BERKLEY PLACE DRAINAGE IMPROVEMENTS - 14-0037-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: March 14, 2016
PROJECT PROJECT NUMBER:
Berkley Place Drainage Improvements
PO REFERENCE NO.:
CONTRACTOR: COUNCIL AWARD:
Steve's Excavating and Paving, Inc. DATE OF CONTRACT:
P.O. Box 303
Dunedin, Florida 34697
CODE A:
CODE B:
CODE C:
14- 0037 -EN
ST112142
October 1, 2015
October 15, 2015
0315 - 96173- 563700 -539- 000 -0000
0327- 96741- 563800 -533 -000 -0000
0327 - 96665 - 563800 -535 -000 -0000
SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT
This change order decreases, increases and adds items according to field conditions -see details attached.
STATEMENT OF CONTRACT AMOUNT ACCEPTED BY:
ORIGINAL CONTRACT AMOUNT
Administrative Change Order 1 - CM -
NEW CONTRACT AMOUNT
APPROVED A
Matthew Smith,
Attest:
Rosemarie Call
Date: 3
$ 393,114.04
($37,518.58)
$355,595.46
Assistan City Attorney
CITY OF CLEARWATER, in
PINELLAS COUNTY, FLORIDA
William B. Horne, II
City Manager
WiLI/(two)
Recommended By: City of Clearwater
Tara Kivett Construction Manager
lichael D. Quillen, PE,/ City Engineer
Page 2 of 2
Administrative Change Order 1 & Final: Berkley Place Drainage Improvements
ITEM DESCRIPTION UNIT tv UNIT COST TOTAL COST
Code A:
Decreases:
Removal & Replacement of unsuitable Material
104 (as needed) CY 115 $ 35.00
204 Valley Gutter Curb (City Index 101) LF 236 $ 17.00
209 Driveway Restoration (In Kind) SY 53.5 $ 70.00
210 Sodding LS 1 $ 11,870.00
401 15" RCP LF 24 $ 81.90
402 14" X 23" ERCP LF 3 $ 122.00
403 18" RCP LF 15 $ 114.00
411 Contingency LS 1 $ 30,501.14
Total (Decreases) for Code A:
Increases:
2" Asphaltic Concrete Structural Course Type S-
201 III TN 17.77 $ 138.00
203 12" Stabilized Subgrade (LBR 40) SY 301 $ 13.10
205 Straight Curb (City Index 101) LF 7 $ 45.00
206 Type 1 Curb (City Index 101) LF 33 $ 45.00
207 4" Concrete Sidewalk SF 60 $ 7.25
208 Pedestrain Ramp Detectable Warning EA 2 $ 1,765.00
404 24" RCP LF 163 $ 122.00
Total Increases for Code A:
($4,025.00)
($4.012.00)
($3,745.00)
($11,870.00)
($1.965.60)
($366.00)
($1,710.00)
($30,501.14)
($58,194.74)
$2,452.26
$3,943.10
$315.00
$1,485.00
$435.00
$3,530.00
$19,886.00
$32,046.36
Additions:
211 Adjust Manholes LS I $ 625.00 $625.00
212 Speed Tables LS 1 $ 4,830.00 $4,830.00
412 Underdrain LS I $ 4,593.75 $4,593.75
413 Conflict Between S9 and 10 LS 1 $ 2,732.00 $2,732.00
Total Additions for Code A: $12,780.75
Total Net (Decreases) /Increases /Additions Code A:
($13,367.63)
Code B:
Decreases:
501 6" DI WM (RJ) Vert. Offset Assembly LS 0.1161 $ 5,680.00
503 3/4" Service Connection (as needed) EA 4 $ 1,330.00
504 Relocate Existing 3/4" Meter (as needed) EA 2 $ 385.00
505 Contingency LS 1 $ 1,841.50
Total (Decreases) for Code B:
($659.45)
($5,320.00)
($770.00)
($1,841.50)
(S8,590.95)
Code C:
Decreases:
601 Sanitary Lateral Service Assembly
602 F & I Sanitary Cleanout (as needed)
604 Contingency
EA 2 $ 2,950.00
EA 7 $ 895.00
LS 1 $ 3,395.00
Total (Decreases) for Code B:
Total Net (Decreases) /Increases /Additions to the Contract:
($5,900.00)
($6,265.00)
($3,395.00)
($15.560.0())
($37,518.58)