Loading...
BERKLEY PLACE DRAINAGE IMPROVEMENTS - 14-0037-EN - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 & Final Date: March 14, 2016 PROJECT PROJECT NUMBER: Berkley Place Drainage Improvements PO REFERENCE NO.: CONTRACTOR: COUNCIL AWARD: Steve's Excavating and Paving, Inc. DATE OF CONTRACT: P.O. Box 303 Dunedin, Florida 34697 CODE A: CODE B: CODE C: 14- 0037 -EN ST112142 October 1, 2015 October 15, 2015 0315 - 96173- 563700 -539- 000 -0000 0327- 96741- 563800 -533 -000 -0000 0327 - 96665 - 563800 -535 -000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT This change order decreases, increases and adds items according to field conditions -see details attached. STATEMENT OF CONTRACT AMOUNT ACCEPTED BY: ORIGINAL CONTRACT AMOUNT Administrative Change Order 1 - CM - NEW CONTRACT AMOUNT APPROVED A Matthew Smith, Attest: Rosemarie Call Date: 3 $ 393,114.04 ($37,518.58) $355,595.46 Assistan City Attorney CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, II City Manager WiLI/(two) Recommended By: City of Clearwater Tara Kivett Construction Manager lichael D. Quillen, PE,/ City Engineer Page 2 of 2 Administrative Change Order 1 & Final: Berkley Place Drainage Improvements ITEM DESCRIPTION UNIT tv UNIT COST TOTAL COST Code A: Decreases: Removal & Replacement of unsuitable Material 104 (as needed) CY 115 $ 35.00 204 Valley Gutter Curb (City Index 101) LF 236 $ 17.00 209 Driveway Restoration (In Kind) SY 53.5 $ 70.00 210 Sodding LS 1 $ 11,870.00 401 15" RCP LF 24 $ 81.90 402 14" X 23" ERCP LF 3 $ 122.00 403 18" RCP LF 15 $ 114.00 411 Contingency LS 1 $ 30,501.14 Total (Decreases) for Code A: Increases: 2" Asphaltic Concrete Structural Course Type S- 201 III TN 17.77 $ 138.00 203 12" Stabilized Subgrade (LBR 40) SY 301 $ 13.10 205 Straight Curb (City Index 101) LF 7 $ 45.00 206 Type 1 Curb (City Index 101) LF 33 $ 45.00 207 4" Concrete Sidewalk SF 60 $ 7.25 208 Pedestrain Ramp Detectable Warning EA 2 $ 1,765.00 404 24" RCP LF 163 $ 122.00 Total Increases for Code A: ($4,025.00) ($4.012.00) ($3,745.00) ($11,870.00) ($1.965.60) ($366.00) ($1,710.00) ($30,501.14) ($58,194.74) $2,452.26 $3,943.10 $315.00 $1,485.00 $435.00 $3,530.00 $19,886.00 $32,046.36 Additions: 211 Adjust Manholes LS I $ 625.00 $625.00 212 Speed Tables LS 1 $ 4,830.00 $4,830.00 412 Underdrain LS I $ 4,593.75 $4,593.75 413 Conflict Between S9 and 10 LS 1 $ 2,732.00 $2,732.00 Total Additions for Code A: $12,780.75 Total Net (Decreases) /Increases /Additions Code A: ($13,367.63) Code B: Decreases: 501 6" DI WM (RJ) Vert. Offset Assembly LS 0.1161 $ 5,680.00 503 3/4" Service Connection (as needed) EA 4 $ 1,330.00 504 Relocate Existing 3/4" Meter (as needed) EA 2 $ 385.00 505 Contingency LS 1 $ 1,841.50 Total (Decreases) for Code B: ($659.45) ($5,320.00) ($770.00) ($1,841.50) (S8,590.95) Code C: Decreases: 601 Sanitary Lateral Service Assembly 602 F & I Sanitary Cleanout (as needed) 604 Contingency EA 2 $ 2,950.00 EA 7 $ 895.00 LS 1 $ 3,395.00 Total (Decreases) for Code B: Total Net (Decreases) /Increases /Additions to the Contract: ($5,900.00) ($6,265.00) ($3,395.00) ($15.560.0()) ($37,518.58)