Loading...
IDLEWILD/THE MALL SANITARY SEWER SYSTEM AND WOODLAWN STORMWATER IMPROVEMENT PROJECT - 10-0034-UT - ADMINISTRATIVE CHANGE ORDER #1 & FINALAdministrative Change Order 1 &Final PROJECT Idlewild/The Mall Sanitary Sewer System & Woodlawn Stormwater Improvements CONTRACTOR: Metro Equipment Services, Inc. 9415 SW 72 St. Miami, FL 33173 Date: PROJECT NUMBER: PO REFERENCE NO.: COUNCIL AWARD: DATE OF CONTRACT: February 22, 2016 10- 0034 -UT ST109507 May 16, 2013 June 14, 2013 Code A: 0315- 96630 - 563800 -533- 000 -0000 Code B: 0315- 96169 - 563700 -539- 000 -0000 SCOPE OF CHANGE: THIS CHANGE ORDER ACCEPTS REVISIONS TO THE CONTRACT with decreases, increases and additional items according to field conditions. STATEMENT OF CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT Administrative Change Order 1 &Final - CM NEW CONTRACT AMOUNT ACCEPTED BY: Metro $6,530,378.80 ($1,006,096.61) By: 24,282.19 Jorge Rosemarie Call, CITY OF CLEARWATER, in PINELLAS COUNTY, FLORIDA William B. Horne, H APP VE 1 AS 1 FO 4att City Manager M ew Smith, ' Assistant City Attorney Witnesses: (two nip 1 (Ion ru- Recommended By: City of Clearwater 1 Lan -Anh Nguyen, PE Michael D Quillen, PE, Project Manager City Engineer Page 2 of 4 Administrative Change Order 1 &Final: Idlewild/The Mall Sanitary Sewer System ITEM DESCRIPTION UNIT OUANTTTY UNIT COST TOTAL COST Code A: Decreases: 4 Furnish and install 8" PVC SDR -26 LF 498 $ 43.00 ($21,414.00) gravity sewer pipe 5 Furnish and Install 8" Ductile Iron LF 198 $ 76.00 ($15,048.00) Gravity Sewer Pipe 6 Furnish and Install 10" PVC SDR -26 LF 70 $ 53.00 ($3,710.00) Gravity Sewer Pipe 7 Furnish and Install 12" PVC SDR -26 LF 27 $ 60.00 ($1,620.00) Gravity Sewer Pipe 9 Replace Water Service Lateral Pipe EA 425 $ 610.00 ($259,250.00) 13 Furnish and Install Ductile Iron TN 0.09 $ 3,000.00 ($270.00) Fittings 18 Furnish and Install Sewer Street EA 61 $ 1,500.00 ($91,500.00) Lateral and Cleanout 19 Furnish and Install Sewer Service EA 136 $ 2,900.00 ($394,400.00) Lateral 20 Abandon Existing Septic Tank EA 83 $ 1,176.00 ($97,608.00) 22 Export Unsuitable Materials CYD 1500 $ 5.00 ($7,500.00) 23 Import of Select Fill Material CYD 1900 $ 8.00 ($15,200.00) 24 Mill and Resurface Asphalt SY 815 $ 9.00 ($7,335.00) 26 As- Requested Concrete Sidewalk and SY 821.945 $ 24.75 ($20,343.14) Driveway 27 As- Requested Concrete Curb and LF 977.5 $ 14.00 ($13,685.00) Gutter 28 Root Pruning LF 5884 $ 2.85 ($16,769.40) 30 Tree Removal Trunk Diameter 13 -inch EA 5 $ 250.00 ($1,250.00) to 24 -inch 31 Tree Removal Trunk Diameter 25 -inch EA 4 $ 600.00 ($2,400.00) to 36 -inch 32 Tree Removal Trunk Diameter 37 -inch EA 3 $ 975.00 ($2,925.00) to 48 -inch 34 Pinellas County Sewer Lateral LS 0.485284007 $ 30 000.00 ($14,558.52) Connection Building Permit Fee 35 Sanitary Sewer Contingency 10% LS 1 $ 549,258.30 ($549,258.30) Total (Decreases) Code A: ($1,536,044.36) Increases: 1 Mobilization LS 0.095057034 $ 263,000.00 $25,000.00 8 Furnish and Install Relocated Water LF 220 $ 23.86 $5,249.20 Main - 6" C -900 PVC 11 Furnish and Install 6" Line Stop EA 3 $ 2,500.00 $7,500.00 21 Furnish and Install Flowable Fill CYD 78 $ 75.00 $5,850.00 29 Tree Removal Trunk Diameter 12 -inch EA 7 $ 50.00 $350.00 or Less 33 Tree Removal Trunk Diameter 49 -inch EA 4 $ 1,600.00 $6,400.00 or Greater Total Increases Code A: $50,349.20 Additions: 55 6" diameter watermain w restraints 0- LF 45 $ 80.95 $3,642.75 4' deep 56 6" diameter watermain w restraints 4- LF 40 $ 97.14 $3,885.60 8'deep Page 3 of 4 Administrative Change Order 1 &Final: Idlewild/The Mall Sanitary Sewer System ITEM DESCRIPTION 57 6" diameter watermain w restraints 8- 12' deep 58 6" diameter watermain pipe 59 18" Steel Casing with Spacers 60 6" Resilient wedge gate valve 61 Pipe connecting service laterals to homes 62 Asphalt Leveling Course 63 Asphalt removal at State Street 64 1266 Idlewild Ground Cover 65 Pipe Restocking Fee 66 Mill and Resurface Union Street 67 Relocation of Construction Staging Area 68 Constructed Quantity Variation Claim 69 Water Service Replacement Asphalt Allocation 70 Speed Hump Credit 71 Lantana Phase 1 Restoration 72 1212 Sedeeva Cir. N additional Service lateral 73 Multiple Driveway Restoration UNIT QUANTITY UNIT COST LF 40 $ 113.33 LF LF EA LS LS LS LS LS LS LS LS LS LS LS LS 15 20 1 1 1 1 1 1 1 1 1 1 1 1 1 80.95 358.95 2,750.00 218,007.68 41,479.83 1,167.80 4,598.51 3,480.43 6,480.00 11,602.59 130,924.00 60,954.67 (6,000.00) 3,372.00 1,549.24 LS 1 $ 11,183.25 Total Additions Code A: Total Net (Decreases) /Increases /Additions Code A: TOTAL COST $4,533.20 $1,214.25 $7,179.00 $2,750.00 $218,007.68 $41,479.83 $1,167.80 $4,598.51 $3,480.43 $6,480.00 $11,602.59 $130,924.00 $60,954.67 ($6,000.00) $3,372.00 $1,549.24 $11,183.25 $512,004.80 Code B: Decreases: 40 Furnish and Install 18" RCP Storm Sewer Pipe 42 Furnish and Install 42" RCP Storm Sewer Pipe 43 Furnish and Install 23"x 14" ERCP Storm Sewer Pipe 44 Furnish and Install 38 "x24" ERCP Storm Sewer Pipe 45 Furnish and Install 29 "X45" ERCP Storm Sewer Pipe 46 Furnish and Install 38 "x60" ERCP Storm Sewer Pipe 48 Furnish and Install Precast Storm Sewer Manholes 54 Stormwater Contingency Increases: 39 Furnish and Install 15" RCP Storm Sewer Pipe 50 Connection to Existing Storm Inlet /Structures 52 4" Non - Reinforced Concrete Ditch Pavement (Inlets) LF LF LF LF LF LF EA LS LF EA SY 12 $ 32 $ 14 8 3 3 2 1 2 4 3 55.00 71.00 50.00 65.00 90.00 150.00 2,600.00 $ 44,412.50 Total (Decreases) Code B: 50.00 1,700.00 15.00 Total Increases Code B: ($973,690.36) ($660.00) ($2,272.00) ($700.00) ($520.00) ($270.00) ($450.00) ($5,200.00) ($44,412.50) ($54,484.50) $100.00 $6,800.00 $45.00 $6,945.00 Page 4 of 4 Administrative Change ITEM DESCRIPTION Additions: 74 18" RCP Replacement 75 Pond Tree Removal Order 1 &Final: Idlewild/The Mall Sanitary Sewer System UNIT QUANTITY UNIT COST LF 160 $ 63.89 LS 1 $ 4,910.85 Total Additions Code B: Total Net (Decreases) /Increases /Additions Code B: TOTAL COST $10,222.40 $4,910.85 $15,133.25 ($32,406.25) Total Net (Decreases)/Increases /Additions to the Contract: ($1,006,096.61)