Loading...
PROPOSAL - CREST LAKE PARK VETERAN'S MEMORIAL PROJECTKEYSTONE EXCAVATORS, INC. CUCO 56698 FPSCV 72520700011996 Proposal February 22, 2016 TO: Leroy Chin City of Clearwater — Parks & Recreation Department 100 S. Myrtle Ave., Suite 120 Clearwater, FL 33756 RE: Crest Lake Park, Veteran's Memorial Project Leroy, 371 Scarlet Blvd. Oldsmar, FL 34677 Phone 813- 854 -2342 Fax 813 - 854 -2993 As requested, enclosed is the proposal for construction/demolition of Crest Lake — Veteran's Memorial submitted in accordance with technical specs /plans /study /clarifications of this letter /attached line item work,etc., for a Guaranteed Maximum Price of $230,039.98 . Scope of Work: Sitework, including tree removal, sidewalk demolition/restoration, storm drain installation, and parking lot work . Cost Detail: Description Amount Cost of Work Subtotal $209,127.25 General Conditions (or General Conditions/Supervision/Insurance/Bond) Construction Management Fee Contingency _10_% $ 20,912.73 Guaranteed Maximum Price $230,039.98 Project Duration shall be 180 calendar days from the date of the Notice to Proceed. 1 Existing Contract: This proposal is submitted in conjunction with the existing Construction Manager at Risk Services Continuing Contract entered into with the City of Clearwater on June 17, 2013, based on RFQ #15 -13. If GMP Exceeds $150,000: Per Section III, Article 5.1 of the Contract Specifications, the contractor shall provide to the public entity a certified copy of the recorded bond. Once the City receives a certified copy of the recorded bond, a Notice to Proceed may be issued. Include the attached bond form as well as the Power of Attorney. (If GMP is less than $150,000 a bond is not required.) For work performed, invoices shall be submitted to the City of Clearwater, Parks & Recreation Department, Attn: Leroy Chin, Park Planning & Project Manager, P.O. Box 4748, Clearwater, Florida, 33758 -4748. Contingency services may be billed only after written authorization is provided by the City to proceed with those services. Countersigned: clew e gCr t\ft. S George N. Cretekos Mayor Assistant City Attorney KEYSTONE EXCAVATORS, INC. By: Aff CA Print Name: Robert C. Fornwalt Title: President CITY OF CLEARWATER, FLORIDA By: W t iita7 . William B. Horne II City Manager Attest: 1.4,L- - a-'Z`t' O et-et Rosemarie Call City Clerk 2 KEN BURKE, CLERK OF COURT AND COMPTROLLER PINELLAS COUNTY, FL INST# 2016052685 02123120328 101:6 PM OFF REC BK: 19093 PG: DocType :BOND RECORDING: $27.00 PUBLIC CONSTRUCTION BOND (1) Bond No.: "718/673 /7 This bond is given to comply with § 255.05, Florida Statutes, and any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in subsections (2) and (10). Pursuant to § 255.05(1)(b), Florida Statutes, "Before commencing the work or before recommencing the work after a default or abandonment, the contractor shall provide to the public entity a certified copy of the recorded bond. Notwithstanding the terms of the contract or any other law governing prompt payment for construction services, the public entity may not make a payment to the contractor until the contractor has complied with this paragraph." CONTRACTOR Keystone Excavators, Inc. 371 Scarlet Blvd. Oldsmar, FL 34677 813- 854 -2342 PROJECT DESCRIPTION: SURETY Developer's Surety & Indemnity Co. 17771 Cowan Ave, Suite 100 Irvine, CA 92614 727 - 822 -5610 OWNER City of Clearwater Parks & Recreation Department 100 S. Myrtle Avenue, Suite 120 Clearwater, FL 33756 (727) 562 -4856 PROJECT NAME: Crest Lake Park — Veteran's Memorial PROJECT NO.: TBD BY THIS BOND, We, Keystone Excavators, Inc., as Contractor, and Developer's Surety & Indemnity, a corporation, as Surety, are bound to the City of Clearwater, Florida, herein called Owner, in the sum of $230,039.98, for payment of which we bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and severally. THE CONDITION OF THIS BOND is that if Contractor: 1. Performs the proposal dated February 15, 2016, between Contractor and Owner for construction of Crest Lake Park — Veteran's Memorial , the contract documents being made a part of this bond by reference (which include the Advertisement for Bids, Proposal, Contract, Surety Bond, Instructions to Bidders, General Conditions, Plans, Technical Specifications and Appendix, and such alterations as may be made in said Plans and Specifications as therein provided for), at the times and in the manner prescribed in the contract; and 2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida Statutes, supplying Contractor with labor, materials, or supplies, used directly or indirectly by Contractor in the prosecution of the work provided for in the contract; and 3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including appellate proceedings, that Owner sustains because of a default by Contractor under the contract; and Bond No.: 1718/5156 PUBLIC CONSTRUCTION BOND (2) 4. To the limits of § 725.06(2), Florida Statutes, shall indemnify and hold harmless Owner, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney's fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor and persons employed or utilized by Contractor in the performance of the construction contract; and 5. Performs the guarantee of all work and materials furnished under the contract for the time specified in the contract, then this bond is void; otherwise it remains in full force. 6. Any action instituted by a claimant under this bond for payment must be in accordance with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. 7. Any changes in or under the contract documents and compliance or noncompliance with any formalities connected with the contract or the changes does not affect Surety's obligation under this bond, and Surety does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications. IN TESTIMONY WHEREOF, witness the hands and seals of the parties hereto this 23rd day of _February , 2016 . (If sole Ownership or Partnership, two (2) Witnesses required). (If Corporation, Secretary only will attest and affix seal). WITNESS: t//�., da /i% , — /4/0" iporate Secre or Witness rint Name: Jamie K. Fornwalt (affix corporate se' rt (Power of Attorney must be attached) KEYSTONE EXCAVATORS, INC.. By: Title: President Print Name: Robert C. Fornwalt • WITNESS: Print Name: Developer's , urety & Indemnity C 1 p nv ATTORNEY -IN-FACT Print Name: Warren M. Shrum, Jr. , (affix corporate seal) POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY PO Box 19725, IRVINE, CA 92623 (949) 263 -3300 KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY, does hereby make, constitute and appoint ***Warren M. Shrum Jr. * ** as its true and lawful Attomey(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporation, as surety, bonds, undertakings and contracts of suretyship giving and granting unto saki Attomey(s )-in -Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as each of said corporation could do, but reserving to each of said corporation full power of substitution and revocation, and all of the acts of said Attorneys) -in -Fad, pursuant to these presents, are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolution adopted by the Board of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY, effective as of January 1st, 2008. RESOLVED, that a combination of any two of the Chairman of the Board, the President, any Executive Vice- President, Senior Vice- President or Vice - President of the corporation be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorneys) named in the Power of Attorney to execute, on behatf of the corporation, bonds, undertakings and contrails of suretyship; and that the Secretary or any Assistant Secretary of the corporation be, and each of them hereby is, authorize( to attest the execution of any such Power of Attorney; RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attomey or to any certificate relating thereto by facsimile, and any such Power of Attomey or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond, undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY has caused these presents to be signed by its officers and attested by its Secretary or Assistant Secretary this December 1, 2014. 14ark J. Lansdon, Vice-President State of California - County of Orange On December 1,2014 personally appeared Date before me, Lucille Raymond, Notary Public Here Insert Name and Title of the Officer Daniel Young and Mark J. Lansdon Name(s) of Signer(s) LUCILLE RAYMOND Commission • 2081815 Notary Public • CWlomia Orange County Comm. Expires Oct 18, 2018 who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is /are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capaaty(es), and that by hislherhheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Place Notary Seal Above Signature CERTIFICATE I _ 6-41/7" Raymond, Notary Public The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETYAND INDEMNITY COMPANY does hereby certify that the foregoing Power of Attomey remains in full force and has not been revoked and, furthermore, that the provisions of the resolution of the Board of Directors of said corporation set forth in the Power of Attorney are in force as of the date.gf this Certificate. Thik,Certificate is executed in the City of Irvine, California, this 23rd day of February 2016 . $y' Cassie J,, Berrisf orfj $ssistant Secretary ID- 1438(i4/.12/14) KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Phone 813 - 854 -2342 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Date : Feb. 15 , 2016 Item # Item Description Quantity UNIT PRICE Amounts 1 MOBILIZE EQUIP & CREW ON -SITE 1 LS ' $ 3,448.00 $ 3,448.00 2 SILT FENCE 1,367`LF $ 2.00 $ 2,734.00 3 SURVEY LAYOUT & AS- BUILTS By OTHERS 4''MAINTofTRAFFIC 1 LS $ 1,504.00 $ 1,504.00 5 FLOATING TURBIDITY BARRIER 60 LF $ 15.00 { $ 900.00 6 TREE BARRICADES 800 LF $ 3.00 $ 2,400.00 7 TREE REMOVAL ( 0" to 12" Diameter) 57 EA $ 525.00 $ 29,925.00 8 TREE REMOVAL (13" to 24" Diameter) 38 EA $ 950.00 $ 36,100.00 9REMOVE 6" SIDEWALKS & SLAB 3,440; SF $ 1.85 $ 6,364.00 10 DEMOLISH POWER POLES , ELECTRICAL ITEMS - BY OTHERS By OTHERS 11 DEMOLISH SIGNS & COLUMNS - BY OTHERS By OTHERS 12`DEMOLISH POWER POLES , ELECTRICAL ITEMS - BY OTHERS By OTHERS UNSUITABLE MAT'L ( Remove Broken 13 Concrete), EAST BERM at SR 60 /Lake Dr 470 CY $ 6.00 $ 2,820.00 14 UNSUITABLE MAT'L ( Remove Broken Concrete) at SOUTH BERM is TO REMAIN 15: EARTHWORK - see Below items 16 €EXCAVATE POND A 190 CY = $ 6.00 $ 1,140.00 17, FINAL GRADING 1 LS $ 3,568.00 $ 3,568.00 18 EXCAVATE POND B 583 CY = $ 6.00 $ 3,498.00 19 BERMS , GRADE Site to drain to, 47,100 SF $ 0.35 New Swales $ 16,485.00 20 CONTROL STRUCTURE & SKIMMER 1, EA = $ 3,374.00 $ 3,374.00 21 TYPE "C" INLETS 3 EA $ 2,850.00 $ 8,550.00 22 318" Mitered End Section 2 , EA $ 850.00 $ 1,700.00 23,15" Mitered End Section 2 EA E $ 800.00 $ 1,600.00 24 6" Mitered End Section 1, EA $ 250.00 $ 250.00 25;18" RCP 245;, LF $ 56.00 $ 13,720.00 26 15" PVC Storm pipe 95 LF $ 28.00 $ 2,660.00 27;15" RCP 44 LF $ 48.00 $ 2,112.00 28 =6" Solid PVC Storm pipe 52 LF $ 16.00 $ 832.00 6" Pert. UNDERDRAIN in POND 29 ("* 6' Wide section of Rock and Sand) 94 LF $ 55.00 $ 5,170.00 Page 1 of 6 KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Phone 813 - 854 -2342 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Date : Feb. 15 , 2016 Item # Item Description Quantity UNIT PRICE Amounts 30 CLEANOUTS for UNDERDRAIN 4 EA $ 240.00 $ 960.00 31 GRADE for Wall Footers 96 LF $ 6.00 $ 576.00 32 PREP for AREA at Sidewalks, Pavers, etc. 17,661 SF $ 0.25 $ 4,415.25 33 PREP for Asphalt Parking Lot 742 SY $ 2.25 $ 1,669.50 34 9" STABILIZ, LBR-40 742 SY $ 6.00 $ 4,452.00 35 VERTICAL CURB 487 LF $ 19.00 $ 9,253.00 36 8" thick CRUSHED CONCRETE BASE 742 SY $ 19.00 $ 14,098.00 37 ` 1 1/2" Type S -1 ASPHALT 742 SY $ 11.00 $ 8,162.00 38 RUBBLE RIPRAP at pipe ends 22 TON $ 80.00 $ 1,760.00 39 PARKING STALL STRIPES 10 EA $ 22.00 $ 220.00 40 HANDICAPPED SIGN AND STRIPES 2 EA $ 260.00 $ 520.00 41 PARKING LOT WHEEL STOPS 10 EA $ 42.00 $ 420.00 42 PARKING LOT STOP SIGNS 1 EA $ 170.00 $ 170.00 43 6" CONCRETE WALK , with PICTURE FRAMING By OTHERS 6" thick Concrete SIDEWALK 44 at Parking Lot 2,010 SF $ 4.75 $ 9,547.50 45 SURFACE HANDICAP RAMPS with TACTILE SURFACE at Parking Lot 2 EA $ 1,025.00 $ 2,050.00 46 6" thick Concrete SIDEWALK at S.R. 60 / S. Lake Dr Intersection By OTHERS 47 ADA HANDICAP RAMPS with TACTILE SURFACE at S.R. 60 Intersection By OTHERS 48 SOD , IRRIGATION , LANDSCAPING - BY OTHERS By OTHERS $ 209,127.25 COMPANY'S NAME : KEYSTONE EXCAVATORS, INC. ADDRESS : 371 Scarlet Blvd CITY : Oldsmar ZIP CODE : 34677 TELEPHONE : 813 -854 -2342 FAX : 813 - 854 -2993 E MAIL : Dave(a KevstoneE avators.com PRINTED NAME : David Atkins SIGNED: TITLE: Estimator DATE : 7/5-7-4/G Page 2 of 6 KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Phone 813 - 854 -2342 Date : Feb. 15 , 2016 Item # Item Description Quantity UNIT PRICE Amounts CITY - Funded Portion 1 MOBILIZE EQUIP & CREW ON -SITE 1 LS $ 1,724.00 $ 1,724.00 2SILT FENCE 450: LF $ 2.00 $ 900.00 3SURVEY LAYOUT & AS- BUILTS By OTHERS f 4 MAINT of TRAFFIC 1 ? LS $ 496.32 $ 496.32 5: FLOATING TURBIDITY BARRIER 30 LF ` $ 15.00 $ 450.00 6 TREE BARRICADES 264, LF $ 3.00 $ 792.00 7 TREE REMOVAL ( 0" to 12" Diameter) 25 EA $ 525.00 $ 13,125.00 8 TREE REMOVAL (13" to 24" Diameter) 5 EA $ 950.00 $ 4,750.00 9 REMOVE 6" SIDEWALKS & SLAB 0 :SF $ 1.85 $ - 10DEMOLISH POWER POLES , ELECTRICAL ITEMS - BY OTHERS By OTHERS 11 DEMOLISH SIGNS & COLUMNS - BY OTHERS By OTHERS 12 =DEMOLISH POWER POLES , ELECTRICAL ITEMS - BY OTHERS By OTHERS 13 UNSUITABLE MAT'L ( Remove Broken Concrete), EAST BERM at SR 60 /Lake Dr CY E $ 6.00 $ - E 14 UNSUITABLE MAT'L ( Remove Broken Concrete) at SOUTH BERM is TO REMAIN 15? EARTHWORK - see Below items 16 EXCAVATE POND A 190 CY $ 6.00 $ 1,140.00 17 FINAL GRADING 1 LS $ 1,177.44 $ 1,177.44 18 EXCAVATE POND B CY $ 6.00 $ - 19 EXLAVA I t IltKM5 , GKAUt bite to Grain to New SwAIPs 16,750 SF t $ 0.35 $ 5,862.50 20 CONTROL STRUCTURE & SKIMMER EA $ 3,374.00 $ - 21 TYPE "C" INLETS 2 EA $ 2,850.00 $ 5,700.00 22 :18" Mitered End Section 1 ? EA ' $ 850.00 $ 850.00 23;15" Mitered End Section 1 EA $ 800.00 $ 800.00 24 6" Mitered End Section 1 :EA ` $ 250.00 $ 250.00 2518" RCP 46 LF $ 56.00 $ 2,576.00 26;:15" PVC Storm pipe :LF $ 28.00 $ - 2715" RCP 18 LF $ 48.00 $ 864.00 28 6" Solid PVC Storm pipe 52,LF : $ 16.00 $ 832.00 Page 3 of 6 KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Phone 813 - 854 -2342 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Date : Feb. 15 , 2016 Item # Item Description Quantity UNIT PRICE Amounts 6" Perf. UNDERDRAIN in POND 29 (" 6' Wide section of Rock and Sand) 32 LF $ 55.00 $ 1,760.00 30CLEANOUTS for UNDERDRAIN 2 EA $ 240.00 $ 480.00 31 GRADE for Wall Footers LF $ 6.00 $ - 32 PREP for AREA at Sidewalks, Pavers, etc. 2,010 SF $ 0.25 $ 502.50 33 PREP for Asphalt Parking Lot 742 SY $ 2.25 $ 1,669.50 34 9" STABILIZ, LBR-40 742 SY $ 6.00 $ 4,452.00 35 VERTICAL CURB 487 LF $ 19.00 $ 9,253.00 36 8" thick CRUSHED CONCRETE BASE 742 SY $ 19.00 $ 14,098.00 37 1 1/2" Type S -1 ASPHALT 742 SY $ 11.00 $ 8,162.00 38 RUBBLE RIPRAP at pipe ends 11 TON: $ 80.00 $ 880.00 39 PARKING STALL STRIPES 10 EA $ 22.00 $ 220.00 40 HANDICAPPED SIGN AND STRIPES 2 EA $ 260.00 $ 520.00 41 PARKING LOT WHEEL STOPS 10 EA $ 42.00 $ 420.00 42 PARKING LOT STOP SIGNS 1 EA ' $ 170.00 $ 170.00 43 6" CONCRETE WALK , with PICTURE FRAMING By OTHERS 6" thick Concrete SIDEWALK 44 at Parking Lot 2,010 SF $ 4.75 $ 9,547.50 45ADA HANDICAP RAMPS with TACTILE SURFACE at Parking Lot 2 EA $ 1,025.00 $ 2,050.00 46 6" thick Concrete SIDEWALK at S.R. 60 / S. Lake Dr Intersection By OTHERS 47 ADA HANDICAP RAMPS with TACTILE SURFACE at S.R. 60 Intersection By OTHERS 48 SOD , IRRIGATION , LANDSCAPING - BY OTHERS By OTHERS $ 96,473.76 Page 4 of 6 KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Phone 813 - 854 -2342 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Date : Feb. 15 , 2016 Page 5 of 6 Tampa Bay Veteran's Alliance Portion 11MOBILIZE EQUIP & CREW ON -SITE ? 1' LS $ 1,724.00 UNIT 2 SILT FENCE 917 LF $ 2.00 Item # Item Description Quantity PRICE Amounts Page 5 of 6 Tampa Bay Veteran's Alliance Portion 11MOBILIZE EQUIP & CREW ON -SITE ? 1' LS $ 1,724.00 $ 1,724.00 2 SILT FENCE 917 LF $ 2.00 $ 1,834.00 3 SURVEY LAYOUT & AS- BUILTS By OTHERS 4 MAINT of TRAFFIC 1 LS 1,007.68 $ 1,007.68 5 FLOATING TURBIDITY BARRIER 30`LF $ 15.00 $ 450.00 6=TREE BARRICADES 536LF $ 3.00 $ 1,608.00 7TREE REMOVAL ( 0" to 12" Diameter) 32 EA x $ 525.00 $ 16,800.00 8TREE REMOVAL (13" to 24" Diameter) 33 EA = $ 950.00 $ 31,350.00 { 9 REMOVE 6" SIDEWALKS & SLAB 3,440 SF $ 1.85 $ 6,364.00 10 DEMOLISH POWER POLES , ELECTRICAL ITEMS By OTHERS 11 DEMOLISH SIGNS & COLUMNS - BY OTHERS By OTHERS 12 DEMOLISH POWER POLES , ELECTRICAL ITEMS - BY OTHERS By OTHERS ;UNSUITABLE MAT L ( Remove Broken 13 =Concrete), EAST BERM at SR 60 /Lake Dr 470 CY $ 6.00 $ 2,820.00 14 UNSUITABLE MAT'L ( Remove Broken Concrete) at SOUTH BERM is TO REMAIN 15 EARTHWORK - see Below items 16 EXCAVATE POND A 17 FINAL GRADING 1 LS $ 2,390.56 $ 2,390.56 18 EXCAVATE POND B 583 CY ' $ 6.00 $ 3,498.00 EXCAVATE BERMS , GRADE Site to drain to' 19 New Swales 30,350 SF € $ 0.35 $ 10,622.50 20 CONTROL STRUCTURE & SKIMMER 1 EA $ 3,374.00 $ 3,374.00 21 TYPE "C" INLETS 1 EA $ 2,850.00 $ 2,850.00 22 18" Mitered End Section { 1 EA $ 850.00 $ 850.00 23 =15" Mitered End Section 1 EA i $ 800.00 $ 800.00 24 6" Mitered End Section 25;18" RCP 199 LF f $ 56.00 $ 11,144.00 26 15" PVC Storm pipe 95 = LF $ 28.00 $ 2,660.00 Page 5 of 6 KEYSTONE EXCAVATORS , INC. CUCO license 56698 371 Scarlet Blvd., Oldsmar , FL 34677 FPSCV license 725207000196 Phone 813 - 854 -2342 Bid to City Clearwater , Parks Dept . for CREST LAKE PARK Date : Feb. 15 , 2016 Item # Item Description Quantity UNIT PRICE Amounts 27 15" RCP 26 LF $ 48.00 $ 1,248.00 28 6" Solid PVC Storm pipe 6" Perf. UNDERDRAIN in POND 29 ( ** 6' Wide section of Rock and Sand) 62 LF $ 55.00 $ 3,410.00 30 CLEANOUTS for UNDERDRAIN 2 EA $ 240.00 $ 480.00 31 GRADE for Wall Footers 96 LF $ 6.00 $ 576.00 32 PREP for AREA at Sidewalks, Pavers, etc. 15,651 SF $ 0.25 $ 3,912.75 33 PREP for Asphalt Parking Lot 34 9" STABILIZ, LBR-40 35 VERTICAL CURB 36 8" thick CRUSHED CONCRETE BASE 37 1 1/2" Type S -1 ASPHALT 38 RUBBLE RIPRAP at pipe ends 11 TON: $ 80.00 $ 880.00 39 PARKING STALL STRIPES 40 HANDICAPPED SIGN AND STRIPES 41 PARKING LOT WHEEL STOPS 42 PARKING LOT STOP SIGNS 43 6" CONCRETE WALK , with PICTURE FRAMING By OTHERS 44 6" thick Concrete SIDEWALK at Parking Lot By OTHERS 45 ADA HANDICAP RAMPS with TACTILE SURFACE at Parking Lot By OTHERS 46 6" thick Concrete SIDEWALK at S.R. 60 / S. Lake Dr Intersection By OTHERS 47 ADA HANDICAP RAMPS with TACTILE SURFACE at S.R. 60 Intersection By OTHERS 48 SOD , IRRIGATION , LANDSCAPING - BY OTHERS B OTHERS Page 6 of 6 $ 112,653.49