1,800.00 $ 1,800.00 20.1' -30' EA 1 $ 2,300.00 $ 2,300.00 d 12" Dia. Sanitary Sewer Mains 2' -10' EA. 1 $ 1,300.00 $ 1,300.00 10.1' -20' EA. 1 $ 1,900.00 $ 1,900.00 20.1' -30' EA. 1 $ 2,400.00 $ 2,400.00 e 15" Dia. Sanitary Sewer Mains 2' -10' EA. 1 $ 1,400.00 $ 1,400.00 10.1' -20' EA. 1 $ 2,400.00 $ 2,400.00 20.1' -30' EA. 1 $ 3,100.00 $ 3,100.00 f 18" Dia. Sanitary Sewer Mains 2' -10' EA. 1 $ 1,500.00 $ 1,500.00 10.1' -20' EA. 1 $ 2,700.00 $ 2,700.00 20.1' -30' EA. 1 $ 3,500.00 $ 3,500.00 g 21" Dia. Sanitary Sewer Mains 2' -10' EA. 1 $ 1,600.00 $ 2,800.00 10.1' -20' EA. 1 $ 2,800.00 $ 3,500.00 20.1' -30' EA. 1 $ 3,500.00 $ 3,500.00 h 24" Dia. Sanitary Sewer Mains 2' -10' EA. 1 $ 1,600.00 $ 1,600.00 10.1' -20' EA. 1 $ 2,900.00 $ 2,900.00 20.1' -30' EA. 1 $ 4,000.00 $ 4,000.00 3. Ancillary Services a. Mobilization/Demobilization LS 5 $ 1,500.00 $ 7,500.000 including Traffic Control b. Easement Access, additional < or = 15" Diameter LF 2500 $ 1.50 $ 3,750.000 > 15" Diameter LF 900 $ 2.50 $ 2,250.000 • Page3of3 RE: Change Order 1 - 2013 -14 -10 Sanitary Sewer and Manhole Rehabilitation Cured in Place Pipe Lining ITEM DESCRIPTION c. Service with Pressure Grouting d. Standard Service Reconnection e. Heavy Cleaning 8 " -10" Diameter 12 " -15" Diameter 16 " -24" Diameter f. Root Removal 8 " -10" Diameter 12 " -15" Diameter 16 " -24" Diameter g. Tuberculation Cleaning 8 " -10" Diameter 12 " -15" Diameter 16 " -24" Diameter h. Bypass Pump setup with Piping 8 " -12" Diameter 15 " -18" Diameter 24" Diameter UNIT QTY UNIT COST TOTAL COST EA 65 $ 230.00 $ 14,950.000 EA 90 $ 95.00 $ 8,550.000 $ LF 600 $ 2.00 $ 1,200.000 LF 300 $ 3.00 $ 900.000 LF 400 $ 4.00 $ 1,600.000 $ LF 500 $ 8.00 $ 4,000.000 LF 300 $ 8.00 $ 2,400.000 LF 300 $ 8.00 $ 2,400.000 $ LF 470 $ 10.00 $ 4,700.000 LF 100 $ 10.00 $ 1,000.000 LF 100 $ 15.00 $ 1,500.000 $ EA 10 $ 400.00 $ 4,000.000 EA 3 $ 800.00 $ 2,400.000 EA 2 $ 2,000.00 $ 4,000.000 Total Increases: $ 360,000.000