Loading...
94-32BRESOLUTION NO. 94-32 (B) A RESOLUTION OF THE CITY OF CLEARWATER, FLORIDA, AUTHORIZING THE EXECUTION OF A JOINT PROJECT AGREEMENT BETWEEN THE CITY OF CLEARWATER AND THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE RELOCATION AND /OR INSTALLATION OF NATURAL GAS MAINS DURING THE STATE ROAD 52 WIDENING PROJECT, AND AUTHORIZING THE PLACING OF FUNDS WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FOR THE COMPLETION OF THE UTILITY INSTALLATION; PROVIDING AN EFFECTIVE DATE. WHEREAS, the State of Florida Department of Transportation (Department) is widening State Road 52 between Hicks and Moon Lake, which calls for the relocation or installation of new City gas facilities over and /or under said highway; and WHEREAS, the City requires additional gas capacity in certain locations within the construction limits of this project; and WHEREAS, the City authorized the preparation of plans and specifications for such work, and the plans and specifications have been prepared and approved by the Clearwater Gas System; and WHEREAS, an agreement to provide for such work in conjunction with the road reconstruction work has been prepared, and a copy of the agreement is attached hereto; now, therefore, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF CLEARWATER, FLORIDA: Section 1. The Joint Project Agreement between the City and the Department for relocation and /or installation of city natural gas mains designated as Utility Job 6524, Section 14120, Parcel 1, R/W Job N /A, a copy of which is attached hereto as Exhibit A, is hereby approved and authorized for execution by the city officials. Section 2. The City shall assume all costs incurred for such work, which costs are estimated to be $268,431.81. The estimated costs of such work shall be paid in advance to the State of Florida Department of Transportation in accordance with the Joint Project Agreement. Section 3. This resolution shall take effect immediately upon adoption. PASSED AND ADOPTED this 2nd day of May, , 1994. Attest: cyhf' is E. Goudeau City clerk Rita Garvey mayor - commisdidn 710 - 010 -84 Form: OGC - 0009 (5/92) (5/92) STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION JOINT PROJECT AGREEMENT UTILITY INSTALLATION BY HIGHWAY CONTRACTOR (Private Utility) WPI# PROJECT# 7113952 14120 -3524 STATE RD. COUNTX PARCEL I FAP# 52 PASCO 1 N/A THIS AGREEMENT, made and entered into this day of , 19 , by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the DEPARTMENT, and Clearwater Gas System , a corporation organized and existing under the laws of Florida, with its principal place of business in the City of Clearwater, County of Pinellas, State of Florida, hereinafter called the COMPANY. WITNESSETH: WHEREAS, the DEPARTMENT is constructing, reconstructing or otherwise changing a portion of the State Highway System designated by the DEPARTMENT as State Project No. 14120 -3521, Road No. 52 between Hicks and Moon Lake which shall call for the adjustment, ' relocation and /or installation of COMPANY facilities along, over and /or under said highway; and WHEREAS, the plans for the said construction, reconstruction or other changes to be made, as above described, have been reviewed by the DEPARTMENT and the COMPANY, said above described utility relocation hereinafter designated as "Utility Work "; and WHEREAS, the term "Cost of Utility Work" shall include the entire amount paid by the COMPANY properly attributable to such work; and WHEREAS, the COMPANY has expressed its desire to assume all costs incurred by this "Utility Work" and has requested the DEPARTMENT to include in said Project certain plans and specifications to meet the COMPANY'S needs; and WHEREAS, the DEPARTMENT and the COMPANY have determined that it would be to the best interest of the general public and to the economic advantage of Goth parties to enter into a JOINT PROJECT AGREEMENT providing for such work; and Page 1 of 7 9Xt1ISIT A NOW, THEREFORE, in consideration of the mutual covenants hereinafter contained, it is agreed by the parties as follows: 1. The DEPARTMENT and the COMPANY shall participate in a JOINT PROJECT, the scope of which will cover only COMPANY utility facility within the limits of the project as included in the plans and estimate of the highway contract, more specifically described as 14120 -6525. The estimated cost of said project is $268,431.81 including allowances; and the method of payment is specified in Exhibit "A" attached hereto and made a part hereof. 2. The COMPANY will prepare, at its expense, the design and plans for all of the COMPANY'S necessary "Utility Work" specified above, and will furnish to the DEPARTMENT no later than March 15, 1994, complete original plans on standard size sheets (24" X 36 "), all suitable for reproduction by the DEPARTMENT, together with a complete set of specifications covering all construction requirements for the "Utility Work ". Final "Utility Work" plans shall be complete in every detail and will include a "Summary of Quantities" sheet. It will be the responsibility of the COMPANY to coordinate the development of the "Utility Work" plans with the DEPARTMENT'S highway plans. The DEPARTMENT, upon request by the COMPANY, will furnish all available highway information required by the COMPANY for the development of the "Utility Work" plans; and the DEPARTMENT shall cooperate fully with the COMPANY to this end. 3. All of the work on the JOINT PROJECT is to be done according to, the plans and specifications of the DEPARTMENT which plans and specifications are, by reference hereto, made a part hereof. The COMPANY will be responsible for verifying the accuracy of the DEPAR'TMENT'S underground survey information, and will also be responsible for any changes to the COMPANY'S plans made necessary by errors or omissions in the DEPARTMENT'S survey information as furnished to the COMPANY. All errors, omissions, or changes in the design of the COMPANY'S "Utility Work" will be the sole responsibility of the COMPANY. In any conflict between COMPANY and DEPARTMENT specifications, the DEPARTMENT'S specifications will govern. 4. The COMPANY, at its expense, will furnish all engineering inspection, testing and monitoring of the "Utility Work ", and will also furnish the DEPARTMENT'S engineer with progress reports for diary records, approved quantities and amounts for weekly, monthly and final estimates. All field survey control for the "Utility Work" will be furnished by the COMPANY under the supervision of the DEPARTMENT'S engineer. The coordination of the COMPANY'S "Utility Work" with that of the highway contractor and other utilities and /or their contractors will be the responsibility of the DEPARTMENT, and the COMPANY shall cooperate fully in this matter. 2 OF 7 --I tw-.3A �) RMA All information required for Changes or Supplemental Agreements pertaining to the COMPANY'S "Utility Work" shall be promptly furnished to the DEPARTMENT by the COMPANY upon the request of the Department. 5. The DEPARTMENT will provide the necessary engineering supervision to assure construction is in compliance with the plans and specifications hereinabove referred to, and shall receive all bids for and let all contracts for said "Utility Work" all at the sole expense of the COMPANY. All bids for said "Utility Work" shall be taken into consideration in the award of bid on the Highway Job and the COMPANY shall have the right to reject any and all bids on the "Utility Work" if said bids exceed the COMPANY'S estimated cost by more than ten percent (10 %) . In the event of rejection of bids for the "Utility Work ", the highway contract documents will be so amended prior to award and the COMPANY will, at its expense, arrange for the prompt construction of the "Utility Work ", and will cooperate with the DEPARTMENT'S contractor to schedule the sequence of their work so as not to unnecessarily delay the work of the DEPARTMENT'S contractor, defend any legal claims of the DEPARTMENT'S contractor due to delays caused by the permittee's failure to comply with their relocation schedule, and shall comply with all provision of the law and Rule 14 -46, Florida Administrative Code. The COMPANY shall not be responsible for delays beyond its normal control. 6. All adjustments, relocations, repairs and incidentals required to be performed to the existing COMPANY utilities within this project, not included in this contract, will be the sole responsibility of the COMPANY, and will be handled under a separate agreement and utility relocation schedule.- All such work is to be coordinated with the construction of this project and in a manner that will not cause delay to the highway contractor. 7. All services and work under the construction contract shall be performed to the satisfaction of the DISTRICT DIRECTOR OF OPERATIONS, and he shall decide all questions, difficulties and disputes of whatever nature, which may arise under or by reason of such contract for "Utility Work "; the prosecution and fulfillment of the services thereunder, and the character, quality, amount and value thereof; and his decision upon all claims, questions and disputes thereunder shall be final and conclusive upon the parties hereto. 3. The COMPANY agrees that it will, at least thirty (30) days prior to the DEPARTMENT'S advertising the project for bid, furnish the DEPARTMENT an advance deposit estimate of $268,431.81 for full payment of project cost for project 14120.6525 Said deposit estimate should be the total estimate project cost plus allowances (5 ;s Mobilization, 2 .1/2 i3aintenance of Traffic, J.Qe contingency..and.2° -4 CEA) 3 OF 7 If the accepted bid amount plus allowances is in excess of the deposit amount, the COMPANY will provide an additional deposit within fourteen ('14) calendar days or prior to posting the bid, whichever is earlier, so that the total deposit is equal to the bid amount plus allowances. The DEPARTMENT may utilize this deposit for payment of the project (14120 -6525 ). Both parties further agree that in the event final billing pursuant to the terms of this agreement is less than the advance deposit, a refund of an excess will be made by the DEPARTMENT to the COMPANY7 and that in the event said final billing is greater than the advance deposit, the COMPANY will pay the additional amount within 40 days from the date of the invoice. The payment of funds as required above will be made as follows (choose one): Directly to the DEPARTMENT for deposit into the State Transportation Trust Fund. x Deposit as provided in the attached Memorandum of Agreement (Exhibit A) between COMPANY, DEPARTMENT and the Florida Department of Insurance, Division of Treasury. 9. Upon completion and acceptance of the work, the COMPANY shall own, control, maintain, and be responsible for all COMPANY utility facilities involved, according to the terms of the utility permit. The COMPANY further agrees that it will maintain and keep in repair, or cause to be maintained and kept in repair, all of such constructed facilities or utilities within the right of way of said State Road, to comply with all provisions of law and of the DEPARTMENT's regulations pertaining thereto. 10. The COMPANY covenants and agrees that should the DEPARTMENT allow the COMPANY to place out of service rather than remove the utility facilities presently in existence, the COMPANY agrees that it will indemnify and hold harmless the DEPARTMENT and all of the DEPARTMENT'S officers, agents and employees from any claim, loss damage, costs, charge or expense which may arise as a result of the placing out of service the utility facilities including, but not limited to causes arising out of any future removal of the said utility facilities by the COMPANY or entity other than the COMPANY. The COMPANY also agrees to adhere to all applicable required Federal, state and local laws, regulations, or authorities. 11. The COMPANY covenants and agrees that it shall, to the extent permitted by law, defend, save and hold harmless the DEPARTMENT from any and all legal actions, claims or demands by any person or legal entity against the DEPARTMENT arising out of the participation in this Agreement by the COMPANY or use by the COMPANY of the completed "Utility Work ". 4 OF 7 IN y 12. Upon final payment to the contractor for the entire project, the DEPARTMENT shall, within one hundred eighty (180) days furnish the COMPANY with two (2) copies of its final and complete billing of all cost incurred in connection with the work performed hereunder, such statement to follow as closely as possible the order of the items contained in the job estimate. The final billing show the description and site of the project; the date on which the first work was performed or the date on which the earliest item of billed expense was incurred; the date on which the last work was performed or the last item of billed expense was incurred; and the location where the records and accounts billed can be audited. All cost records and accounts shall be subject to audit by a representative of the COMPANY within three (3) years after final billing by the DEPARTMENT to the COMPANY. In the event final cost is less than the advance payment, the DEPARTMENT will refund the balance to the COMPANY. If the final cost exceeds the advance payment the COMPANY will be invoiced for the balance. Upon receipt of the final invoice, the COMPANY agrees to reimburse the - DEPARTMENT in the amount of such actual cost within forty (40) days. The COMPANY shall pay an additional charge of to per month on any invoice not paid within the time specified in the preceding sentence until the invoice is paid. 13. The COMPANY shall pay the DEPARTMENT'S reasonable attorneys' fees and court costs if the DEPARTMENT prevails in litigation for the enforcement of the provisions of paragraphs 1, 8 and 12 of this Agreement. 14. This document incorporates and includes all prior negotiations, correspondence, conversations, agreements, or understandings applicable to the matters contained herein, and the parties agree that there are no commitments, agreements or understandings concerning the subject matter of this Agreement that are not contained in this document. Accordingly, it is agreed that no deviation from the terms hereof shall be predicated upon any prior representation or agreements whether oral or written. It is further agreed that no modification, amendment or alteration in the terms or conditions contained herein shall be effective unless contained in a written document executed with the same formality and of equal dignity herewith. 15. This Agreement shall be governed, interpreted and construed according to the laws of the State of Florida. 16. If any part of this Agreement shall be determined to be invalid or unenforceable by a court of competent jurisdiction, or by any other legally constituted body having the jurisdiction to make such determination, the remainder of this Agreement shall remain in full force and effect provided that the part of the Agreement thus invalidated or declared unenforceable is not material to the intended operation of this Agreement. 5 OF 7 M - 5,2, CG1) IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed by their duly authorized officers, and their officials seals hereto affixed, the day and year first above written. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION COMPANY OF FLORIDA BY: SEAL (Title: ATTEST: (Title• STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BY: (Title: SEAL ATTEST: (Title: ------------------------------ FOR DEPARTMENT USE ONLY Approved as to form and Legality STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BY: APPROVED BY: Attorney Dist. Utility Eng. 6 OF 7 Approval by Office of Comptroller STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION BY (Title: 7 OF 7 CITY SIGNATURE PAGE - Joint Project Agreement between the State of Florida Department of Transportation and the City of Clearwater - Project #14120 -3524 /3521 (State Road 52). Countersigned: M Rita Garvey Mayor - Commissioner Approved as to form and correctness: I. A. Galbraith, Jr. City Attorney CITY OF CLEARWATER, FLORIDA Elizabeth M. Deptula City Manager Attest: Cynthia E. Goudeau City Clerk r qV -3.2 (ay PAGE 1 OF 2 EXHIBIT "A" MEMORANDUM OF AGREEMENT THIS AGREEMENT, made and entered into this day of , 19 y, by and between the State of Florida, Department of Transportation, hereinafter referred to as "DOT" and the State of Florida, Department of Insurance, Division of Treasury, hereinafter referred to as "Treasury" and Clearwater Gas system hereinafter referred to as the "Participant ". WITNESSETH WHIEREAS, "DOT" is currently constructing the following project: State Project NO.: 14120 -3524 F.A.P. No. N/A W. P. 1. No. : 7113952 County Pasco hereinafter referred to as the "Project ". WHEREAS, DOT and the Participant entered into a .Point Participation Agreement dated 19 wherein DOT agreed to perform certain work on behalf of the ?articipant in conjunction with the Project. WHEREAS, the parties to this AGREE? ✓ENT mutually agreed that it would be in the best interest of the DOT and t_ ^_e - ar icipant if an escrow account were established to provide funds for the additional work performed on the Project on behalf of = articipant by DOT. NOW THEREFORE, in considerat_c1 of t_ ^. p-remises and the covenants contained herein the parties agree to ,.ne following: 1 An initial ti al deposit in -e amc—_,,nz of _ 268.,431.81 will be made by =.._ _ arti ci pant into an escrow account. Said escrcw account will .= crened by DOT on behalf of the Participant in the ..a of the _ '_cr_da Department of Trans crtation with the Depar —; ent of tie, Division 0 ireas• -, ry, Eureau of Collateral Sec:ri�ies u_cn receipt of this I�cmorandum of Agreemment. Much accoz :...t will be craned and shall be deemed an asset of DOT. 2. Other deposits will be made only by c:e Participant as ecessar•y to cover the ccst o= the Clearwater Gas systemcrit prior to t;,e exec.;tic'n of any Supp,amenta . Acres ~eats. -- PAGE 2 OF 2 3. All deposits shall be made payable to the Department of Insurance Revenue Processing and mailed to the DOT Office of Comptroller for appropriate processing at the following address: Florida Department of Transportation Office of Comptroller (M.S. 42) 605 Suwannee Street Tallahassee, Florida 32399 -0 450 ATTN: JPA Coordinator A copy of this Agreement shall accompany the deposits. a. The DOT's Comptroller and /or his designees shall be the. sole signatories on the escrow account with Department of Insurance and shall have sole authority to authorize withdrawals from said account. S. Unless instructed otherwise by the parties hereto, all interest accumulated in the escrow account shall remain in the account for the purposes of the project as defined in the JPA. 6. The Treasurer agrees to provide written confirmation of 'a receipt of funds to the DOT. 7. The Treasurer's Office further agrees to provide periodic reports to the DOT. STATE OF FI..ORIDA STATE OF FLORIDA DEPPRTMFNT OF TRANSPORTATION DEPARTMENT OF INSi :UU CE COMPTROLLER DIVISION Or TREASURY FTRTIC1?L ?QT ADDRESS- FE D 7- RA L TAX I . D. W- 3.). EXHIBIT A CITY SIGNATURE PAGE - Joint Project Agreement between the State of Florida Department of Transportation and the City of Clearwater - Project #14120- 3524/3521 (State Road 52). Countersigned: CITY OF CLEARWATER, FLORIDA By:t Rita Garvey ElizabetOY1. Deptula Mayor- Commissioner City Manager Approved as to form and Attest: correctness: Cynthia E. Goudeau City Attorney City Clerk PARTICIPANT ADDRESS: City of Clearwater/ Clearwater Gas System 400 N. Myrtle Avenue Clearwater, FL 34615 FEDERAL TAX I.D. 59- 6000289 0 3..-) t6